Loading
Loading…
Loading…
Tender Value
Refer Docs
Closing Date
24 Jun 2021, 3:00 pmClosed
PR & CC
At VVSPL locations(VDS,RBS SBS) are having transformers with oil capacity above 2000 liters, and
21000114-HD-10120
21000114-HD-10120
Open Tender
Unknown (Unspecified Location)
₹0
Exempted
24 Jun 2021
11 Jun 2021
24 Jun 2021
24 Jun 2021
11 Jun 2021 - 19 Jun 2021
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | NIFPS for 6.3 MVA Transformer | NIFPS for 6.3 MVA Transformer — NIFPS FOR 6.3 MVA, (33 KV/6.9 KV) TRANSFORMER: THE LINE ITEM IS FOR THE DESIGN AND THE SUPPLY OF NIFPE SYSTEM FOR 6.3 MVA TRANSFORMER. THE SUPPLY INCLUDES ALL THE MATERIALS LIKE THE NITROGEN SYSTEM, HEAT DETECTORS, FRLS AND FS CABLE FOR WIRING, OIL DRAINPIPES AND VALVES REQUIRED FOR THE FULL INSTALLATION OF THE SYSTEM. | - | Each |
| 2 | NIFPS for 6.3 MVA Transformer | NIFPS for 6.3 MVA Transformer — NIFPS FOR 6.3 MVA, (11 KV/6.9 KV) TRANSFORMER: THE LINE ITEM IS FOR THE DESIGN AND THE SUPPLY OF NIFPE SYSTEM FOR 6.3 MVA TRANSFORMER. THE SUPPLY INCLUDES ALL THE MATERIALS LIKE THE NITROGEN SYSTEM, HEAT DETECTORS, FRLS AND FS CABLE FOR WIRING, OIL DRAINPIPES AND VALVES REQUIRED FOR THE FULL INSTALLATION OF THE SYSTEM. | - | Each |
| 3 | NIFPS for 5 MVA Transformer | NIFPS for 5 MVA Transformer — NIFPS FOR 5 MVA, (33 KV/6.9 KV) TRANSFORMER: THE LINE ITEM IS FOR THE DESIGN AND THE SUPPLY OF NIFPE SYSTEM FOR 5 MVA TRANSFORMER. THE SUPPLY INCLUDES ALL THE MATERIALS LIKE THE NITROGEN SYSTEM, HEAT DETECTORS, FRLS AND FS CABLE FOR WIRING, OIL DRAINPIPES AND VALVES REQUIRED FOR THE FULL INSTALLATION OF THE SYSTEM. | - | Each |
| 4 | NIFPS for 4 MVA Transformer | NIFPS for 4 MVA Transformer — NIFPS FOR 4 MVA, (33 KV/6.9 KV) TRANSFORMER: THE LINE ITEM IS FOR THE DESIGN AND THE SUPPLY OF NIFPE SYSTEM FOR 4 MVA TRANSFORMER. THE SUPPLY INCLUDES ALL THE MATERIALS LIKE THE NITROGEN SYSTEM, HEAT DETECTORS, FRLS AND FS CABLE FOR WIRING, OIL DRAINPIPES AND VALVES REQUIRED FOR THE FULL INSTALLATION OF THE SYSTEM. | - | Each |
| 5 | INSTLN AND COMMNG OF | INSTLN AND COMMNG OF — INSTALLATION AND COMMISSIONING OF NIFPS FOR TRANSFORMERS.-INCLUDES CHARGES FOR ENTIRE CIVIL AND MECHANICAL JOBS AT THE LOCATION INCLUDING THE CONSTRUCTION OF OIL SOAK PIT, THE PLINTH FOR THE PANELS, ERECTION OF THE SYSTEM AND VARIOUS PIPING JOBS. THE RATES ARE INCLUSIVE FOR ANY MODIFICATIONS IN EXISTING PROVISIONS AVAILABLE IN THE MAIN TRANSFORMER BODY THAT ARE REQUIRED FOR THE NIFPS. THE TESTING AND THE COMMISSIONING CHARGES HAVE ALSO TO BE INCLUDED IN THE RATES. | - | Each |
| 6 | MANDATORY SPARES | MANDATORY SPARES — PART NAME:MANDATORY SPARES; PART MATERIAL:N/A; PART RATING:N/A; PART NUMBER:N/A; MANUFACTURER:N/A; AS PER SPARE LIST ATTACHED WITH THE TENDER | - | Lot |
| 7 | 1st Year AMC OF NIFPS | 1st Year AMC OF NIFPS — NIFPS POST WARRANTY AMC: PWAMC OF NITROGEN INJECTION FIRE PROTECTION SYSTEM: THE ANNUAL MAINTENANCE CONTRACT OF THREE YEARS AFTER THE COMPLETION OF THE WARRANTY PERIOD OF TWO YEARS. THE VENDOR HAS TO QUOTE THE RATE FOR VISITS WHICH WILL COVER ALL THE VVSPL LOCATIONS COVERED UNDER THE PROJECT. VENDOR SHALL VISITS TO THE SITE AND INSPECT ALL INSTALLED ITEMS IN NIFPS FOR THEIR FUNCTIONALITY. AFTER EACH VISIT ALL CRITICAL EQUIPMENT’S IN THE SYSTEM ARE TO BE CERTIFIED FOR THEIR HEALTHINESS, WITH PROPER INSPECTION REPORTS. CONTRACTOR SHALL ENLIST THE REPLACEABLE/CONSUMABLES IN THE SYSTEM AND THE SAME ARE TO BE INSTALLED AS AND WHEN REQUIRED DURING THE AMC VISITS WITHOUT ANY EXTRA COST. | - | Each |
| 8 | 2nd Year AMC OF NIFPS | 2nd Year AMC OF NIFPS — NIFPS POST WARRANTY AMC: PWAMC OF NITROGEN INJECTION FIRE PROTECTION SYSTEM: THE ANNUAL MAINTENANCE CONTRACT OF THREE YEARS AFTER THE COMPLETION OF THE WARRANTY PERIOD OF TWO YEARS. THE VENDOR HAS TO QUOTE THE RATE FOR VISITS WHICH WILL COVER ALL THE VVSPL LOCATIONS COVERED UNDER THE PROJECT. VENDOR SHALL VISITS TO THE SITE AND INSPECT ALL INSTALLED ITEMS IN NIFPS FOR THEIR FUNCTIONALITY. AFTER EACH VISIT ALL CRITICAL EQUIPMENT’S IN THE SYSTEM ARE TO BE CERTIFIED FOR THEIR HEALTHINESS, WITH PROPER INSPECTION REPORTS. CONTRACTOR SHALL ENLIST THE REPLACEABLE/CONSUMABLES IN THE SYSTEM AND THE SAME ARE TO BE INSTALLED AS AND WHEN REQUIRED DURING THE AMC VISITS WITHOUT ANY EXTRA COST. | - | Each |
| 9 | 3rd Year AMC OF NIFPS | 3rd Year AMC OF NIFPS — NIFPS POST WARRANTY AMC: PWAMC OF NITROGEN INJECTION FIRE PROTECTION SYSTEM: THE ANNUAL MAINTENANCE CONTRACT OF THREE YEARS AFTER THE COMPLETION OF THE WARRANTY PERIOD OF TWO YEARS. THE VENDOR HAS TO QUOTE THE RATE FOR VISITS WHICH WILL COVER ALL THE VVSPL LOCATIONS COVERED UNDER THE PROJECT. VENDOR SHALL VISITS TO THE SITE AND INSPECT ALL INSTALLED ITEMS IN NIFPS FOR THEIR FUNCTIONALITY. AFTER EACH VISIT ALL CRITICAL EQUIPMENT’S IN THE SYSTEM ARE TO BE CERTIFIED FOR THEIR HEALTHINESS, WITH PROPER INSPECTION REPORTS. CONTRACTOR SHALL ENLIST THE REPLACEABLE/CONSUMABLES IN THE SYSTEM AND THE SAME ARE TO BE INSTALLED AS AND WHEN REQUIRED DURING THE AMC VISITS WITHOUT ANY EXTRA COST. | - | Each |
| 10 | Additional Mandays-Regular | Additional Mandays-Regular — EXTRA-CHARGES TOWARDS PROVISION OF SERVICES OF ONE QUALIFIED, EXPERIENCE AND COMPETENT ENGINEER INCLUDING ALL EXPENSES TOWARDS HIS ACCOMMODATION, LODGING, BOARDING, LOCAL CONVEYANCE, ALL INCIDENTAL EXPENSES ETC. DURING THE EXTENDED PERIOD OF STAY AFTER 2-DAYS (IF REQUIRED) DURING PLANNED PERIODICAL MAINTENANCE AS PER THE AS PER THE SCOPE OF JOB AND SPECIAL TERMS AND CONDITIONS. | - | Man Day |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
21000114-HD-10120.pdf
TENDER_DOCUMENT • 47.39 MB
Download all tender documents and submit your bid