Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-AOC PLOT NO 39 HIGH STREET VGN TRINITY GARDEN TAMBARAM WEST CHENNAI 600 045 | CHENNAI | CHENNAI | TAMIL NADU | 600045 | ₹5.4 L Quoted ₹5.6 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | Phoenix Engineering L1 |
|---|---|---|---|---|
| 1.00 | Labour charges for Clearing of light jungle including cost of all labour, transport, T&P, lead lift etc., complete as directed by the department engineer at site. | 15,950 | M2 | 7 ₹1.1 L |
| 2.00 | Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site. | 2.23 | M3 | 100 ₹223.20 |
| 3.00 | Supplying and filling with M- Sand for foundation layer not more than 15cm thick including cost of labour, transport, consolidation, lead and lift etc., complete as per standerd specification and as directed by the department at site. | 0.72 | M3 | 2,000 ₹1,440 |
| 4.00 | Plain Cement Concrete 1:3:6 using 20 mm HBG stone including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site. | 0.72 | M3 | 7,000 ₹5,040 |
| 5.00 | Providing and laying P:C:C 1:2:4 using 12-20mm HBG metal without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | 1.8 | M3 | 7,000 ₹12,600 |
| 6.00 | Providing and laying P:C:C 1:2:4 using 12-20mm HBG metal including form work for plinths including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | 11.19 | M3 | 8,500 ₹95,089.50 |
| 7.00 | Supplying, fabrication in GI angle/flats including cost of M.S angle, MS flats as per drawing and specification and galvanising, placing in position including cost of all materials, galvanizing charges transportation, labour lead, lift etc complete as directed by the department engineer at site. | 1,680.84 | Kgs. | 128 ₹2.2 L |
| 8.00 | Plastering in CM 1:3 12 mm thick including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site . | 51.36 | M2 | 350 ₹17,976 |
| 9.00 | Colour washing two coats using shell lime over one coat of white washing including cost of all materials, colur pigments labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site. | 51.36 | M² | 350 ₹17,976 |
| 10.00GST for bidders within TamilNadu | ||||
Tender Value
₹5.5 L
EMD Value
₹5,500
Closing Date
24 Nov 2025, 2:00 pmClosed
SE/GCC-I/CNI
230KV GIS SS Complex, A-10, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai-32
as per NIT
2025_EB_622758_1
LT-024/25-26 of SE/GCC-I/CNI
Limited
Civil Works
60 days
Vembakkam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,500
Yes
22 Jan 2026
12 Nov 2025
25 Nov 2025
12 Nov 2025
24 Nov 2025
12 Nov 2025
Amount
Labour charges for Clearing of light jungle including cost of all labour, transport, T&P, lead lift etc., complete as directed by the department engineer at site.
Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site.
Supplying and filling with M- Sand for foundation layer not more than 15cm thick including cost of labour, transport, consolidation, lead and lift etc., complete as per standerd specification and as directed by the department at site.
Plain Cement Concrete 1:3:6 using 20 mm HBG stone including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site.
Providing and laying P:C:C 1:2:4 using 12-20mm HBG metal without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Providing and laying P:C:C 1:2:4 using 12-20mm HBG metal including form work for plinths including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Supplying, fabrication in GI angle/flats including cost of M.S angle, MS flats as per drawing and specification and galvanising, placing in position including cost of all materials, galvanizing charges transportation, labour lead, lift etc complete as directed by the department engineer at site.
Plastering in CM 1:3 12 mm thick including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site .
Colour washing two coats using shell lime over one coat of white washing including cost of all materials, colur pigments labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
LT024.pdf
Tender Documents • 0.89 MB
BOQ_744690.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid