| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC | ₹1.0 Cr | L1 | Accepted-AOC AS PER UPLOADED |
| 2 | L2₹1.1 Cr+₹4.3 L (4.11%)Rejected-Finance 947 C ASHOK NAGAR COLONY HUMAYUNPUR POLICE STATION GORAKHNATH DISTRICT GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | ₹1.1 Cr+₹4.3 L (4.11%) | L2 | Rejected-Finance AS PER FINANCIAL EVALUATION |
| 3 | L3₹1.1 Cr+₹4.4 L (4.25%)Rejected-Finance | ₹1.1 Cr+₹4.4 L (4.25%) | L3 | Rejected-Finance AS PER FINANCIAL EVALUATION |
| 4 | L4₹1.1 Cr+₹5.1 L (4.88%)Rejected-Finance | ₹1.1 Cr+₹5.1 L (4.88%) | L4 | Rejected-Finance AS PER FINANCIAL EVALUATION |
| 5 | L5₹1.2 Cr+₹12.6 L (12.1%)Rejected-Finance | ₹1.2 Cr+₹12.6 L (12.1%) | L5 | Rejected-Finance AS PER FINANCIAL EVALUATION |
| Sl No | Description | Qty | Unit | M/s PRATIK ENTERPRISES L1 | M/S K. K. CONSTRUCTION L4 | RANJEET SINGH L2 | M/S MAA AMBE ASSOCIATES L5 | M/S PRABHAT TRADERS L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of brick work or stone work and cement concrete in lime or cement mortar and including stacking of material with in a distance of 60m as per direction of Engineer-in-charge. complete for proper completion of work. | 154.15 | Cum | 467.4 ₹72,049.71 | 400 ₹61,660 | 410 ₹63,201.5 | 535.8 ₹82,593.57 | 120 ₹18,498 Lowest |
| 2.00 | Dismantling of Reinforced cement concrete including stacking of material with in a distance of 60m as per direction of Engineer-in-charge. complete for proper completion of work. | 48.98 | Cum | 568.8 ₹27,859.82 | 575 ₹28,163.5 | 530 ₹25,959.4 | 651 ₹31,885.98 | 500 ₹24,490 Lowest |
| 3.00 | Earth work in foundation including digging and refilling the trenches with its proper disposal within 30 meters lead & 1.5 meter lift.etc.complete for proper completion of work. | 529.02 | Cum | 69.7 ₹36,872.69 | 63 ₹33,328.26 | 65 ₹34,386.3 | 79.77 ₹42,199.93 | 50 ₹26,451 Lowest |
| 4.00 | Laying PCC M-10 (1:3:6 ) with cement,coarse sand & Brick ballast in foundation with Dismantle Brick ballast & Coarse sand (sonbhdra) I/C all cost of material,labour and T.& P. etc. complete for proper completion of work. | 171 | Cum | 4,526 ₹7,73,946 | 4,500 ₹7,69,500 Lowest | 5,100 ₹8,72,100 | 5,179.58 ₹8,85,708.18 | 4,500 ₹7,69,500 Lowest |
| 5.00 | Laying C.C. (M15 1:2:4) 40mm thick with cement,coarse sand (sonbharda) & stonegrit(12.5-20mm) including all cost of materials,T&P and labours etc.complete for proper completion of work. | 19.56 | Cum | 8,399.93 ₹1,64,302.63 | 9,300 ₹1,81,908 | 7,586 ₹1,48,382.16 | 9,613.82 ₹1,88,046.32 | 7,500 ₹1,46,700 Lowest |
| 6.00 | 1st class brick work M-150 in foundation 1:6 cement mortar including all cost of materials,T&P and labours etc.complete for proper completion of work. | 322.62 | Cum | 5,097.36 ₹16,44,510.28 Lowest | 5,950 ₹19,19,589 | 5,800 ₹18,71,196 | 6,000 ₹19,35,720 | 6,000 ₹19,35,720 |
| 7.00 | 1st class brick work M-150 in super structure 1:4 cement mortar including all cost of materials,T&P and labours etc. complete for proper completion of work. | 291.24 | Cum | 5,264.24 ₹15,33,157.26 Lowest | 6,000 ₹17,47,440 | 6,200 ₹18,05,688 | 6,024.99 ₹17,54,718.09 | 6,200 ₹18,05,688 |
| 8.00 | Centering and shuttering for R.C.C. work including all cost of materials,T&P labours and other accessories required for proper completion of work. | 952.38 | Sqm | 738 ₹7,02,856.44 | 650 ₹6,19,047 | 730 ₹6,95,237.4 | 844.65 ₹8,04,427.77 | 500 ₹4,76,190 Lowest |
| 9.00Reinforcement work with cutting, bending and binding of steel 10 mm dia(Fe 550 HYSD Bar) and placing in proper position including cost of all materials, labour, T&P etc.complete for proper completion of work . | ||||||||
| 9.10 | 10 mm dia | 6.46 | MT | 55,655.04 ₹3,59,531.56 Lowest | 72,000 ₹4,65,120 | 69,000 ₹4,45,740 | 65,697 ₹4,24,402.62 | 65,000 ₹4,19,900 |
Tender Value
Refer Docs
EMD Value
₹2.7 L
Closing Date
21 May 2026, 1:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER GANDAK IRRIGATION WORK CIRCLE-1, GORAKHPUR
Reconstruction work of 06 (Type-1) quarters of Sinchpal/Belder/Meth under Irrigation Division-2, Deoria in District Kushinagar
2026_UPIDC_1146065_10
01/SE/2026-27
Open Tender
Civil Works
Item Wise
270 days
KUSHINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,714
₹2.7 L
Yes
15 Jul 2026
7 May 2026
21 May 2026
7 May 2026
21 May 2026
7 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of brick work or stone work and cement concrete in lime or cement mortar and including stacking of material with in a distance of 60m as per direction of Engineer-in-charge. complete for proper completion of work. | 154.15 | Cum | - | - |
| 2 | Dismantling of Reinforced cement concrete including stacking of material with in a distance of 60m as per direction of Engineer-in-charge. complete for proper completion of work. | 48.98 | Cum | - | - |
| 3 | Earth work in foundation including digging and refilling the trenches with its proper disposal within 30 meters lead & 1.5 meter lift.etc.complete for proper completion of work. | 529.02 | Cum | - | - |
| 4 | Laying PCC M-10 (1:3:6 ) with cement,coarse sand & Brick ballast in foundation with Dismantle Brick ballast & Coarse sand (sonbhdra) I/C all cost of material,labour and T.& P. etc. complete for proper completion of work. | 171 | Cum | - | - |
| 5 | Laying C.C. (M15 1:2:4) 40mm thick with cement,coarse sand (sonbharda) & stonegrit(12.5-20mm) including all cost of materials,T&P and labours etc.complete for proper completion of work. | 19.56 | Cum | - | - |
| 6 | 1st class brick work M-150 in foundation 1:6 cement mortar including all cost of materials,T&P and labours etc.complete for proper completion of work. | 322.62 | Cum | - | - |
| 7 | 1st class brick work M-150 in super structure 1:4 cement mortar including all cost of materials,T&P and labours etc. complete for proper completion of work. | 291.24 | Cum | - | - |
| 8 | Centering and shuttering for R.C.C. work including all cost of materials,T&P labours and other accessories required for proper completion of work. | 952.38 | Sqm | - | - |
| 9Reinforcement work with cutting, bending and binding of steel 10 mm dia(Fe 550 HYSD Bar) and placing in proper position including cost of all materials, labour, T&P etc.complete for proper completion of work . | |||||
| 9.1 | 10 mm dia | 6.46 | MT | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.77 MB
BID10.pdf
Tender Documents • 4.08 MB
BOQ_2142952.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .