| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55.5 LAccepted-AOC | L1 | Accepted-AOC Below | |
| 2 | L2₹60.0 L+₹4.4 L (7.94%)Rejected-Finance | L2 | Rejected-Finance Above |
| Sl No | Description | Qty | Unit | M CHINNA THAMBI L2 | M MAHESHWARAN L1 |
|---|---|---|---|---|---|
| 1.00 | Collection supply and filling of M-Sand of approved quarry including cost and coveyance of all materials to site and all labour charges for filling etc.,complete. | 334 | Cum | 8,35,000 ₹8,35,000 | 7,12,422 ₹7,12,422 Lowest |
| 2.00 | Cement concrete of mix 1:4:8 using 40mm guage hard broken including cost conveyance of all materials to site and labour charges, transporting and placing in position including shoring, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification | 334 | Cum | 21,71,000 ₹21,71,000 | 20,16,692 ₹20,16,692 Lowest |
| 3.00 | Supplying and erecting centering for sides and soffits including supports and strutting uptp 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90cmx60cm and 10 gauge stiffened, welded with mild steel angles of size 25mmx25x3mm for boarding laid over silver oak (country wood) joist of size 10cmx6.5cm dia spaced about 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre tocentre etc.complete complying with standard specification and as directed by the departmental engineers. TNBP No.30 | 334 | Sqmt | 1,16,900 ₹1,16,900 | 1,10,220 ₹1,10,220 Lowest |
| 4.00 | Supply and fixing of 12mm thick Bitumen Pad including cost conveyance of all materials to site and labour charges, transporting and placing in position including shoring, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification | 67 | Sqmt | 33,500 ₹33,500 | 32,495 ₹32,495 Lowest |
| 5.00 | Cement concrete of mix 1;11/2:3using 20mm metal guage hard broken including cost conveyance of all materials to site and labour charges, transporting and placing in position including shoring, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification | 334 | Cum | 28,39,000 ₹28,39,000 | 26,82,688 ₹26,82,688 Lowest |
Tender Value
₹67 L
EMD Value
₹67,000
Closing Date
10 Feb 2026, 6:55 pmClosed
Executive Officer(i/c) Town Panchayat Achanpudur
Executive Officer(i/c) Town Panchayat Achanpudur
2025-2026 KNMT Scheme Formation of Earthern to Cement Concrete Pavement at Parvathipuram North cross street in Achanpudur Town panchayat.
2026_DTP_651360_1
17-2025
Open Tender
Civil Works
Works
Achanpudur
2nd class
2 documents required · 2 mandatory
₹0
₹67,000
Yes
Achanpudur
24 Feb 2026
4 Feb 2026
11 Feb 2026
4 Feb 2026
10 Feb 2026
4 Feb 2026
4 Feb 2026
Collection supply and filling of M-Sand of approved quarry including cost and coveyance of all materials to site and all labour charges for filling etc.,complete.
Cement concrete of mix 1:4:8 using 40mm guage hard broken including cost conveyance of all materials to site and labour charges, transporting and placing in position including shoring, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification
Supplying and erecting centering for sides and soffits including supports and strutting uptp 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90cmx60cm and 10 gauge stiffened, welded with mild steel angles of size 25mmx25x3mm for boarding laid over silver oak (country wood) joist of size 10cmx6.5cm dia spaced about 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre tocentre etc.complete complying with standard specification and as directed by the departmental engineers. TNBP No.30
Supply and fixing of 12mm thick Bitumen Pad including cost conveyance of all materials to site and labour charges, transporting and placing in position including shoring, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification
Cement concrete of mix 1;11/2:3using 20mm metal guage hard broken including cost conveyance of all materials to site and labour charges, transporting and placing in position including shoring, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_781063.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .