Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.5 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹57.2 L+₹78,686.56 (1.39%)Rejected-Finance | L2 | Rejected-Finance Highest rate |
Tender Value
₹56.5 L
EMD Value
₹58,000
Closing Date
15 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director, DRDA, Virudhunagar
DRDA, Collectorate Complex, Virudhunagar
Construction of Threshing floors-9 nos. in AGAMT-II-2021-22 Village panchayats of Narikudi Block in Virudhunagar District in Package no.NKD-5.
2022_RDTN_237316_39
C9/5832/2021 dated 18.06.2022
Open Tender
Civil Works
Works
180 days
Narikudi Block
Two Cover System. Refer tender document.
5 documents required · 5 mandatory
₹0
₹58,000
DRDA, Collectorate Complex, Virudhunagar
16 Sept 2022
27 Jun 2022
15 Jul 2022
27 Jun 2022
15 Jul 2022
6 Jul 2022
6 Jul 2022
90 days
Amount
Part-1:- Construction of New Threshing Floor in Rettaikulam village of Alathoor Panchayat (15 M x 15 M)
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basment including all material charges etc complete
Cement concrete 1:3:6 mix using 20mm ISS metal (using M-Sand) including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Part-2:- Construction of New Threshing Floor in Chittavannangulam village of Agathagulam Panchayat (15 M x 15 M)
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basment including all material charges etc complete
Cement concrete 1:3:6 mix using 20mm ISS metal (using M-Sand) including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Part-3:- Construction of New Threshing Floor in Sathiseri village of Irunjirai Panchayat (15 M x 15 M)
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basment including all material charges etc complete
Cement concrete 1:3:6 mix using 20mm ISS metal (using M-Sand) including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Part-4:- Construction of New Threshing Floor in Orusirangampatti village of Irunjirai Panchayat (15 M x 15 M)
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basment including all material charges etc complete
Cement concrete 1:3:6 mix using 20mm ISS metal (using M-Sand) including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Part-5:- Construction of New Threshing Floor in Kandukondanmanikkam village and Panchayat (15 M x 15 M)
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basment including all material charges etc complete
Cement concrete 1:3:6 mix using 20mm ISS metal (using M-Sand) including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Part-6:- Construction of New Threshing Floor in Kurunthankulam village of Regunathamadai Panchayat (15 M x 15 M)
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basment including all material charges etc complete
Cement concrete 1:3:6 mix using 20mm ISS metal (using M-Sand) including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Part-7:- Construction of New Threshing Floor in Iruvarkulam village of Salai Iluppaikulam Panchayat (15 M x 15 M)
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basment including all material charges etc complete
Cement concrete 1:3:6 mix using 20mm ISS metal (using M-Sand) including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Part-8:- Construction of New Threshing Floor in K.Nedungulam village of Thiruvalarnallur Panchayat (15 M x 15 M)
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basment including all material charges etc complete
Cement concrete 1:3:6 mix using 20mm ISS metal (using M-Sand) including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Part-9:- Construction of New Threshing Floor in Uluthimadai village of Uluthimadai Panchayat (15 M x 15 M)
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basment including all material charges etc complete
Cement concrete 1:3:6 mix using 20mm ISS metal (using M-Sand) including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
GST Amount for providing Service to the above Government Contract Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
P RAMESH
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .