| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.7 LAccepted-AOC | ₹30.7 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹30.8 LRejected-AOC | ₹30.8 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Kannan Construction L1 | Surya Constructions L2 |
|---|---|---|---|---|---|
| 1.00Strengthening of Road from Aritharimangalam -thamaraipakkam road to kilthamaraipakkam km-2/450-3/00 (R-3) | |||||
| 1.01 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. KM 0/0-0/550 | 990 | Cum | 6.3 ₹6,237 | 8.25 ₹8,167.50 |
| 1.02 | Picking old metalled / BT surface upto 10cm thick as directed by the departmental officers
KM 0/0-0/550 | 687.5 | Cum | 23.3 ₹16,018.75 | 25.25 ₹17,359.38 |
| 1.03 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water and other item which may be necessary or convenient to the succesful completion of the excavation in a compacted condition a quality of materials not exceeding the amount of excavation including all machinery charges for T&P employed etc., complete for cutting side drains and forming berms as per standard specifications.
KM 0/0-0/550 | 148.5 | Sqm | 140.25 ₹20,827.13 | 142 ₹21,087 |
| 1.04 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms
KM 0/0-0/550 | 148.5 | Sqm | 521.25 ₹77,405.63 | 522 ₹77,517 |
| 1.05 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
KM 0/0-0/550 | 257.81 | Sqm | 2,524.5 ₹6.5 L | 2,524.5 ₹6.5 L |
| 1.06 | Applying tack coat over Un Primed WMB/ WMM surface at 7Kg of SS-1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
KM 0/0-0/550 | 2,062.5 | Sqm | 87.15 ₹1.8 L | 88 ₹1.8 L |
| 1.07 | Applying tack coat over Un Primed WMB/ WMM surface at 2.5Kg of RS1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat in
KM 0/0-0/550 | 2,062.5 | Sqm | 20.45 ₹42,178.13 | 21 ₹43,312.50 |
| 1.08 | Providing and Laying Dense Bituminous Macadam (BM) overlay using paver after repairs to cracks and pot holes filing, mixed in hot mix plant of drum type using paving Bitumen 60/70 penetration grade as per IS 73 and percentage of bitumen shall be 4 - 3.5% by weight of total mix aggregates shall conform to grading 1 of table 500 - 4 of clause 507 of MORT&H specifications with all leads and lifts etc., complete and as directed by the Engineer. | 103.13 | Sqm | 8,894.75 ₹9.2 L | 8,894.75 ₹9.2 L |
| 1.09 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as
per clause 507 of MORTH Rev-5 | 51.56 | Sqm | 11,454.15 ₹5.9 L | 11,454.15 ₹5.9 L |
Tender Value
Refer Docs
EMD Value
₹31,800
Closing Date
11 Mar 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER(VP) PUDUPALAYAM
BLOCK DEVELOPMENT OFFICE, PUDUPALAYAM
Strengthning of Road From Aritharimangalam to Thamaraipakkam Road to Kilthamaraipakkam Km_2_450_3_00_R3
2026_RDTN_672581_1
A5/3410/2022
Open Tender
Civil Works - Roads
PUDUPALAYAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹31,800
Yes
16 Mar 2026
10 Mar 2026
11 Mar 2026
10 Mar 2026
11 Mar 2026
10 Mar 2026
Strengthening of Road from Aritharimangalam -thamaraipakkam road to kilthamaraipakkam km-2/450-3/00 (R-3)
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. KM 0/0-0/550
Picking old metalled / BT surface upto 10cm thick as directed by the departmental officers KM 0/0-0/550
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water and other item which may be necessary or convenient to the succesful completion of the excavation in a compacted condition a quality of materials not exceeding the amount of excavation including all machinery charges for T&P employed etc., complete for cutting side drains and forming berms as per standard specifications. KM 0/0-0/550
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms KM 0/0-0/550
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/0-0/550
Applying tack coat over Un Primed WMB/ WMM surface at 7Kg of SS-1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification. KM 0/0-0/550
Applying tack coat over Un Primed WMB/ WMM surface at 2.5Kg of RS1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat in KM 0/0-0/550
Providing and Laying Dense Bituminous Macadam (BM) overlay using paver after repairs to cracks and pot holes filing, mixed in hot mix plant of drum type using paving Bitumen 60/70 penetration grade as per IS 73 and percentage of bitumen shall be 4 - 3.5% by weight of total mix aggregates shall conform to grading 1 of table 500 - 4 of clause 507 of MORT&H specifications with all leads and lifts etc., complete and as directed by the Engineer.
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminou s Surface
Providing HM stones
Provision for Citizen Information Board cum Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_808306.xls
BOQ • 0.28 MB
Tender.pdf
Tender Documents • 0.26 MB
Download all tender documents and submit your bid