Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹43.5 CrAdmitted-Finance RAJIV COLONY MURTHAL ROAD SONIPAT HARYANA 131001 | SONIPAT | HARYANA | 131001 | -25.41% | ₹43.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹46.1 Cr+₹2.6 Cr (5.93%)Admitted-Finance D O 7 1108 G 1 REVENUE WARD NO 35 MANGAMURU DONKA ONGOLE 532 002 | ONGOLE | PRAKASAM | TELANGANA | 532002 | -20.99% | ₹46.1 Cr+₹2.6 Cr (5.93%) | L2 | Admitted-Finance |
| 3 | L3₹48.3 Cr+₹4.8 Cr (11.1%)Admitted-Finance | -17.12% | ₹48.3 Cr+₹4.8 Cr (11.1%) | L3 | Admitted-Finance |
| 4 | L4₹51.9 Cr+₹8.4 Cr (19.3%)Admitted-Finance H NO 8 3 833 119 PLOT NO 119 PHASE I KAMALPURI COLONY SRINAGAR COLONY HYDERABAD 500073 TELANGANA | HYDERABAD | HYDERABAD | TELANGANA | 500073 | -11.00% | ₹51.9 Cr+₹8.4 Cr (19.3%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical NO 91 GROUND FLOOR 3RD CROSS ROAD OPPOSITE VASAVI KANNIKA PARAMESHWARI TEMPLE BENGALURU BENGALURU 560021 KARNATAKA INDIA | BENGALURU | BENGALURU | KARNATAKA | 560021 | - | - | - | Rejected-Technical Technically Non responsive |
Tender Value
₹58.3 Cr
EMD Value
₹58.3 L
Closing Date
7 May 2026, 3:00 pmClosed
Superintending Engineer R and B NH Circle Hyd
O o Superintending Engineer R and B NH Circle Hyd
Maintenance Works and Activities on 2 Lane with Paved Shoulder from Km 66 900 to Km 113 905 of Kalwakurthy Mallepally section of NH 167 in the State of Telangana through Performance Based Maintenance Contract PBMC
2026_MoRTH_904838_1
SE R and B NH HYD 02 2026 27 Dt. 07 04 2026
Open Tender
Civil Works - Roads
Percentage
1825 days
Telangana
as per RFP
5 documents required · 5 mandatory
₹11,800
RO NHAI
₹58.3 L
O o Superintending Engineer R and B NH Circle Hyd
4 Aug 2026
8 Apr 2026
8 May 2026
8 Apr 2026
7 May 2026
8 Apr 2026
8 Apr 2026 - 21 Apr 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | ROUTINE MAINTENANCE (Lump Sum)
[for Total 60 months] | - | lump sum | - | - |
| 1.02 | INITIAL RECTIFICATION WORKS (Lump
Sum) [To be completed within 06 months
from the notice to proceed] | - | lump sum | - | - |
| 1.03 | PERIODICAL MAINTENANCE WORKS
(Lump Sum) [To be completed as decided by the Engineer but overlay of Highway to be completed within 24/48 months (as the case may be) from the date of notice to proceed]. | - | lump sum | - | - |
| 1.04 | EMERGENCY WORKS (Unit Rates) | - | lump sum | - | - |
| 2Total Estimate Cost | |||||
| 3Add-GST @ 18% | |||||
| 4Estimated cost with GST | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.66 MB
rfppbmc2.pdf
Tender Documents • 2.64 MB
BOQ_951063.xls
BOQ • 0.24 MB
cor1roadasset.pdf
PDF • 1.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .