| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-AOC 2 11 DHAJU FARIDABAD HARYANA 121004 | FARIDABAD | FARIDABAD | HARYANA | 121004 | ₹6.5 L | L1 | Accepted-AOC due to lowest amount |
| 2 | L2₹7.3 LRejected-AOC 464 21 NEW ANAJ MANDI TOHANA 125120 | FATEHABAD | HARYANA | 125120 | ₹7.3 L | L2 | Rejected-AOC due to 2nd lowest amount |
Tender Value
₹8.6 L
EMD Value
₹17,100
Closing Date
22 Apr 2026, 5:00 pmClosed
Sandeep Dahiya
DIV Faridabad
Construction of 6 Nos. Rain Water Harvesting at suitable locations in Sector-2, Faridabad complete in all respect and all other works contingent thereto.
2026_HBC_515785_1
20268BE47900 330D 4912 96B2 FAC29B77802A248HSV
Open Tender
Civil Works
60 days
Faridabad (MC)
Construction of 6 Nos. Rain Water Harvesting at suitable locations in Sector-2, Faridabad complete in all respect and all other works contingent thereto.
2 documents required · 2 mandatory
₹500
₹17,100
Yes
10 Jun 2026
17 Apr 2026
23 Apr 2026
17 Apr 2026
22 Apr 2026
17 Apr 2026
17 Apr 2026 - 19 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | [20.52.2]providing and placing in horizontal layers filtering media screened washed and cleaned as described below - 2. Second layer Coursed sand screened, cleaned and washed and graded from 3 mm to 6 mm (from Ghaggar or approved equivalent quarry) [Through Rate] | 1 | per cum | - | - | BI01010001010000000000000515BI0100001114 |
| 2 | [2.B0242] B0242. 150 mm dia PVC pipe [Rate] | - | per mtr. | - | - | BI01010001010000000000000515BI0100001115 |
| 3 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | - | per cum | - | - | BI01010001010000000000000515BI0100001116 |
| 4 | [7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] | 1 | per cum | - | - | BI01010001010000000000000515BI0100001117 |
| 5 | [6.15.1]Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 1 | per cum | - | - | BI01010001010000000000000515BI0100001118 |
| 6 | Providing and fixing of 2400 mm RCC pipe complete as per entire satisfaction of Engineer-in Charge. | - | per mtr. | - | - | BI01010001010000000000000515BI0100001119 |
| 7 | [11.11.2]12 mm cement plaster finished with a floating coat of neat cement of mix : 2. 1:4 (1 cement: 4 fine sand) [Through Rate] | 1 | per sqm | - | - | BI01010001010000000000000515BI0100001120 |
| 8 | Providing and lowering 300 mm PVC pipe 6 KG pressure with perforation having 20% area (minimum) as per
forated complete in all respect as per entire satisfaction and all other of Engineer-in-charge works contingent thereto`. | - | per mtr. | - | - | BI01010001010000000000000515BI0100001121 |
| 9 | [33.7.1.3]Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire and running charges of all equipments, tools, plants and machineries required for the job, all complete as per direction of Engineer -in-charge, beyond 90 metre and up to 150 metre depth below ground level. 1.3. All types of soil
400 mm dia [Through Rate] | - | per mtr. | - | - | BI01010001010000000000000515BI0100001122 |
| 10 | [[6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars [Through Rate] | - | per kg | - | - | BI01010001010000000000000515BI0100001123 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_594631.xls
BOQ • 0.35 MB
AD0158389.pdf
Additional Documents • 0.24 MB
Download all tender documents and submit your bid