| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.8 LAccepted-AOC | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹17.9 L+₹4,247 (0.24%)Rejected-AOC | L2 | Rejected-AOC REJECT |
| Sl No | Description | Qty | Unit | sirpi infrastructure L2 | JAI CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavationina in ¢o sor inc ing sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth. murram, stoney earth, gravel and shales etc excepting all kinds of rock and boulders exceeding 0014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in charge | 45 | M3 | 221 ₹9,945 | 219 ₹9,855 Lowest |
| 2.00 | plain cement concrete 1:4:8 part one part of cement four parts of sand and eight parts of stone jelly by volume) using of 40 mm thick granite hard broken stones, all machine mixed, Iaid to uniform thickness of 100mm and top left rought to receive floor finish including all labour charges for concreting, ramming, curing etc, and providing expansion joints, slopes & grades if any etc., complete complying with relevant standard specifications at all leads & lifts inside the building | 45 | M3 | 5,965 ₹2,68,425 | 5,962 ₹2,68,290 Lowest |
| 3.00 | Dismantling plain cement concrete including all labour charges etc completed | 12 | M3 | 525 ₹6,300 | 520 ₹6,240 Lowest |
| 4.00 | Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (MSand)) using II class groundmoulded bricks of size 9" X 4 3/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification - 1OOCFT | 102 | M2 | 6,985 ₹7,12,470 | 6,984 ₹7,12,368 Lowest |
| 5.00 | Plasteringwithcementmortar1:S(OnepartofCement and Five part of Plastering Sand(P-Sand))12mm, thick inall floorsincludingcostandconveyanceofallmaterilas tositeand labourchargesetc,completeasper standard specifications | 891 | M33 | 310 ₹2,76,210 | 309 ₹2,75,319 Lowest |
| 6.00 | Painting two coats for Exterior surface with approvedExteriorPlasticEmulsionpaintapproved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, where ever required etc,completeasperstandard specification. | 496 | MT | 292 ₹1,44,832 | 290 ₹1,43,840 Lowest |
| 7.00 | Preparation of soil mixture by breaking clods, sieving and mixing of fertile earth (including red soil, silt and sand etc. according to requirements) and farmyard manure, heaping at the filling site and filling in polythene bags, arranging bags in beds and pricking out the seedlings (Excluding cost of fertile earth and farm ard manure | 177 | M3 | 1,200 ₹2,12,400 | 1,199 ₹2,12,223 Lowest |
| 8.00 | Supply and Plantation of plants to center median (1. Palms - 3 - 4’ 2. Crotons diff colour23' 3. Yucca -2-3' 4, Duranta - 1' 5. Agave - 23' 6. Monstera - 2’ 7, Dracena - 2' 8. Spider lilly -1' 9. Aglonema - 1' 10. Neerium diff varieties - 2-3' Alternanthera ficoidea 'Partytime’ Dwarf Nandina (Nandina domestica 'Nana') Crotons (Codiaeum variegatum varieties) Prayer Plant (Maranta leuconeura ‘Red Vein' or 'Green Vein’) Peace Lily (Spathiphyllum spp.) Stromanthe sanguinea ‘Triostar’ Dwarf Schefflera (Schefflera arboricola ‘Dwarf') Lady Palm (Rhapis excelsa) Korean Grass (Zoysia tenuifolia)) etc., Completed | 1,800 | M | 86 ₹1,54,800 | 85 ₹1,53,000 Lowest |
Tender Value
₹21.4 L
EMD Value
₹21,350
Closing Date
13 Nov 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of center median and plantation at Pollachi road centre mediant (LIC Colony to SIDCO) at Kurichi South Zone.
2025_MAWS_618150_29
e52/2025
Open Tender
Civil Works
Works
120 days
Coimbatore corporation
As per Tender Document
5 documents required · 5 mandatory
₹0
₹21,350
18 Mar 2026
29 Oct 2025
14 Nov 2025
29 Oct 2025
13 Nov 2025
29 Oct 2025
Amount
Earth work excavationina in ¢o sor inc ing sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth. murram, stoney earth, gravel and shales etc excepting all kinds of rock and boulders exceeding 0014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in charge
plain cement concrete 1:4:8 part one part of cement four parts of sand and eight parts of stone jelly by volume) using of 40 mm thick granite hard broken stones, all machine mixed, Iaid to uniform thickness of 100mm and top left rought to receive floor finish including all labour charges for concreting, ramming, curing etc, and providing expansion joints, slopes & grades if any etc., complete complying with relevant standard specifications at all leads & lifts inside the building
Dismantling plain cement concrete including all labour charges etc completed
Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (MSand)) using II class groundmoulded bricks of size 9" X 4 3/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification - 1OOCFT
Plasteringwithcementmortar1:S(OnepartofCement and Five part of Plastering Sand(P-Sand))12mm, thick inall floorsincludingcostandconveyanceofallmaterilas tositeand labourchargesetc,completeasper standard specifications
Painting two coats for Exterior surface with approvedExteriorPlasticEmulsionpaintapproved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, where ever required etc,completeasperstandard specification.
Preparation of soil mixture by breaking clods, sieving and mixing of fertile earth (including red soil, silt and sand etc. according to requirements) and farmyard manure, heaping at the filling site and filling in polythene bags, arranging bags in beds and pricking out the seedlings (Excluding cost of fertile earth and farm ard manure
Supply and Plantation of plants to center median (1. Palms - 3 - 4’ 2. Crotons diff colour23' 3. Yucca -2-3' 4, Duranta - 1' 5. Agave - 23' 6. Monstera - 2’ 7, Dracena - 2' 8. Spider lilly -1' 9. Aglonema - 1' 10. Neerium diff varieties - 2-3' Alternanthera ficoidea 'Partytime’ Dwarf Nandina (Nandina domestica 'Nana') Crotons (Codiaeum variegatum varieties) Prayer Plant (Maranta leuconeura ‘Red Vein' or 'Green Vein’) Peace Lily (Spathiphyllum spp.) Stromanthe sanguinea ‘Triostar’ Dwarf Schefflera (Schefflera arboricola ‘Dwarf') Lady Palm (Rhapis excelsa) Korean Grass (Zoysia tenuifolia)) etc., Completed
sirpi infrastructure (BID ID -1510805)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_739224.xls
BOQ • 0.29 MB
BuildingCondition.pdf
Tender Documents • 0.99 MB
ITB.pdf
Additional Documents • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .