| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAdmitted-Finance | ₹9.9 L | L1 | Admitted-Finance |
| 2 | L2₹10.0 LAdmitted-Finance | ₹10.0 L | L2 | Admitted-Finance |
| 3 | L3₹11.1 LAdmitted-Finance | ₹11.1 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | DEEPAK ENGINEERING L2 | HARE KRISHNA ENERGY PROJECTS L1 | PRACHI ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00Safe loading, carriage unloading of following material from center store Daliganj to J.E.'s store and from J.E.'s stores to work at site. | ||||||
| 1.01 | (a) PCC Pole 8.5 Mtr Long. | 20 | Nos | 485 ₹9,700 | 475 ₹9,500 | 550 ₹11,000 |
| 1.02 | (b) STP Pole 9/11 Mtr. Long. | 5 | Nos | 585 ₹2,925 | 575 ₹2,875 | 650 ₹3,250 |
| 1.03 | ©ABC 3X95/120+1X70+1X16 sqmm | 1,000 | Mtr | 11.85 ₹11,850 | 11.75 ₹11,750 | 12 ₹12,000 |
| 1.04 | (d) ACSR Conductor Weasel/Dog/Raccoon | 500 | Mtr | 7.85 ₹3,925 | 7.75 ₹3,875 | 8 ₹4,000 |
| 2.00 | Attending breakdown by Replacement of damage PCC Pole/STP pole, opening of HT/LT line & accessories by digging pit its proper erection . All T&P shall be provided by the Contractor. | 23 | Nos. | 5,790 ₹1.3 L | 5,785 ₹1.3 L | 3,850 ₹88,550 |
| 3.00 | Attending breakdown by Replacement of damage conductor of 11 KV/LT line Opening and dismantling of all the wire and accessories .All T&P shall be provided by the Contractor. | 12 | Span | 4,190 ₹50,280 | 4,185 ₹50,220 | 3,850 ₹46,200 |
| 4.00 | Attending brekdown by Replacement of damage ABC by newly ABC its Erection & commissioning of (3x95/120+1x70+1x16 sq.mm) Aerial Bunched Conductor. Only ABC shall be supplied by the department. | 12 | Span | 2,540 ₹30,480 | 2,535 ₹30,420 | 2,500 ₹30,000 |
| 5.00 | Repairing of damage/Rusted steel and rotten 11 Meter/9 Meter Long Steel Tubular Pole with the help of 03 Nos. MS Angle of size 40x40x5x1500mm. Work includes opening of binding of insulator, alignment damaged/rested pole, digging of pit, fixing angle its proper welding, grouting & plinthing of ST Pole as per RESPO specification and direction of E/I under the area. | 13 | Job | 5,390 ₹70,070 | 5,385 ₹70,005 | 8,500 ₹1.1 L |
| 6.00 | Opening and dismantling of all the wire and accessories from tilted pole and digging the pit for straightening of existing tilted support of HT/LT lines after. strengthening of tilted pole fixing of all accessories and re-stringing of old HT/LT line with help of T&P under the area. | 15 | Nos. | 3,340 ₹50,100 | 3,338 ₹50,070 | 3,200 ₹48,000 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
24 Feb 2026, 2:00 pmClosed
SUPERINTENDING ENGINEER (TECHNICAL) JANKIPURAM
SE (TECHNICAL) JANKIPURAM 33/11 KV S/S KAPOORTHALA
Various type Repairing and Maintenance work of HT/LT line and substation an other associated Running work in the work area of Assistant Engineer 11KV an LT, GPRA of 33/11 KV S/S GPRA an SAHARA STATE in the Jurisdiction of Executive Engineer 11KV and
2026_MVVNL_1117351_1
13/SE(TECH)/JZ/2025-26
Open Tender
Electrical Works
365 days
EE 11KV AND LT JANKIPURAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
E.E. EUDD MAHANAGAR
₹10,000
7 Mar 2026
18 Feb 2026
24 Feb 2026
18 Feb 2026
24 Feb 2026
18 Feb 2026
Safe loading, carriage unloading of following material from center store Daliganj to J.E.'s store and from J.E.'s stores to work at site.
(a) PCC Pole 8.5 Mtr Long.
(b) STP Pole 9/11 Mtr. Long.
©ABC 3X95/120+1X70+1X16 sqmm
(d) ACSR Conductor Weasel/Dog/Raccoon
Attending breakdown by Replacement of damage PCC Pole/STP pole, opening of HT/LT line & accessories by digging pit its proper erection . All T&P shall be provided by the Contractor.
Attending breakdown by Replacement of damage conductor of 11 KV/LT line Opening and dismantling of all the wire and accessories .All T&P shall be provided by the Contractor.
Attending brekdown by Replacement of damage ABC by newly ABC its Erection & commissioning of (3x95/120+1x70+1x16 sq.mm) Aerial Bunched Conductor. Only ABC shall be supplied by the department.
Repairing of damage/Rusted steel and rotten 11 Meter/9 Meter Long Steel Tubular Pole with the help of 03 Nos. MS Angle of size 40x40x5x1500mm. Work includes opening of binding of insulator, alignment damaged/rested pole, digging of pit, fixing angle its proper welding, grouting & plinthing of ST Pole as per RESPO specification and direction of E/I under the area.
Opening and dismantling of all the wire and accessories from tilted pole and digging the pit for straightening of existing tilted support of HT/LT lines after. strengthening of tilted pole fixing of all accessories and re-stringing of old HT/LT line with help of T&P under the area.
Re-stringing of loose 11 KV line along with opening of binding of insulator Re-stringing of line its proper |binding & jumpring etc
Re-stringing and sagging of loose ABC line along with opening of binding of insulator opening of consumer connection after restringing of line its proper binding & making re-connection of consumer.
Repairing of Guarding of 11 KV line with the help of binding wire. Suitable for 11 KV line, specially above those road crossing/HT, LT line crossing which guarding damaged/Jurjur to avoid accidents as per RESPO Specification and direction of E/I. (All material excluding GI wire shall be supplied by the contractor)
Pipe type earthing of T/F with 60 fit deep borring and providing GI Pipe 1.5" dia (60 fit Gl Pipe) and GI strip 25x5 mmx6 meter long attached with clamps, L piece, nut& bolts and GI Pipe Cap. All material shall be supplied by the contractor.
Carriage of T/F Trolley from 33/11 KV S/S to work site, shifting of T/F from damaged Plinth to T/F trolley with the help of crane & its commissioning.
Repairing of Masonary type transformer Plinth of size 2x2x1.5 M with brick cement coarse sand and brick ballast, filling of sand in the hallow space, Plastering of surface in ratio 1:4:6 top of the plinth 4 thikness grouting of 02 Nos. MS Channel of size 100x50x2000mm on the top of the plinth for placement of transformer (All the material, labour and T&P will be arranged by the contractor at his own cost)
Shifting of T/F from trolley to repaired plinth & its Commissioning and carrage back T/F trolley to 33/11 KV S/S.
Repairing of Masonry type distribution pillar box with brick, cement & sand, also replacement of damaged busbar and fuse unit.
Fabrication and erection of missing/damaged wiremess fencing 02 Mtr. Height with a gate and with retaining grouting of fabrication M.S Angle 65x65x6 mm support (05 Nos. in a sub-station) Plinthing of fencing/support with all material as per specification/drawing complete in all respect.
Cutting and chopping of tree branches falling upon |HT/LT line and LT substation. After clearance of line throughout pieces of tree branches of site in the area.
Attending breakdown of damaged pole PCC/STP of |11/0.4 KV S/S. works include dismantling existing T/F on double pole. Opening of all accessories, erection of pole fixing of all accessories installation of T/F and its Commissioning.
Checking of T/F oil and Toping up of the same.
Checking of oil leakage from T/F and replacement of ovel Oil seal etc and tightening.
Cleaning of 11/0.4 KV S/S removal of gradate dumps and its stacking outside/inside the.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
Tender_13_Tech.pdf
Tender Documents • 0.93 MB
BOQ_2076095.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid