Tender Value
₹28.9 Cr
EMD Value
₹28.9 L
Closing Date
2 Jun 2026, 3:30 pmClosed
EngineerInChief RnB SR CRN MDTGRDC Hyderabad
O/o The Superintending Engineer RnB Circle Jagtial
Improvements by Widening and Strengthening of road from PWD road to HLB approach road near Arenda Village from Km 0/0 to 6/0, including construction of Bypass road for Venkatapur in Manthani Mandal, Peddapalli District
704151
The Engineer In Chief RB State Roads MD TGRDC Errummanzil Hyderabad e NIT No 04/PP1/CTN/DCE(R)/EE(R)/DEE2/AEE9/2026 27 Dt. 20.05.2026
OPEN
Road and Drainage Work
PEDDAPALLI
19 documents required · 19 mandatory
₹11,800
₹28.9 L
26 May 2026
26 May 2026
26 May 2026
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness by Mechanical means as per the Techinical Specification Clause 201 MoRTH 5th Revision
Earthwork excavation in soils upto SDR by mechanical means including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete including for finished item of work for trench cutting as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge. Note: The work shall be carried out as per approved Plan & Profile and Payment will be based on levels for finished item of works
Excavation for roadway in hard rock with controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres etc complete as per the directions and requirements of Engineer-In-Charge.
Earthwork excavation in Hard Rock (Blasting Prohibited) by mechanical means including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete including for finished item of work for trench cutting as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge
Forming embankment with excavated earth obtained from roadway excavation for Embankment by mechanical means upto SDR including pre-watering of soil, removal of top soil, excavation of soils, depositing the soils on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and complete for finished item of work as per MoRT&H specification 305 (5th revision).
Construction of Embankment with material obtained from borrowed useful earth from outside road boundary MDD of 18 KN/Cum , CBR ≥ 12%, PI < 12%, by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P, complete for finished item of work as per MoRT&H specification 305 (5th revision). Note: The work of embankment shall be carried out as per approved Plan & Profile and Payment will be based on levels for finished item of works
Construction of Subgrade with material obtained from borrowed useful earth from outside road boundary MDD of 18 KN/Cum , CBR ≥ 12%, PI < 12%, by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P, complete for finished item of work as per MoRT&H specification 305 (5th revision). Note: The work of subgrade shall be carried out as per approved Plan & Profile and Payment will be based on levels for finished item of works
Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge.
Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th revision) for finished item of work.
Providing and aplying Prime coat with bitumen emulsion (Slow setting SS1) bulk using emulsion pressure distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of work as per MoRT&H specification 502 (5th Revision) and as directed by the Engineer - in charge.
Providing and applying tack coat with bitumen emulsion (Rapid settting-I) (Bulk) using Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge..
Providing and laying 50mm thick of Dense Graded Bituminous Macadam with 100-120 TPH Batch mix plant using HBG crushed aggregates of Grading - II as per table 500-10 of MoRT&H Specification 505 (5th revision) premixed with bitumen VG-30 grade @ 4.50% of weight of total mixture, transported to site, laid over a previously prepared surface with Hydrostatic Sensor Paver to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve the desired compaction for finished item of work as directed by the Engineer-in-Charge including hire and operational charges all T&P and all other contingent charges necessary including charges of all materials etc., complete and as per MoRTH specification No. 505(5th Revision)
Providing 30 mm thick compacted Bituminous Concrete with 100-120 TPH Batch mix plant using HBG crushed aggregates of Grading – 2 as per table 500-17 of specification 507 of MoRT&H (5th revision), premixed with bitumen VG-30 grade @ 5.4% of mix and Hydrated lime, transporting the hot mix to work site, laying with full width paver to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge
Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum , CBR ≥ 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per MoRT&H specification 305 (5th revision)
Slope Protection works
Providing dry rough stone revetment 300 mm thick with HBG stone of not less than 300 mm size including cost, (excluding seigniorage) charges and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for Pitching of slopes
Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBG metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveyance of all metal (excluding seigniorage) charges ,and all labour charges as directed by the departmental officers as per drawing and Technical specifications as per clause 710.1.1 of IRC:78 and Clause 2200 of MoRT&H (5th Revision) for finished item of work.
Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 440 mm high as shown in drawing in M 20 grade PCC, kerb stone laid with kerb laying machine, all complete as per clause 408
Providing and erecting a "W" metal beam crash barrier comprising of 3mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150X75X5mm spaced 2m centre-to-centre, 1.80m high, 1.1m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS: 1367 and IS: 1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150X75X5mm, 330mm long complete as per Clause 810.
Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seignioarge charges for finished item of work as per MoRT&H specification 304(5th Revision) and as directed by the Engineer-in-Charge.
Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, seigniorage conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for levelling course
Vibrated cement concrete M20 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges , centering, machine mixing, laying in position, Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for Sub structure .(Body walls)
Providing, laying Reinforced cement concrete Hume pipes of 1200 mm Dia., NP-3 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 1200mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th Revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work.
Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge.
Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seignioarge charges for finished item of work as per MoRT&H specification 304(5th Revision) and as directed by the Engineer-in-Charge.
Earthwork excavation in Hard Rock (Blasting Prohibited) by mechanical means including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete including for finished item of work for trench cutting as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge
Excavation for roadway in hard rock with controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres etc complete as per the directions and requirements of Engineer-In-Charge.
Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, seigniorage conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for levelling course
Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for foundation raft
Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for sub structure.
Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for superstructure
Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,JSW and Shyam as approved by Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for RCC items foundation
Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,JSW and Shyam as approved by Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for substructure
Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,JSW and Shyam as approved by Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for super structure RCC items.
Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBG metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveyance of all metal (excluding seigniorage) charges ,and all labour charges as directed by the departmental officers as per drawing and Technical specifications as per clause 710.1.1 of IRC:78 and Clause 2200 of MoRT&H (5th Revision) for finished item of work.
Back filling behind abutments with gravel including cost ,conveyance and of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications for finished item of work
Providing Weep holes in VCC Abutment/ Wing wall/return wall with 100mm Diameter AC pipe extending through the full width of the structure at 1.00m C/C in both horizontal and vertical direction so that the weep holes in each horizontal direction is staggered from the weep holes laying above and below lines as shown in drawing including cost and conveyance of the A.C pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream side face etc., complete for finished item of work for weep holes as per SSR Data
Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified
Providing and laying Boulder's apron on River Bed for protection against scour with stone boulders weighing not less than 40 k.g each complete as per drawing and technical specification 300 mm thick with HBG stone of not less than 300 mm size including cost, (excluding seigniorage) charges and conveyance of materials to site and including labour charges for packing the stones for apron etc., complete for finished item of work as per MoRT&H specification 2503 ( 5th revision ) and as directed by the Engineer-in-Charge for Bed Protection.
Providing dry rough stone revetment 300 mm thick with HBG stone of not less than 300 mm size including cost, (excluding seigniorage) charges and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for Pitching of slopes
Providing and laying of Hot Applied Thermoplastic compound 2.5 mm thick including reflecting glass beads on bituminous surface at 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass bead as per IRC:35, the finished surface to be level, uniform and free from streaks and holes etc. complete for finished item of work (with all leads and Lifts).(Data communicate vide E-in-C(R&B) SR&CRN, Circular Memo No. RSI/DCE(R)/Con.Er(RS/DEE(RS)/AEE(RS)/2022, Dt:23.11.2022
Providing and laying of Hot Applied Thermoplastic compound 2.5 mm thick including reflecting glass beads on bituminous surface at 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass bead as per IRC:35, the finished surface to be level, uniform and free from streaks and holes etc. complete for finished item of work (with all leads and Lifts).(Data communicate vide E-in-C(R&B) SR&CRN, Circular Memo No. RSI/DCE(R)/Con.Er(RS/DEE(RS)/AEE(RS)/2022, Dt:23.11.2022For Rumble Strips -10 mm thick (in 4 Layers each of 2.5mm thick)
Supplying & Fixing of Molded Shanks Raised Pavement Markers made of plastic body moulded from HIPS(HI- impact polysterene ) or ABS or ASA (Acrylic strene Acrylonitrite) and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No.RW/NH/33023/10-97-DOIII Dt.11-06-1997.The height, width and length shall not exceed 50mm,100mm and 100mm and with minimum refelective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree.The Strength of detachment of the integrated cylindrical shanks (of diameter not less than 19 +/- 2 mm and height not less than 30 +/- 2 mm ) from the body is to be a minimum value of 700 Kgs.Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturers recommendation and complete as per the instructions by the Engineer-in-Charge.
Providing and fixing Cautionary / Warning sign boards size 900 mm equilateral triangle made out of Type – XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67:2012 for full background of White colour and letters/logos done by screen printing in Black colour, boarders by screen printing in Red colour and fixed over 4MM Aluminium Composite Material sheet having minimum 0.5 mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading chages necessary for satisfactory completion of the work as directed by Engineer -in-Charge.
Providing and fixing Madatory/Regulatory Sign board size 600mm dia Circular made out of Type – XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67:2012 for full background of Green Colour & White Letters and fixed over 3MM Alluminium Composite Material sheet having minimum 0.30mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paintBlackandWhite colourwith bandsof 30cmof height. The signpostshall befirmly fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading charges necessary for satisfactory completion of the work as directed by Engineer –in-Charge.
Providing & fixing Hazard Marker of 300X900mm Reflectorized panel (Type XI) of Supplying and installation of Hazard Markers/Delinators using M.S. angle of size 55x55x6mm and 120cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand,colour, with 30cm x 90cm Type – XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting of Yellow colour and confirming to IRC 67:2012 fixed over 3MM Alluminium Composite Material having minimum 0.30 mm thick Aluminium skin on both sides with standard supports consisting of alternately black and Yellow with black stripes in screen printing sloping downward at an angle of 45 degrees towards the side of the obstruction on which the traffic is to pass and buried into the ground in a trench of size 30cm x 30cm and 50cm depth filled with CC M-20 including cost and conveyance of all materials, equipment, machinery and labour with all leads and lifts, loading and un-loading charges necessary for successfullcompletion of the work on any road in division as directed by Engineer-in-Charge and conforming to IRC 67-2012 &MORT&H specification No.805 and approved drawings etc., complete for finished item of work.
Providing and fixing village name boards size 600x800 mm made out of Type – XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67:2012 for full background of Green Colour & White Letters and fixed over 3MM Alluminium Composite Material sheet having minimum 0.30mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paintBlackandWhite colourwith bandsof 30cmof height. The signpostshall befirmly fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading charges necessary for satisfactory completion of the work as directed by Engineer –in-Charge.
Providing and fixing junction boards of size 1500 x1200mm made of of Type – XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67:2012 for full background of White colour and letters/logos done by screen printing in Black colour, boarders by screen printing in Red colour and fixed over 3MM Alluminium Composite Material sheet having minimum 0.30mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading charges necessary for satisfactory completion of the work as directed by Engineer -in-Charge.
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc(Kilometer stone)
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc(Hectometer stone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ-Arenda dhamerakunta.xls
TENDER_DOCUMENT • 0.07 MB
Bid Doc Arenda Dhamerakunta-50 crores1.DOC
TENDER_DOCUMENT • 0.69 MB
Download all tender documents and submit your bid