Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.7 LAccepted-AOC 12 MANAULI HOUSE AMBALA CITY 134003 HRY | AMBALA CITY | AMBALA | HARYANA | 134003 | ₹33.7 L Quoted ₹35.3 L | L1 | Accepted-AOC The lowest tenderer |
| 2 | L2₹41.5 L+₹6.2 L (17.7%)Rejected-Finance 186 GANDHI MARKET AMBALA CANTT 133001 | AMBALA CANTT | AMBALA | HARYANA | 133001 | ₹41.5 L+₹6.2 L (17.7%) | L2 | Rejected-Finance Not the lowest tenderer |
| 3 | L2₹41.5 L+₹6.2 L (17.7%)Rejected-Finance 79 B BLOCK SRI GANGANAGAR 335001 RAJASTHAN | GANGANAGAR | RAJASTHAN | 335001 | ₹41.5 L+₹6.2 L (17.7%) | L2 | Rejected-Finance Not the lowest tenderer |
| 4 | Rejected-Technical | - | - | Rejected-Technical Requisite docus not found uploaded |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not enliested in appropriate category |
Tender Value
Refer Docs
EMD Value
₹68,420
Closing Date
18 Mar 2024, 6:00 pmClosed
HQ CWE SRI GANGANAGAR
HQ CWE POST BOX 48 SRI GANGANAGAR-335001 (Rajasthan)
REPAIR AND REPLACEMENT OF SEWAGE DISTRIBUTION NETWORK SWITCH GEARS CABLES INSTALLATION INCLUDING IMPROVEMENT OF WATER SUPPLY NETWORKING TO EXISTING STP AT MIL STN SRIGANGANAGAR
2024_MES_645362_1
CA NO CWE SGNR T-93 OF 2023-24
Open Tender
Miscellaneous Works
Item Rate
90 days
GE SRI GANGANAGAR
As per NIT
9 documents required · 9 mandatory
₹500
GE SRI GANGANAGAR
₹68,420
27 Mar 2024
6 Mar 2024
19 Mar 2024
6 Mar 2024
18 Mar 2024
13 Mar 2024
Amount
Dismantaling of old water level controller & replacement with new Micro controller IoT Based Water Level Control System consist of a microcontroller, pump, adaptor, sensor ultrasonic, and a relay module to control the pump or valve on the hardware side. microcontroller with ESP8266 based, microcontroller triggering relay switch open and close. With ultrasonic sensor to read the level of the water container, the level that read from ultrasonic transducer is to decide when the pump is working and not working. On the ultrasonic sensor there a two cable for trigger the ultrasonic sensor and receive the echo of ultrasonic sound. The microcontroller communicating via the internet to connect with Blynk server and Web server (Water Container Monitoring Information System) A complete Software system using Water Container Monitoring Information System incorporated with a Blynk IoT server. the microcontroller must be communicating on Blynk server and a PHP web-based Water Container Monitoring Information System via sending data level every 4 seconds to Water Container Monitoring Information System using protocol GET. Data that send via GET protocol is using the token of microcontroller, the water level of water container and valve or pump status. From microcontroller, Water Container Monitoring Information System check is there any token on the database? If token exists, so the data from microcontroller will be saved in the database, otherwise if the token from microcontroller is not exist so the data will not be collected in the database. In Water Container Monitoring Information System, data of water level and valve/pump status is saved with a timestamp, so every data has its timestamp. Micro controller also send data to Blynk server but data that send to Blynk server only save into file not into the database so that why we need a Water Container Monitoring Information System. Beside microcontroller send to data to Blynk server microcontroller also receive configuration data from Blynk server.
(Contd.......) The configuration data is water container height, Max upper-level limit, lower-level limit, mode and on/off the pump on configuration mode divided into two modes, which is auto and semi-auto. In auto mode, pump/valve automatically fill water container if the level is below the lower level limit and stop when the level of water is above or same as the upper-level limit. In semi-auto mode, if on/off in position on, the microcontroller works like auto mode, but if on/off in position off, the pump/valve will stay off until on/off in place on. A PHP Web-based Water Container Monitoring Information System is also communicating with Blynk server for change configuration using API (Application Programming Interface) so the user can change configuration data on Blynk server using Water Container Monitoring Information System also from Blynk Application on the smartphone. Ultra sensor must shoot ultrasonic pulse to the water surface and capture ultrasonic pulse reflection from the water surface. The different time between sensor ultrasonic shoot pulse and receive pulse must be converted into the distance (cm). After getting water level from the sensor, the next step by controller is to subtracting level from the sensor with a height of water container because if the water container is near full, the level from the sensor is shrinking, Push data to Water Container Monitoring Information System is run every 4 seconds so the server is not overloading. Push data to Blynk server run every 1 second. Minimum 1SO 9001:2015 Certified. Only Original OEM is entitled for work . Contractor has to ensure it. Necessary test certificates & Latest Purchase Vouchers to be scrutnised / approved by Engg-in-Charge & GE first before execution at site . Any Defect occuring during this period due to bad workmanship of material, manufacturing defect shall be rectified or replaced free of cost. The contractor shall furnish written gaurantee on letter head for above mentioned to the GE immidiately after completion of work. Contractor has to ensure Post Audit of work, without that completion will not be issued. Make : Ivetal/ Partner/ KCL
(Contd.....) Alarms and event logs – Alarm should Issue a system update that the system has detected. Passwords should be stored in encrypted format. Website should be accessible on all platforms and be compatible with popular browsers such as IE, Chrome, Firefox, Safari etc. Online Administration: All administration is handled online via a current web browser Audit Trail: Administrators can access logs in the backend on need-basis where they can view changes that have been made to the database for critical information. Data Backup should support PITR (Point-in-time-recovery). Scheduler for auto archival and backup of application and database to a different machine which should be capable of coming online by simply firing a script button in event of downtime of primary server. The database should use encryption at rest to persist the data in database. Secure password protected login for administrative actions in the system. All updates to data gathering hardware should be through OTA (over the air). No static IPs shall be made available at sites. The complete equipment must be programmed with protection CT inside the existing Low Tension switchgear /breaker / Switching Contactors along with multifunction microprocessor digital programmer having Main measurements and functions include: Voltage: phase, line and system values Current: phase values (neutral current calculated) Power: apparent, active and reactive phase and total values Power Factor per phase and total Frequency of measured voltage value HIGH LOW AVERAGE - - value functions for all measurements Maximum demand of power and current values Voltage and current asymmetry e important and should come first) should be able to turn off/on options in graphs to maximize utilization of available display area for each graph (ex. axis, legends, menu options, title etc.) Graphs should support at least following visualizations: line graph, pie graph, donut graph, area graph, bar graph, heatmap graphs User should be able to plot data from different sites on same graph Layout - Diagram of the system with SLD viewing options. Electrical SLD with all IEC symbols is must Chart - graphs based on data from multiple sources such as inverter and local weather databases.
(Contd.....) Histograms/Pie charts/Bar graphs/line graphs/ donut graph, area graph, heatmap graph shall be available. System should support Time vs Time comparison of captured parameters by showing data of interested days/months adjacent to each other (example: 9th day of this month, and last month displayed adjacent to each other) Total harmonic distortion ( ): voltage and current THD Energy meters for active, reactive, apparent partial and total values, per phase and system values Hour counter for programmable total and partial hours Phase active power unbalance must saturate sufficiently high to allow a relatively accurate measurement of the fault current by the protection whose operating threshold can be very high. with built in high Accuracy Limit Factor (ALF) ratio between the nominal overcurrent and the rated current. so that existing switchgear relay must be able to withstand high overcurrent’s also featured with Minimum 1SO 9001:2015 Certified. Only Original OEM is entitled for work . Contractor has to ensure it.Necessary test certificates & Latest Purchase Vouchers to be scrutnised / approved by Engg-in-Charge & GE first before execution at site . Any Defect occuring during this period due to bad workmanship of material, manufacturing defect shall be rectified or replaced free of cost. The contractor shall furnish written gaurantee on letter head for above mentioned to the GE immidiately after completion of work. Contractor has to ensure Post Audit of work, without that completion will not be issued. Make:- Partner/ MECO or equivalent make which is ISO 9001 : 2015 certified.
Supply, Installation, Testing & Commissioning of Engineering Control / Monitoring and Server System IRTU wireless Automation GPRS type including live interface comprising of; Air ventilated Rack mounted CENTRAL SCADA SYSTEM having; a. a. Base Workstation i3 8GB RAM , 512GB SSD SATA (3.0GHz, 8MB/80W), 4 DIMMS / 3.5” 7200Rpm/ 16x DVD +/-RW Drive - 01 nos,USB Optical Mouse / USB Keyboard / Windows 12 Server version OS/ Anti virus software / Restore software / 3 years Pro Support .Monitor 24"Rack 18 U x 600Wx1000D with side panel - 02 Nos. / Front - rear Door - 02 Nos./ Caster - 01 set / Fans - 02 Nos. / Cable Manager - 01 No.Router RV 042G - 2 WAN and 4 LAN ports Accessories: LAN Cable, KVM Cable, connectors etc. 2) Supply of Integrated Smart Station platform (multiple access) having modules for monitoring.a. Sewage Water Supply - Pumping & Distributionb. The Smart Station Platform shall be user configurable with respect to all critical features viz. Landing page, drop down tabs and menus, report formats, alerts and notification including Ethernet Switch –16 port GBPS layer 2 manageable switch. Also supported with Firewall Router with minimum 2 WAN ports and 4 LAN ports 4 10/1000 RJ-45 ports, 2 10/1000 RJ-45 Internet port.unit must support suitable OPC server for unlimited tags with MODBUS TCP/equivalent driver having provision for IOT gateway to exchange data between the PLC based panels and the system.built withTrans receiver IOT Gateway to be able send the OPC data to a broker on the central server using the latest MQTT protocol working on a Publish Subscribe Model. The IOT gateway shall be able to support 5000 tags.
(Contd.....) Android compatible MQTT broker at the central server to service publish and subscribe requests from the OPC server and the web clients. system must be compatible for Android Operating Systems along with the design and development of APIs at server side using JAVA / dotnet technologies to provide data to Android apps required to fetch and display data like :- (a) Status of Level Sensors, (b) Energy Parameters of Commercial , Dg & Pump Motor (c) Pressure Transducers compatibility in PLC system. (d) Any other parameter available in the system and as required by the Engineer in Charge. e) Facility to operate pumps either over GPRS network or by directly connecting to the serial / Ethernet port of the PLC using On The Go / any other suitable cable. With login and password facility and a minimum of 80 screens and having 25 concurrent licenses. Make : Partner/ MECO or equivalent make which is ISO 9001 : 2015 certified.
Supply ,testing instalation and commissioning of on load interlockable changeover cum corrector system & indoor type 3-phase main Auto Synchronizing automatic 120 degree phase angle corrector for motor protection comprising of 2 Nos. of power contactor of current rating 110 Amps both paralleled output having following features Complete microprocessor automation unit for retaining of phase angle shift of 120° irrespective incomer rotational angle shift suitable for three phase windings and digital monitor the 3 phase voltages for proper voltage level on all three phases during a short start up delay. Second command energizes first if the phase sequence is correct. When all voltages are acceptable internal protection first command energizes allowing the motor or equipment to start. These contacts are connected to a reversing contactor to automatically correct the phase sequence (if needed) before permitting the equipment to energize. electronic RC (resistor-capacitor) network comprising of 3 phase transformer unit operating voltage 440 volts, insulation upto 500 Volt, signal command 0-15 volts, built with integrated operational amplifier circuit featuring the output to give correct phase (i.e. RYB irrespective whether input is RYB, YRB or BRY) irrespective either supply is coming from Mains or DG Set or any third party source and also featuring single phasing prevention in case of phase failure at input/output, connecting its output to common bus bar of existing panel equipped with digital three phase voltmeter Accuracy Cl. 0.5 (model No. DM3210 of CONZERV (Schneider) or an equivalent model of Areva / Neptune / Secure) enclosed in & including suitable size powder coated enclosure, duly painted with two coats of synthetic enamel paint over a coat of red oxide primer, complete all as specified and as directed by Engineer-in-Charge. (MAKE : PARTNER Cat part No PI3PSQ110 /SIEMENS/L&T/BCH ) MINIMUM 1SO 9001:2015 CERTFIED
Supply, Installation Testing & Commissioning of Programmable Logic Controller with L4 CPU & GPRS communication-based Pump Automation and Protection Panel fabricated from 1.6 mm thick CRCA sheet and properly powder coated suitable for Control & Monitoring of 04 Nos Pumps, 04 Nos energy meters , 01 No Ultra sonic level sensor/Hydrostatic Sensor .PLC should support DNP-3, Modbus ,TCPiP, Canopen, Satellite, GPRS,Backnet, IEC61850,ZIGBEE-RF, GPS Interface, Leo Satellite Network Protocol.compliance with Google Earth Interface including the following Design and development of KML/KMZ files on Google earth platform clearly marking the locations of all the Pump houses, Buildings, tanks and outdoor valves etc, which shall be visible to only those who are authorized to view the KML files.Design and development of HTML code to display important parameters like Pump Type, Mfr, valve size, attach image etc of each element.Design and development of Web service in Dotnet/Java/Php at the main server to link to the Smart Stn Platform Database. Make : Partner/ MECO or equivalent make which is ISO 9001 : 2015 Certified.
Supply,installation,testing and commmissioning with replacement of Digital Electronic Star delta starter fully automatic type also built with automatic power factor controller capacitor Protection against power factor of the electrical system exceeding more then desired set Protection at power failure to Close the capacitor bank and should not activate due to sudden variation in the load the power factor shoots above unity Auto shut down panel or switching off starter condition. not to be re-energized till it discharges to a safe value of 50 volts or less, switching device should be instantaneous type with low voltage setting Spikes/Surge protection to trip the capacitor bank at overloading due to over voltage or harmonic current. over current relay tripping protection of the bank against system disturbances and faults protection of the bank against faults occurring within the bank Timer for re-energisation after 5 minutes: protection to block the re-switching of capacitor bank in less than 15 minutes.accuracy up to 2%, Electronic Automatic Reactance Discharge kit to avoid breakdown , Withstand harmonics overload Suitable for linear/non linear load Over current up to 4in max. current Low losses less than 0.2 KW/KVAR Temperature range 25 C to 70 C open enclosure type suitable for load up to 3 phase submersible Motor up to 40 HP with on delay timer of three minutes to equalize the inlet/outlet water flow for every mains failure& each cut off consisting of air break contactors 70 Amps 03 Numbers with copper strips & multifunctional V,A,F & PF Meter also built with 3 Phase Digital Micro Chip Programmer Main Automatic voltage , current ,protection unit suitable for load up to 40 HP FUNCTION Phase Unbalance, Phase Reversal, Phase Missing, Under Voltage and Over Voltage Monitor and Control,
Note : (a) ENERGY AUDIT After completion of the work the contractor shall ensure WATER DATA ANALYSER working for 02 years after installation of the system, the contractor will get the same audited from accredited energy auditor India/MES enlisted energy auditor other than contractor himself who will submit the energy audit report to Engineer in Charge. All the expenses on this account shall be borne by the contractor. Completion certificate will not be issued till the satisfactory energy audit report is received. (b) TRAINING OF MES PERSONNEL The contractor shall arrange to impart training to the MES personnel on the following aspects prior to provisional takeover of the system: - (i) Operation of Starters , auto manual mechanism (ii) Adjustment of settings for controls and protective devices. (iii) Preventive maintenance (iv) Identification and replacement of worn out parts. No extra charges will be paid seperately
M/S Sonu Traders
THAKURJI ENTERPRISES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .