| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹15.8 LAccepted-Finance | ₹15.8 L | 1st | Accepted-Finance First Lowest Bidder |
| 2 | 2nd₹24.3 L+₹8.6 L (54.2%)Accepted-Finance WARD NO 01 HOUSE NO 69 HIRA NAGAR HAMIRPUR H P | ₹24.3 L+₹8.6 L (54.2%) | 2nd | Accepted-Finance Second Lowest Bidder |
| 3 | Not Admitted-Fee/PreQual/Technical R O NEAR DEGREE COLLEGE ANU HAMIRPUR TEHSIL DISTRICT HAMIRPUR HP C O LINK ROAD TO SUNGRA KANDA KM 0 0 TO 4 555 SH FORMATION CUTTING 5 7 MTR WIDE ROAD C O R WALL B WALL C O UNLINED DRAIN C O CROSS DRAINAGE WORKS PARAPETS P F ROAD SIDE FURNITURE AND DUMPING SITES ETC KM 0 00 TO 4 555 | HAMIRPUR | HIMACHAL PRADESH | 174304 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Ashish Chauhan L2 | MUKESH CHAND L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling C.I. or asbestos( 100 mm dia pipe) rain water pipe with fittings and clamps including stacking the material within 50 meters lead including entire carriage of materials with in all leads, lifts, height and cost of all other incidentals. | 40 | Meter | 100 ₹4,000 | 90 ₹3,600 Lowest |
| 2.00 | Providing and fixing (110 mm dia pipe) on wall face unplasticised Rigid PVC rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10 mm gap for thermal expansion ((i) Single socketed pipes.) including entire carriage of materials with in all leads, lifts, height and cost of all other incidentals. | 40 | Meter | 350 ₹14,000 | 250 ₹10,000 Lowest |
| 3.00 | Repair to plaster of thickness 12mm to 20 mm in patches of area 2.5 sqm and under, including cutting the patch in proper shape, raking out joints and preparing plastering the wall surface with white cement based polymer modified self curing mortar, including disposal of rubbish, all complete as per the direction of Engineer-In-Charge including entire carriage of materials with in all leads, lifts, height and cost of all other incidentals. | 497 | Sqm | 520 ₹2,58,440 | 180 ₹89,460 Lowest |
| 4.00 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners,connection with the building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding including entire carriage of materials with in all leads, lifts, height and cost of all other incidentals. | 250 | Sqm. | 350 ₹87,500 | 190 ₹47,500 Lowest |
| 5.00Finishing walls with Acrylic Smooth exterior paint of required shade of approved make of including entire carriage of materials with in all leads, lifts, height and cost of all other incidentals. | |||||
| 5.01 | Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface. | 300 | Sqm. | 150 ₹45,000 | 75 ₹22,500 Lowest |
| 6.00 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete including entire carriage of materials with in all leads, lifts, height and cost of all other incidentals. | 100 | Sqm. | 150 ₹15,000 | 70 ₹7,000 Lowest |
| 7.00 | Repair of the J Bolt/screw on GI Sheet-Cleaning of J Bolt, filling with PU sealent, priming , application of Elastometric water proofing component, packing with fiber mesh followed by two layer of Elastometric water proofing component including entire carriage of materials with in all leads, lifts, height and cost of all other incidentals. Note: 10 Years Warranty Certificate to be Provided by the Agency. | 1,200 | Nos. | 25 ₹30,000 Lowest | 70 ₹84,000 |
| 8.00 | Repair of GI sheet vertical down overlap joints-Cleaning of joint, filling with PU sealent, priming, application of Elastomeric water proofing component, packing with fiber mesh followed by two layer of Elastomeric water proofing Component including entire carriage of materials with in all leads, lifts, height and cost of all other incidentals. Note: 10 Years Warranty Certificate to be Provided by the Agency. | 1,800 | Rft. | 60 ₹1,08,000 Lowest | 80 ₹1,44,000 |
| 9.00 | Providing and Applying Water Proofing Treatement on Stone Slab and Gutter Porion in following steps complete including entire carriage of materials with in all leads, lifts, height and cost of all other incidentals. (i) Cleaning and Removing of all deberies of mother surface. (ii) Wash the surface with pressure cleaning and after that priming the surface with repair polymer (In Ratio of Polymer and cement). (iii) All Cracks cleaned and repaired with PU Sealent. (iv) After Priming the Surface applying three layers of water proofing foot traficable coating. Note: 10 Years Warranty Certificate to be Provided by the Agency. | 2,599.95 | Sqm. | 720 ₹18,71,964 | 450 ₹11,69,977.5 Lowest |
Tender Value
₹24.5 L
EMD Value
₹49,041
Closing Date
8 Oct 2025, 11:00 amClosed
Executive Engineer (Civil)
Construction Cell NIT Hamirpur H.P 177005
Repair and maintenance of residential blocks. (SH Repairs of columns, beams, chajja etc., Repair to plaster, rainwater pipe change and water proofing etc. for Type-V H. No. (501-517) and Type-IV A-Block H. No. (401 to 412) at NIT Hamirpur (H.P).
2025_NITHP_874579_2
Repair and maintenance of residential blocks.SH Repairs of columns, beams, chajja etc.
Open Tender
Civil Works
Item Rate
180 days
Construction Cell NIT Hamirpur
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹49,041
3 Dec 2025
1 Oct 2025
9 Oct 2025
1 Oct 2025
8 Oct 2025
1 Oct 2025
Amount
Dismantling C.I. or asbestos( 100 mm dia pipe) rain water pipe with fittings and clamps including stacking the material within 50 meters lead including entire carriage of materials with in all leads, lifts, height and cost of all other incidentals.
Providing and fixing (110 mm dia pipe) on wall face unplasticised Rigid PVC rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10 mm gap for thermal expansion ((i) Single socketed pipes.) including entire carriage of materials with in all leads, lifts, height and cost of all other incidentals.
Repair to plaster of thickness 12mm to 20 mm in patches of area 2.5 sqm and under, including cutting the patch in proper shape, raking out joints and preparing plastering the wall surface with white cement based polymer modified self curing mortar, including disposal of rubbish, all complete as per the direction of Engineer-In-Charge including entire carriage of materials with in all leads, lifts, height and cost of all other incidentals.
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners,connection with the building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding including entire carriage of materials with in all leads, lifts, height and cost of all other incidentals.
Finishing walls with Acrylic Smooth exterior paint of required shade of approved make of including entire carriage of materials with in all leads, lifts, height and cost of all other incidentals.
Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface.
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete including entire carriage of materials with in all leads, lifts, height and cost of all other incidentals.
Repair of the J Bolt/screw on GI Sheet-Cleaning of J Bolt, filling with PU sealent, priming , application of Elastometric water proofing component, packing with fiber mesh followed by two layer of Elastometric water proofing component including entire carriage of materials with in all leads, lifts, height and cost of all other incidentals. Note: 10 Years Warranty Certificate to be Provided by the Agency.
Repair of GI sheet vertical down overlap joints-Cleaning of joint, filling with PU sealent, priming, application of Elastomeric water proofing component, packing with fiber mesh followed by two layer of Elastomeric water proofing Component including entire carriage of materials with in all leads, lifts, height and cost of all other incidentals. Note: 10 Years Warranty Certificate to be Provided by the Agency.
Providing and Applying Water Proofing Treatement on Stone Slab and Gutter Porion in following steps complete including entire carriage of materials with in all leads, lifts, height and cost of all other incidentals. (i) Cleaning and Removing of all deberies of mother surface. (ii) Wash the surface with pressure cleaning and after that priming the surface with repair polymer (In Ratio of Polymer and cement). (iii) All Cracks cleaned and repaired with PU Sealent. (iv) After Priming the Surface applying three layers of water proofing foot traficable coating. Note: 10 Years Warranty Certificate to be Provided by the Agency.
Ashish Chauhan (BID ID -3294823)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .