| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAccepted-AOC 13 2 GAYATRI NAGAR VNIT ROAD IT PARK PARSODI NAGPUR MAHARASHTRA 440022 | NAGPUR | MAHARASHTRA | 440022 | L1 | Accepted-AOC accepted | |
| 2 | L2₹10.1 L+₹1.4 L (16.0%)Rejected-AOC | L2 | Rejected-AOC rejected | |
| 3 | L3₹10.4 L+₹1.7 L (19.6%)Rejected-AOC | L3 | Rejected-AOC rejected |
| Sl No | Description | Qty | Unit | Prashant N. Kathale L3 | MICRONET SOLUTIONS L2 | imaGIS Engineering Solutions Pvt.Ltd. L1 |
|---|---|---|---|---|---|---|
| 1.00Nagpur Addl Butibori Industrial Area Detailed Survey and Access permission for laying 900 mm dia pipeline from WTP MIDC Butibori to Additional Butibori Industrial Area. | ||||||
| 1.01 | Detail survey of the proposed alignment to prepare the plan of the proposed alignment from WTP on Wardha road to Additional Butibori Industrial Area using Digital Total Station/ DGPS euipment including drawing the plan, L-sections etc. as per norms of MJP ( Length about 7.5 km) | 7.5 | Kilo meter | 72,500 ₹5,43,750 | 75,000 ₹5,62,500 | 63,000 ₹4,72,500 Lowest |
| 1.02 | Compilation of the above data and preparation of the complete proposal for the getting permission of laying the water pipeline from NHAI and submitting required no. of copies | 1 | Nos | 5,00,000 ₹5,00,000 | 4,50,000 ₹4,50,000 | 4,00,000 ₹4,00,000 Lowest |
Tender Value
₹8.9 L
EMD Value
₹8,900
Closing Date
9 Jul 2025, 11:00 amClosed
Chief Engineer MIDC Nagpur
Chief Engineer MIDC Nagpur
Nagpur Addl Butibori Industrial Area Detailed Survey and Access permission for laying 900 mm dia pipeline from WTP MIDC Butibori to Additional Butibori Industrial Area
2025_MIDC_1194737_1
E- Tender Notice No 04 of 2025-2026
Limited
Civil Works
Item Rate
Addl. Butibori
As per tender Document
2 documents required · 2 mandatory
₹5,900
₹8,900
28 Aug 2025
26 Jun 2025
11 Jul 2025
26 Jun 2025
9 Jul 2025
30 Jun 2025
27 Jun 2025 - 30 Jun 2025
Amount
Nagpur Addl Butibori Industrial Area Detailed Survey and Access permission for laying 900 mm dia pipeline from WTP MIDC Butibori to Additional Butibori Industrial Area.
Detail survey of the proposed alignment to prepare the plan of the proposed alignment from WTP on Wardha road to Additional Butibori Industrial Area using Digital Total Station/ DGPS euipment including drawing the plan, L-sections etc. as per norms of MJP ( Length about 7.5 km)
Compilation of the above data and preparation of the complete proposal for the getting permission of laying the water pipeline from NHAI and submitting required no. of copies
MICRONET SOLUTIONS (BID ID -6756931)
Prashant N. Kathale (BID ID -6757547)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .