Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.9 LAccepted-Finance 57 KAMARAJ STREET KOLAPPALUR GOBICHETTIPALAYAM ERODE 638 456 | GOBICHETTIPALAYAM | ERODE | TAMIL NADU | 638456 | 1 | Accepted-Finance Financial Bid Ok |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
25 Jul 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE/O/UDT
230KV Substation Campus, Periyakottai Pirivu, Udumalpet.
Dismandling and Erection of 4Nos of 110KV ABS WOE in 110KV Capasitor bank I and II and LV I and LV III
2023_EB_341178_1
EE/O/UDT/OT07/23-24/Dt.11.7.23
Open Tender
Electrical Works
Works
periyakottai pirivu
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,000
Yes
28 Jul 2023
11 Jul 2023
26 Jul 2023
11 Jul 2023
25 Jul 2023
11 Jul 2023
Amount
Supply of PVC Stickers for Breakers, Panels, chargers and General Key Boards including pasting and other works etc., as required as directed by field Engineer
Supply of Paint including cost of paint, brush Enamel paint and consumables etc.,
Supply of Paint including cost of paint, brush and consumables etc., One coat enamal painting/Anti corrasive Painting of Chequrred plates, Equipment board, identification of earth pit board and yard light pole, structure earthing, earth mat, earth pit, shoe paint and Iron and steel items as directed by the field Engineer. (Electricity supply will be brone by department)(Note:- 20% Extra Rate for LC Work for Labour only)
Supply of Switch End Clamp for Single Zebra
Supply of Switch End Clamp for 3" Bus Bar
Supply of T Clamp for Single Zebra to Single Zebra
Supply of T clamp for 3" Bus to Single Zebra
Supply of 3" Bus bar Expansion clamp
Supply of 3" Bus bar Corona ball
Supply of Twin zebra swith end clamp
Supply of reputed make long shackle 6lever Navtal lock with triplicate keys for AB Switches and for any other purpose including the cost of ring and key token as directed by the field Engineer.
Labour for Dismantling of Isolators including (AB Switches) including Solidcore Insulators as directed by the Field Engineer without Earth Hand Operated 110KV (Note:- 20% Extra rate for LC Work for Labour only)
Labour for Erection of Isolators including (AB Switches) including Solidcore Insulators without Earth Hand Operated 110KV with proper allignments including accessories, Meggering and cost of consumables and lubricants and as directed by the Field Engineer (Note:- 20% Extra rate for LC Work for Labour only)
Labour for the Dismantling of Bus Bar with appropriate machineries and consumables including End Clamps Using 75mm IPS Aluminium Tube without making Bend, whereever necessary as Directed by the Field Engineer (Note:- 20% Extra rate for LC Work for Labour only)
Labour for Erection of Bus Bar with appropriate machineries and consumables including suitable modification of End Clamps, Providing holes etc., Using 75mm IPS Aluminium Tube without making Bend, whereever necessary as Directed by the Field Engineer (Note:- 20% Extra rate for LC Work for Labour only)
Labour for the Dismantling of Single Jumpers and Droppers using Moose/Zebra/Panther Conductors including End clamps Upto height of 6m from ground level, whereever necessary as Directed by the Field Engineer (Note:- 20% Extra rate for LC Work for Labour only)
Labour for the Dismantling of Single Jumpers and Droppers using Moose/Zebra/Panther Conductors including End clamps Upto height of 6mts to 10 m from ground level, whereever necessary as Directed by the Field Engineer (Note:- 20% Extra rate for LC Work for Labour only)
Labour for the Dismantling of Single Jumpers and Droppers using Moose/Zebra/Panther Conductors including End clamps Upto height of 6mts from ground level, whereever necessary as Directed by the Field Engineer (Note:- 20% Extra rate for LC Work for Labour only)
Labour for the Dismantling of Twin Jumpers and Droppers using Moose/Zebra/Panther Conductors including End clamps Upto height of 6mts to 10 m from ground level, whereever necessary as Directed by the Field Engineer (Note:- 20% Extra rate for LC Work for Labour only)
Labour for the Erection of Single Jumpers and Droppers using Moose/Zebra/Panther Conductors including suitable modification of End clamps, providing holes etc.,Upto height of 6m from ground level, whereever necessary as Directed by the Field Engineer (Note:- 20% Extra rate for LC Work for Labour only)
Labour for the Erection of Single Jumpers and Droppers using Moose/Zebra/Panther Conductors including suitable modification of End clamps, providing holes etc.,Upto height of 6mts to 10 m from ground level, whereever necessary as Directed by the Field Engineer (Note:- 20% Extra rate for LC Work for Labour only)
Labour for the Erection of Twin Jumpers and Droppers using Moose/Zebra/Panther Conductors including suitable modification of End clamps, providing holes etc.,Upto height of 6mts to 10 m from ground level, whereever necessary as Directed by the Field Engineer (Note:- 20% Extra rate for LC Work for Labour only)
Labour for the Erection of Twin Jumpers and Droppers using Moose/Zebra/Panther Conductors including suitable modification of End clamps, providing holes etc.,Upto height of 6mts from ground level, whereever necessary as Directed by the Field Engineer (Note:- 20% Extra rate for LC Work for Labour only)
Labour for the Dismandling of Insulators Single pole stack for supports, 110KV Up Right (Note:- 20% Extra rate for LC Work for Labour only)
Labour for the Erection of Insulators Single pole stack for supports, 110KV Up Right (Note:- 20% Extra rate for LC Work for Labour only)
Labour machineries, consumables for earth raisers for equipments and structures (Electricity supply will be brone by department) (Note:- 20 % Extra Rate for LC Work for Labour only)
EPF for labour only to be quoted in Percentage (value alone)Ex. 13%, it should be entered as 13 only for Tamil Nadu Contractor. If the contractor is outside Tamil Nadu may be quoted as "0" only
ESI for labour only to be quoted in Percentage (value alone)Ex.3.25%, it should be entered as 3.25 only for Tamil Nadu Contractor. If the contractor is outside Tamil Nadu may be quoted as "0" only
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only for Tamil Nadu Contractor. If the contractor is outside Tamil Nadu may be quoted as "0" only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only for Tamil Nadu Contractor. If the contractor is outside Tamil Nadu may be quoted as "0" only
Inter-state GST to be quoted in percentage (value alone) Ex. 18%, it should be entered as 18 only for other than Tamil Nadu contractor. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .