| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.2 LAdmitted-Finance | -14.92% | ₹19.2 L | L1 | Admitted-Finance |
| 2 | L2₹19.6 L+₹40,142.82 (2.09%)Admitted-Finance | -13.14% | ₹19.6 L+₹40,142.82 (2.09%) | L2 | Admitted-Finance |
| 3 | L3₹22.8 L+₹3.6 L (18.7%)Admitted-Finance | +1.01% | ₹22.8 L+₹3.6 L (18.7%) | L3 | Admitted-Finance |
Tender Value
₹22.6 L
EMD Value
₹45,100
Closing Date
14 May 2026, 6:00 pmClosed
ADPC OFFICE SAMAGRA SHIKSHA SRIGANGANAGAR
ADPC OFFICE SAMAGRA SHIKSHA SRIGANGANAGAR
Construction of Hall Under DMFT Scheme in PM Shri Govt. Girls Sr. Sec. School, Anoopgarh Block - Anoopgarh
2026_RCSCE_556484_3
NIT 01/2026-27 SRIGANGANAGAR
Open Tender
Civil Works
Percentage
180 days
PM Shri Govt. Girls Sr. Sec. School, Anoopgarh
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
ADPC SAMAGRA SHIKSHA/MD RISL
₹45,100
22 May 2026
8 May 2026
15 May 2026
8 May 2026
14 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART A CIVIL WORK | |||||
| 1.01 | B-1/1.8 Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 157.54 | Cum | 178 | ₹28,042.12 |
| 1.02 | B-3/3.1.6 Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 45.57 | Cum | 3,302 | ₹1,50,472.14 |
| 1.03 | B-5/5.1.2 Brick masonry with F.P.S. bricks of class designation 75 in foundation and plinth with bricks Cement mortar 1 : 6 (1 cement : 6 coarse sand) | 23.12 | Cum | 4,263 | ₹98,560.56 |
| 1.04 | B-4/4.9 Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | 152.48 | Sqm | 157 | ₹23,939.36 |
| 1.05 | B-4/4.1 Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement.
M20 grade Nominal Mix / Design Mix | 34.19 | Cum | 4,934 | ₹1,68,693.46 |
| 1.06 | B-1/1.25+H-1/1.3.1 Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. Supply & Stacking good earth at site complete including loading unloading & transporation etc. Good soil of Earth | 117.73 | Cum | 304 | ₹35,789.92 |
| 1.07 | B-5/5.2.2 Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : Cement mortar 1 : 6 (1 cement : 6 coarse sand) | 22.76 | Cum | 4,990 | ₹1,13,592.76 |
| 1.08 | B-4/4.10.2 Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. | 261.72 | Sqm. | 340 | ₹88,984.8 |
| 1.09 | B-4/4.10.3 Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : Columns, pillars, posts and struts etc. | 69.77 | Sqm | 375 | ₹26,163.75 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.74 MB
Tendernotice_2.pdf
PDF • 4.88 MB
BOQ_990835.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .