| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-Finance GOPALPUR BANSI RANIGANJ DISTRICT PRATAPGARH | PRATAPGARH | UTTAR PRADESH | ₹4.3 L | L1 | Accepted-Finance Rate quoted is lowest |
| 2 | L2₹5.6 LAccepted-Finance | ₹5.6 L | L2 | Accepted-Finance Rate quoted is highest |
| 3 | Not Admitted-Fee/PreQual/Technical 123 716 GADARIAN PURWA KANPUR NAGAR UTTAR PRADESH 208023 UDYAM UP 43 0039845 | KANPUR NAGAR | UTTAR PRADESH | 208023 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Updated dates
Tender Value
₹6.7 L
EMD Value
₹7,000
Closing Date
16 Dec 2025, 4:00 pmClosed
Superintending Engineer
SE ETC Sultanpur 400KV S/S Campus Payagipur Sultanpur
REPLACEMENT OF MORE THAN 35 YEARS OLD, OBSOLETE AND OUTLIVED 145 KV CVT, LA AND CB AT 132 KV SUB- STATION KADIPUR UNDER ETD SULTANPUR
2025_UPTCL_1086240_1
T.No. 27/ETCS/2025-26
Open Tender
Electrical Works
60 days
132KV S/s Kadipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE ETC Sultanpur
₹7,000
13 Jan 2026
31 Oct 2025
17 Dec 2025
31 Oct 2025
16 Dec 2025
31 Oct 2025
Amount
Part A (Supply of following items)
Supply of MS Flat of size 75 X 10 mm
Supply of MS Flat of size 50 X 6 mm
Supply of 40mm MS rod for Main Earthmat
Supply of 40mm dia MS electrodes of 3 metre length
Fabrication galvanization and supply of lattice type auxiliary structure (BCT) as per structure drawing along with GI appropriate size nuts, bolts,washers etc.including unloading and stacking at site.(02 sets)
Part B (Work)
Dismantling of following old more than 35 year,145 KV CVT and shifting from switchyard to store designated place or directed by supervision engineer after opening of all cable terminations, jumper & earthing connections etc.
145 KV CVT of Goshaisinghpur Ckt-II bay
(i) R-Phase Make-HBB Sr no.-IB047552, Mfg-1987-88 (ii) B-Phase Make-HBB Sr no.-IB047549, Mfg-1987-88
145 KV CVT of Lambhua bay
(i) R-Phase Make-HBB Sr no.-IB047591, Mfg-1987-88 (ii) B-Phase Make-HBB Sr no.-IB047645, Mfg-1987-88
Erection auxiliary structure (BCT) required for installation of PTs.The job consists of shifting of all material ie.Structure part,nuts,bolts,washers etc.from store to site of erection to structure as per relevant drawing and practices using flat and spring washer with each bolt matching of holes, cutting, matching of members if required shall also be done by the contractor without any extra cast to complete the work satisfactorily completion of work shall be arranged by the contractor at his own cost.
Shifting up following 145 KV PT from store to switchyard up to erection place and erection of the same including jumpering and control cable termination from PT to PT JB, as per technical specification and instruction manual of equipment.Jumper replacement is also done by contractor free of cost if required.
145 KV PT of Goshaisinghpur Ckt-II bay
145 KV PT of Lambhua bay
Erection of junction box 145 KV PT
Phase sequence Painting of all newly erected equipments by red , yellow and blue Synthetic enemeled Paint.
Laying of 4C x 2.5/6C x 2.5 sq mm copper Control Cables in Cable Trenches from Control Panels in Control Room to 132KV PT in Switchyard as per Cable Schedule including Shifting of Cables in Drums from Storage Place at the Sub Station to Erection Site and Shifting Back the Balance Cables to Stores at the Sub Station.
Termination, ferruling & proper dressing of 4 core x 2.5/6C x 2.5 sq mm copper Control Cables in C&R panels, PT Junction boxes etc.
Dismantling of old more than 35 year 120KV LAs from structure with help of hydra/crane, including opening of jumper of 132KV Goshasinghpur ckt.II,Lambhua,40MVA T/F-I & II Bay and its shifting from switchyard to substation store Shifting of new 120KV LAs from substation store to site and its erection in place of old one with help of hydra/crane, its jumpering, earthing. The work includes all men, materials, hydra/crane and T&Ps will be provided by contractor for satisfactorily completion of work.Jumper replacement is also done by contractor free of cost if required.
Delta earthing of 120KV LA as per technical specification to complete the job satisfactory.
Dismantling of 132 KV CB of 132 KV Lambhua bay & 132 KV Transfer bay at 132 KV Substation Kadipur,Sultanpur by opening of jumpers, earthing and cable connections and shifting of CB up to designated place in switchyard (Approx 50 mtr.)
Erection of new 132 KV CB of Lambhua bay & 132 KV Transfer bay at 132 KV Substation Kadipur,Sultanpur including shifting of CB store point ot site of work, making all jumpers, electrical connections and earthing and other associated work to cmplete the job as per technical specification.Jumper replacement is also done by contractor free of cost if required.
Commissioning of new 132 KV CB in 132 KV Lambhua bay & 132 KV Transfer bay at 132 KV Substation Kadipur Sultanpur as per technical specification .Job include proper alignment of CB filling of SF-6 gas after creating vacuum (if required) and other associated work to complete the job in all respect.
Painting MS flat by one coat of red oxide primer of good quality then two coats of 1t quality Synthetic Enamel Paint of Asian/Berger/Nerolac make in Bus green color as per details below:
M/s Janta Charan (BID ID -5750089)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
etender27.pdf
Tender Documents • 1.13 MB
BOQ_1991332.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid