| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.4 CrAccepted-AOC | ₹34.4 Cr | L1 | Accepted-AOC Financial bid is Accepted at the rate of Rs 344397383.04 |
| 2 | L2₹41.1 CrRejected-Finance | ₹41.1 Cr | L2 | Rejected-Finance Rejected |
| 3 | L3₹42.0 CrRejected-Finance | ₹42.0 Cr | L3 | Rejected-Finance Rejected |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| 5 | Rejected-Technical | - | - | Rejected-Technical Rejected |
Tender Value
Refer Docs
Closing Date
17 Aug 2021, 12:00 pmClosed
SE BLY CIRCLE PWD BLY
OFFICE OF SE BLY CIRCLE PWD BLY
Widening and strengthening of Remaining Part of Bisalpur Banda Khutar Gola Road in Distt. Shahjahanpur
2021_CEBLY_609550_1
6569/141C(E Tender-13)-3/21-22 Dt. 03-08-2021
Open Tender
Civil Works - Roads
365 days
SHAHJAHANPUR
Please refer SBD documents.
3 documents required · 3 mandatory
₹2,725
Exempted
SE BLY CIRCLE PWD BLY
29 Sept 2021
9 Aug 2021
17 Aug 2021
9 Aug 2021
17 Aug 2021
9 Aug 2021
11 Aug 2021
Amount
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts all complete.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement.(FOR COMPACTION ONLY)
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.(Carted Earth ) (Data Book Sr. no. - 3.16)
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (3.50% Emulsion + 1% Cement)
Providing and applying tack coat with VG_10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom .
Providing and laying bituminious concrete with 100-120 batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.40% as per job mix, and filler, transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 509 complete in all respects.
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres
Earth work in excavation for foundation of structure as per drawing and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.
M-15 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days as per MORT&H Specification Clause 2100
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per as per MORT&H Specification Clause 1300, 2200. (MAJOR BRIDGE IN KM 39 and 40)
M-20 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and as per MORT&H Specification Clause 1500, 1700 & 2100.
Stone Ballast 40 mm gauge filling behind abutment, wing wall & return wall complete as per drawing & as per MORT&H Specification Clause 2200
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications (Labour Rate)
Providing and laying Pitching with stone boulder 25-60 kg on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and as per MORT&H Specification Clause 2504.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M25
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
Supply and filling fine sand as a filter material in abutments including all materials labour T&P cartge staking etc. complete.
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in Single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry FOR 1000 mm dia HP
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in Single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry FOR 600 mm dia HP
Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.
Construction of shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.(Carted Earth)
Brick soling but with bricks laid on edge and dry including preparation of subgrade to prescribed camber and including supply of bricks, filling joints with local earth, spreading blinding coat of 1 cm (3/8") depth of local earth of P.I. 5 to 7 or sand over the entire surface and including labour and T&P etc. required for proper completions of the work. SOR 762(b)
Kasana Builders Pvt Ltd
SIDDHARTH CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf