Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC | ₹1.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.6 LRejected-AOC | ₹1.6 L | L2 | Rejected-AOC L2 |
Tender Value
₹1.8 L
EMD Value
₹4,000
Closing Date
3 Feb 2026, 4:00 pmClosed
AMC Muncipal Corporation Adityapur
Kalpanapuri, Adityapur
Constrction of RCC drain in front house of S.N Jha and In front house of Chandra Shekhar Singh in ward no 15 under AMC
2026_UDD_109763_3
UDD/AMC/02/2025-26 (4th CALL)
Open Tender
Civil Works
120 days
Ward No. 15
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹4,000
Yes
1 May 2026
27 Jan 2026
4 Feb 2026
27 Jan 2026
3 Feb 2026
27 Jan 2026
Earth work in excavation for laying of different types and sizes of R.C.C. spun pipes with disposal of excavated earth within intial lead and lift as per specification and direction of E/I. (i) For classification of soil item -A.[3.3.1]
Providing course clean sand in filling in foundation tranches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building a specification and direction of E/I.[5.1.10]
Providing designation 75B one brick on flat soling joints filled with local sand including cost of watering taxes royality all complete as per buinidng specifiacation and direction of E/I.[5.6.3]
Providing RCC M-20 with nominal mix (1:1.5:3) in foundation & plinth with approved quality of stone…..do…do…direction of E/I.
Proving reinforcement for casting of rcc do……do……..[5.5.5(a)]
8mm @ 0.395kg/m
10mm @ 0.617kg/m
12mm @ 0.890kg/m
providing suttering for casting wall and slab slab….. do……… do…. E/I.[5.3.17.1]
Earthwork in back filling the trench after laying different types and sizes of RCC spun pipes with earth during excation within initiallead & lifts as per specification & direction of E/I[5.1.7]
Disposal of excavated earth in borrow area of lead 1km(k) +2km(p) ( Add 50% extra for loose volume)
Carriage of Materials
Sand 1Km(K) + 5Km(P)
cement 5 KM (P)
Chips 1 KM (k)+34 KM (P)
Bricks 1 KM (k)+7KM (p)
Reinforcement bar 5 KM (P)
Add 18% GST
Adding Labour Cess @ 1%
Adding Labour Cess @ 1%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
TERMS_CONDITIONS.pdf
Tender Documents • 1.06 MB
BOQ_148300.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid