Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.4 LAccepted-AOC SHOP NO 5 WARD NO 12 132041 | KARNAL | KARNAL | HARYANA | 132041 | ₹15.4 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹18.1 L+₹2.7 L (17.6%)Rejected-Finance 29 RAILWAY ROAD WARD NO 9 TARAORI 132116 | TARAORI | KARNAL | HARYANA | 132116 | ₹18.1 L+₹2.7 L (17.6%) | L2 | Rejected-Finance Reject |
| 3 | L3₹19.0 L+₹3.6 L (23.2%)Rejected-Finance S O PREM KUMAR SUNDER NAGAR 132117 | KARNAL | HARYANA | 132117 | ₹19.0 L+₹3.6 L (23.2%) | L3 | Rejected-Finance Reject |
| 4 | L4₹19.8 L+₹4.3 L (28.2%)Rejected-Finance AMUPUR VPO AMUPUR TEHSIL NISSING DISTT KARNAL | KARNAL | KARNAL | HARYANA | 132001 | ₹19.8 L+₹4.3 L (28.2%) | L4 | Rejected-Finance Reject |
Tender Value
₹17.3 L
EMD Value
₹34,000
Closing Date
4 Jul 2026, 5:00 pmClosed
BHANWAR SINGH
Municipal Committee Taraori
Const of Drain (RCC Nala) from Anjanthali road to H/O Sh. Omparkash in ward no.14 MC Taraori. only for society
2026_HRY_531837_1
2026CF0C408E A824 4ACD 894B 8C65229EBBB1310ULB
Open Tender
Civil Works
Works
180 days
Taraori
Const of Drain (RCC Nala) from Anjanthali road to H/O Sh. Omparkash in ward no.14 MC Taraori
2 documents required · 2 mandatory
₹2,000
₹34,000
Yes
1 Aug 2026
26 Jun 2026
6 Jul 2026
26 Jun 2026
4 Jul 2026
26 Jun 2026
26 Jun 2026 - 28 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 30.4 | cum | 1,863 | ₹56,635.2 |
| 2 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 2,200 | Kg. | 83 | ₹1,82,600 |
| 3 | [17.13]Granular Sub-Base (Mix in place) Construction of granular sub-base by providing Material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of MORT&H technical specifications [Through Rate] | 30.4 | cum | 1,094 | ₹33,257.6 |
| 4 | [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate] | 80 | Sqm | 655 | ₹52,400 |
| 5 | [17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate] | 200 | Sqm | 26 | ₹5,200 |
| 6 | [17.71]Relaying of available (removed and stacked) Interlocking Paver Block Pavement having thickness 100mm/80 mm/ 60 mm (average = 80mm) as per drawings and Technical Specification Clause 1504 [Through Rate] | 120 | Sqm | 66 | ₹7,920 |
| 7 | [4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. [Through Rate] | 200 | cum | 138 | ₹27,600 |
| 8 | [5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate] | 66.55 | cum | 460 | ₹30,613 |
| 9 | [5.7.3]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 3. In lime mortar [Through Rate] | 54.72 | cum | 347 | ₹18,987.84 |
| 10 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 73.87 | cum | 4,374 | ₹3,23,107.38 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_610896.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .