| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC | ₹2.2 Cr | L1 | Accepted-AOC Lowest Rate Quoted. |
| 2 | L2₹2.3 Cr+₹6.7 L (2.99%)Rejected-Finance | ₹2.3 Cr+₹6.7 L (2.99%) | L2 | Rejected-Finance Higher Rate Quoted. |
| 3 | L3₹2.3 Cr+₹7.2 L (3.25%)Rejected-Finance | ₹2.3 Cr+₹7.2 L (3.25%) | L3 | Rejected-Finance Higher Rate Quoted. |
| 4 | L4₹2.3 Cr+₹11.1 L (5.00%)Rejected-Finance VIVEKANANDAPALLY MIRCHAK P S ENGLISH BAZAR DIST MALDA 732101 | ENGLISH BAZAR | MALDA | WEST BENGAL | 732101 | ₹2.3 Cr+₹11.1 L (5.00%) | L4 | Rejected-Finance Higher Rate Quoted. |
Tender Value
₹2.2 Cr
EMD Value
₹4.5 L
Closing Date
23 Mar 2026, 11:00 amClosed
SE attached to CE(N)
Office of the Chief engineer (North) Green Park, Malda.
Anti-erosion work to the right bank of river Mahananda including improvement of bank slope for protection of river bank from EjabulHoque house to HamidurRahaman house for a length of 400 m at Raninagar, Block-Ratua-II, Malda (2nd Call).
2026_IWD_1014724_2
WBIW/SE/CE(N)/NIT-9(e)/2025-26
Open Tender
CIVIL WORKS
Percentage
150 days
Raninagar, Block-Ratua-II, Malda
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹4.5 L
Yes
11 Sept 2026
28 Feb 2026
24 Mar 2026
28 Feb 2026
23 Mar 2026
28 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. | 5,600 | SQM | 5.96 | ₹33,376 |
| 2 | Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge.
(a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. | 7,148 | CUM | 117.99 | ₹8,43,392.52 |
| 3 | Supplying at site and laying in position UV stabilized polypropylene woven geotextile of 430 gsm as filter, as per specification, including cost of preparing the bed, placing the geotextile as per profile with at least 15cm lapping, wherever required and anchorage at top, sewing /welding the overlapped portion, storage and transportation by all means, complete as per direction of the Engineer-in-charge.
Note: 1. Payment to be made on measurement of finished surface without lapping, but including anchoring length at top.
2. Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.7.7, 2.7.9 and 2.7.10 under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “Specification & Special Terms & Conditions for Geotextile” in case of use of this item in the estimate.
3. This particular item is to be used in special cases, either in continuation of previous usage or after offering adequate justification from techno-economical angles. | 8,850 | SQM | 280.07 | ₹24,78,619.5 |
| 4 | Making sausage cage with 10 SWG galvanized iron wire of 125mm. x 125mm. mesh wire netting with proper lapping of minimum 150 mm. including sewing the joints with 12 SWG G I wire and supply of all materials and equipments including placing the sausage cage in position, filling the same with boulder or lump aggregates complete as per direction of the Engineer-in-charge but excluding the cost of boulder / lump aggregates and its carriage
upto site. Size:- 1.30 m x 1.00 m x 0.60 m | 3,400 | EACH | 899.81 | ₹30,59,354 |
| 5 | Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete. | 10,562 | EACH | 139.44 | ₹14,72,765.28 |
| 6 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.
NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3. Size of Nylon crate is 1metre X 1metre X 1metre.
(a) Where boats are not necessary. | 8,450 | EACH | 460.03 | ₹38,87,253.5 |
| 7 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.
NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3. Size of Nylon crate is 1metre X 1metre X 1metre.
(a) Where boats are necessary. | 2,112 | EACH | 473.14 | ₹9,99,271.68 |
| 8 | Making rectangular sausage cage with 10 SWG galvanized iron wire of 125mm. x 125mm. mesh wire netting with proper lapping of minimum 150 mm. including sewing the joints with 12 SWG G I wire and supply of all materials and equipments including placing the sausage cage in position, filling the same with boulder or lump agreegates complete as per direction of the Engineer-in-charge but excluding the cost of boulder / lump aggregates and its
carriage upto site.(Cost is excluding the cost of end pieces ) d) 0.90 metre x 0.60 metre nominal section | 200 | METRE | 524.39 | ₹1,04,878 |
| 9 | Labour charges for bouIder pitching on top and slope by placing required boulders (each weighing 20 Kg. and above within lead of 100 metres and all lifts) including filling the interstices with fragments as required, preparing sub-grade by cutting or filling the earth on slope upto 7.5 cm. depth, watering and ramming where necessary complete as per direction of the Engineer-incharge.
a) Over Jhama Khoa / metal filter/ Geo-textile filter. | 848 | CUM | 542.27 | ₹4,59,844.96 |
| 10 | Extra rate for stacking unloaded boulder on private land (where Govt. land is not available) to make them convenient for measurement as per direction of the Engineer-in-charge (land to be arranged by the contractor at his own cost).
Note :- This item is payable only when the Engineer-in-charge in his discretion is salisfied about the necessity. | 3,214 | CUM | 9.53 | ₹30,629.42 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.33 MB
02BarChartRaninagar.pdf
Tender Documents • 0.44 MB
2911n.pdf
Tender Documents • 1.17 MB
02RaninagarDrawings.pdf
Tender Documents • 2.20 MB
BOQ_2493039.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .