| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.4 CrAccepted-AOC LOHARU CHOWK LOHARU BHIWANI ROAD CHARKHI DADRI 127306 | CHARKI DADRI | HARYANA | 127306 | ₹2.4 Cr | 1 | Accepted-AOC 1st Lowest |
| 2 | 2₹2.4 Cr+₹4.1 L (1.72%)Rejected-AOC C 57A SURYA VIHAR GURUGRAM 122 001 HR | GURUGRAM | HARYANA | 122001 | ₹2.4 Cr+₹4.1 L (1.72%) | 2 | Rejected-AOC 2nd Lowest |
| 3 | 3₹2.6 Cr+₹17.5 L (7.28%)Rejected-AOC N A | ₹2.6 Cr+₹17.5 L (7.28%) | 3 | Rejected-AOC 3rd Lowest |
| Sl No | Description | Qty | Unit | P C Gupta and Co L3 | SHAURYA CONSTRUCTION L2 | ROCK STRENGTH CONSTRUCTION CO. L1 |
|---|---|---|---|---|---|---|
| 1.00 | Recovery items:
The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- Bituminous material @ 1700/- per cum
Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price. | 46.2 | cum | 1,700 ₹-78,540 Lowest | 1,700 ₹-78,540 Lowest | 1,700 ₹-78,540 Lowest |
| 2.00 | credit of old material for Bituminous material @ 1560 per cum | 21.94 | cum | 1,560 ₹-34,226.4 Lowest | 1,560 ₹-34,226.4 Lowest | 1,560 ₹-34,226.4 Lowest |
| 3.00 | Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :-
Bituminous material @ 1500/- Per Cum
Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price | 52.8 | cum | 1,500 ₹-79,200 Lowest | 1,500 ₹-79,200 Lowest | 1,500 ₹-79,200 Lowest |
Tender Value
₹2.7 Cr
EMD Value
₹5.3 L
Closing Date
2 Jul 2025, 5:00 pmClosed
PARDEEP SINDHU
PD - II, Gurgaon
Special repair of 09 nos roads in Provincial Sub Division No-IV, PWD BandR Br., Gurugram in Gurugram District. Work programme for the year 2025-2026 in Badshahpur constituency
2025_HRY_453805_1
2025FF8B15B5 D0EC 428B 9904 4E70E48447C0622BAR
Open Tender
Civil Works
Works
180 days
Mohammad Patli SAIDPUR MOHAMMADPUR Babu Pur MU
2 documents required · 2 mandatory
₹15,000
₹5.3 L
Yes
11 Sept 2025
20 Jun 2025
3 Jul 2025
20 Jun 2025
2 Jul 2025
20 Jun 2025
Amount
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- Bituminous material @ 1700/- per cum Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price.
credit of old material for Bituminous material @ 1560 per cum
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- Bituminous material @ 1500/- Per Cum Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price
Bidder Name
Amount
P C Gupta and Co (GSTN-06AAEPG5955G1ZR) BID ID -1288862
SHAURYA CONSTRUCTION (GSTN-06BREPK2185A1Z7) BID ID -1288840
ROCK STRENGTH CONSTRUCTION CO. (GSTN-NA) BID ID -1288908
P C Gupta and Co (BID ID -1288862)
ROCK STRENGTH CONSTRUCTION CO. (BID ID -1288908)
SHAURYA CONSTRUCTION (BID ID -1288840)
P C Gupta and Co (BID ID -1288862)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.26 MB
Tenderdocument.pdf
Tender Documents • 3.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .