Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAdmitted-Finance BARKHOPA HOUSE NO 0 CITY TOWN TAMULPUR P O BARKHOPA P S TAMULPUR DISTRICT BAKSA PIN 701367 | 701367 | ₹2.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.6 CrAdmitted-Finance | ₹2.6 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical EMD Not submitted |
| Sl No | Description | Qty | Unit | DAYAL DAS L1 | Jimi Bhuson Boro L2 |
|---|---|---|---|---|---|
| 1.00 | Construction of Intake well | 1 | Job | 11,93,198.1 ₹11.9 L | 12,55,998 ₹12.6 L |
| 2.00 | 100 mm dia Raw water pumping main | 1 | Job | 16,13,216.85 ₹16.1 L | 16,98,123 ₹17.0 L |
| 3.00 | 5 HP Centrifugal type Raw water pump sets: | 1 | Job | 1,57,572.7 ₹1.6 L | 1,65,866 ₹1.7 L |
| 4.00 | Cost of Treatment Plant: .461 MLD | 1 | Job | 21,85,731.5 ₹21.9 L | 23,00,770 ₹23.0 L |
| 5.00 | Filter Under Drainage System, Internal Connection, Filter | 1 | Job | 2,23,344.05 ₹2.2 L | 2,35,099 ₹2.4 L |
| 6.00 | Cost of 60 Cum capacity Underground clear water sump | 1 | Job | 5,96,795.7 ₹6.0 L | 6,28,206 ₹6.3 L |
| 7.00 | Chemical Dosing (Electro Chlorinator with Test Kit): | 1 | Job | 48,538.35 ₹48,538.35 | 51,093 ₹51,093 |
| 8.00 | Clear water pump house | 1 | Job | 1,44,189.1 ₹1.4 L | 1,51,778 ₹1.5 L |
| 9.00 | 7.5 HP capacity Clear Water Pump Set: | 1 | Job | 1,59,046.15 ₹1.6 L | 1,67,417 ₹1.7 L |
| 10.00 | 100 mm dia Clear Water Pumping main: | 1 | Job | 75,432.02 ₹75,432.02 | 79,402.13 ₹79,402.13 |
Tender Value
₹2.5 Cr
EMD Value
₹5.0 L
Closing Date
25 Nov 2020, 3:00 pmClosed
Director, PHED, BTC, Kokrajhar
O/o the Director, PHED, BTC, Kokrajhar
Greater Subankhata PWSS under the programme of JJM for the year 2020-21 under PHE Baksa Division
2020_BoTC_19287_1
BTC/PHED/7/2021 - 7/2
Open Tender
Construction Works
120 days
BAKSA
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,500
Principal Secretary, BTC
₹5.0 L
Yes
11 Dec 2020
13 Nov 2020
25 Nov 2020
13 Nov 2020
25 Nov 2020
13 Nov 2020
13 Nov 2020 - 25 Nov 2020
Amount
Construction of Intake well
100 mm dia Raw water pumping main
5 HP Centrifugal type Raw water pump sets:
Cost of Treatment Plant: .461 MLD
Filter Under Drainage System, Internal Connection, Filter
Cost of 60 Cum capacity Underground clear water sump
Chemical Dosing (Electro Chlorinator with Test Kit):
Clear water pump house
7.5 HP capacity Clear Water Pump Set:
100 mm dia Clear Water Pumping main:
Const. of 200 Cum capacity RCC O.H.R with 16 m.
Cost of Distribution Network:
Accommodation for operating staff i) For intake point
ii) For Tratment Plant
ASEB Power Connection including power line i) For intake point
ii) For Tratment Plant
Site Development
Compound Fencing
Compound Electrification and lighting
Approach Road with Box Culvert
T&P Materials
Trial Run
Miscellaneous
Diesel Generating Set : A) At Intake location 12.5 KVA
B) At Treatment Plant 12.50 KVA
Cost of House Service Connection 859
Cost of Laboratory equipment
Cost of 2.0 Sq.m. Toilet in Treatment Plant
Provision for safe disposal of waste water (0.5% of the project cost)
Jimi Bhuson Boro
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_29904.xls
BOQ • 0.29 MB
SBD_07_PHE.pdf
Tender Documents • 0.33 MB
Download all tender documents and submit your bid