Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Rejected-Technical | Rejected-Technical Not Qualified |
| 3 | Rejected-Technical | Rejected-Technical Not Qualified |
Tender Value
₹21.8 L
EMD Value
₹22,000
Closing Date
22 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
DRDA, Tenkasi
Construction 3 Nos Threshing floor at Kuruvikulam Panchayat Union in Tenkasi District AGAMT II 2021-22 Package No.21
2022_RDTN_240787_31
A4/1192/2022 dt 05.07.2022 AGAMTII-Tsi
Open Tender
Civil Works - Others
Works
180 days
DRDA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹22,000
DRDA, Tenkasi
1 Aug 2022
13 Jul 2022
22 Jul 2022
13 Jul 2022
22 Jul 2022
13 Jul 2022
14 Jul 2022
90 days
Amount
1.CONSTRUCTION OF THRASHING FLOOR AT AVANIKONENDAL VILLAGE OF PALANKOTTAI PANCHAYAT
Earthwork excavation in all classes of Soils and Subsoils except hard rock requiring blasting for laying of Pipes with the standard trench width as per Standard specifications - TWAD board specifications from Source to Storage tank
Supplying and filling with filling sand in layers not more than 15 cm thick including labour charges for Filling, Levelling, watering, well rammed and compacted etc., complete For Flooring Filling material
Supply and filling Well Gravel from approved quarry for Base layer in layers not more than 15mm thick, including cost of material, labour charges for filling, levelling, sectioning and compacting etc., complete as directed by officers.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete _ Base Concrete
Supplying and erection Steel Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab, Lintel, Beam, Column, Sunshade including cost and coveyance of all materials to site and all other incidental charges etc complete.,
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete _ Concrete masonry - Abutment & Body walls.
Brick work with cement mortar 1:5 mix using Country bricks for Foundation, Basement and Superstructure inculding cost and conveyance of all materials to site, labour charges for curing and other incidental charges etc ,complete
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete _ Flooring Top Pavement layer.
Plastering with Cement Morter 1:5 mix, 12mm thick Smooth finish for Brick, RR masonry surface and other Concrete surfaces inculding cost and conveyance of all materials to site and all other labour charges, incidental charges etc., complete
Supllying and fixing Bituman Tarsheet 15mm thick for expansion joints at every 4.50m intervals inculding cost of material conveyance to site,cutting finishing etc., complete.
2.CONSTRUCTION OF THRASHING FLOOR NEAR COMMON BURIAL GROUND AT KURUNJAKULAM VILLAGE AND PANCHAYAT
Earthwork excavation in all classes of Soils and Subsoils except hard rock requiring blasting for laying of Pipes with the standard trench width as per Standard specifications - TWAD board specifications from Source to Storage tank
Supplying and filling with filling sand in layers not more than 15 cm thick including labour charges for Filling, Levelling, watering, well rammed and compacted etc., complete For Flooring Filling material
Supply and filling Well Gravel from approved quarry for Base layer in layers not more than 15mm thick, including cost of material, labour charges for filling, levelling, sectioning and compacting etc., complete as directed by officers.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete _ Base Concrete
Supplying and erection Steel Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab, Lintel, Beam, Column, Sunshade including cost and coveyance of all materials to site and all other incidental charges etc complete.,
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete _ Concrete masonry - Abutment & Body walls.
Brick work with cement mortar 1:5 mix using Country bricks for Foundation, Basement and Superstructure inculding cost and conveyance of all materials to site, labour charges for curing and other incidental charges etc ,complete
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete _ Flooring Top Pavement layer.
Plastering with Cement Morter 1:5 mix, 12mm thick Smooth finish for Brick, RR masonry surface and other Concrete surfaces inculding cost and conveyance of all materials to site and all other labour charges, incidental charges etc., complete
Supllying and fixing Bituman Tarsheet 15mm thick for expansion joints at every 4.50m intervals inculding cost of material conveyance to site,cutting finishing etc., complete.
3.CONSTRUCTION OF THRASHING FLOOR AT RAMARAJAPURAM VILLAGE OF KALINGAPATTI VILLAGE PANCHAYAT
Earthwork excavation in all classes of Soils and Subsoils except hard rock requiring blasting for laying of Pipes with the standard trench width as per Standard specifications - TWAD board specifications from Source to Storage tank
Supplying and filling with filling sand in layers not more than 15 cm thick including labour charges for Filling, Levelling, watering, well rammed and compacted etc., complete For Flooring Filling material
Supply and filling Well Gravel from approved quarry for Base layer in layers not more than 15mm thick, including cost of material, labour charges for filling, levelling, sectioning and compacting etc., complete as directed by officers.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete _ Base Concrete
Supplying and erection Steel Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab, Lintel, Beam, Column, Sunshade including cost and coveyance of all materials to site and all other incidental charges etc complete.,
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete _ Concrete masonry - Abutment & Body walls.
Brick work with cement mortar 1:5 mix using Country bricks for Foundation, Basement and Superstructure inculding cost and conveyance of all materials to site, labour charges for curing and other incidental charges etc ,complete
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete _ Flooring Top Pavement layer.
Plastering with Cement Morter 1:5 mix, 12mm thick Smooth finish for Brick, RR masonry surface and other Concrete surfaces inculding cost and conveyance of all materials to site and all other labour charges, incidental charges etc., complete
Supllying and fixing Bituman Tarsheet 15mm thick for expansion joints at every 4.50m intervals inculding cost of material conveyance to site,cutting finishing etc., complete.
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .