Loading…
Loading…
Tender Value
₹1.5 L
EMD Value
₹7,475
Closing Date
5 Oct 2026, 6:55 pm
EXECUTIVE ENGINEER REW BUDGAM
RDD COMPLEX BUDGAM
Construction of Protection wall at Jamai Masjid Hanfia Tehlipora Rakh shalina
2026_RDPR_325393_63
NIT_78_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
BK PORA
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
EXECUTIVE ENGINEER REW BUDGAM
₹7,475
21 Sept 2026
21 Sept 2026
6 Oct 2026
21 Sept 2026
5 Oct 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of labour for site clearance, including deployment of required labour for clearing the site of bushes, shrubs, grass, weeds, loose vegetation, rubbish, debris and other unwanted materials; cutting and removal of small vegetation; collection, loading, carrying and disposal of the cleared material at a suitable location as directed by the Engineer-in-Charge; and dressing, cleaning and levelling the site to the extent required, complete in all respects as per the directions of the Engineer-in-Charge. | 3 | no. | 625 | ₹1,875 |
| 2 | Earth work in excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | 4.28 | cum | 256.85 | ₹1,099.32 |
| 3 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: | 11.5 | cum | 7,677.3 | ₹88,288.95 |
| 4 | Dry rubble masonary with hard stone in foundation and plinth | 7 | cum | 2,793.8 | ₹19,556.6 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone agg 20 mm N. size) | 2.06 | cum | 7,788 | ₹16,043.28 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto and above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 164.53 | kg | 115.38 | ₹18,983.47 |
| 7 | Centering and shuttering including strutting propping etc. and removal of same for retaining walls, return walls etc | 4.91 | sqm | 286.35 | ₹1,405.98 |
| 8 | Carriage of material by mechanical transport avg lead 07 kms including head load of 50mts | 2.78 | cum | 279.04 | ₹775.73 |
| 9 | Provision for photographs signboard and paperwork, weepholes | 1 | job | 1,500 | ₹1,500 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.11 MB
BOQ_1099346.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .