Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC NIL | ₹5.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.3 L+₹32,461.74 (6.48%)Rejected-Finance NEAR NEW BUS STAND ANNI DISTT KULLU H P | ANNI | KULLU | HIMACHAL PRADESH | ₹5.3 L+₹32,461.74 (6.48%) | L2 | Rejected-Finance L2 |
| 3 | L3₹5.3 L+₹32,461.74 (6.48%)Rejected-Finance HIMACHAL PRADESH HP | ₹5.3 L+₹32,461.74 (6.48%) | L3 | Rejected-Finance L3 |
Tender Value
₹5.0 L
EMD Value
₹4,989
Closing Date
3 Apr 2026, 9:00 amClosed
Resident Engineer
Resident Engineer, GPHD, Jeori
HPSEBL/GPHD/DB-9/2026-27-20 REFER NIT
2026_HPSEB_132747_1
HPSEBL/GPHD/DB-9/2026-27-020
Open Tender
Power/Energy Projects/Products
Percentage
60 days
Chaba
Class A Electrical Licence
6 documents required · 6 mandatory
₹590
₹4,989
8 Sept 2026
28 Mar 2026
4 Apr 2026
28 Mar 2026
3 Apr 2026
28 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supply Part | |||||
| 1.01 | Supply of ACSR 6/1/3.35mm 50mm2 ( includes 3 conductor lengths and additional 1% (sag, jumpering and wastage). | - | Km | - | - |
| 1.02 | Supply of Steel Tubular poles 10Mtr. Long. | - | Nos | - | - |
| 1.03 | Supply of Muffs with concrete filling. | - | Nos | - | - |
| 1.04 | Supply of Dead End Structures X-Arms (MS Channel Iron (100*50*6mm), length 2800mm | - | Nos | - | - |
| 1.05 | Supply of Dead End Structures X-Bracing set MS Angle Iron : (50*50*6) length (2125mm)*2No. | - | Nos | - | - |
| 1.06 | Supply of Dead End Structures Belt Set-MS Angle Iron:65X65X6, Length: (1800mm)*2Nos. | - | Nos | - | - |
| 1.07 | Supply of Disc Insulator sets on Dead End Str (Disc porcelain, BS 12KV, 90KN, including Dead End Clamps, Ball Cleaves eye socket Straight stapple & Bend stapple etc) | - | Set | - | - |
| 1.08 | Supply of 22KV Pin Insulators (Porcelain,24Kv,10KN) with GI Pin. | - | Nos | - | - |
| 1.09 | Supply of HT Stay/Guy Arrangement Stay Set complete in all respects | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_196284.xls
BOQ • 0.37 MB
20tender.pdf
Tender Documents • 0.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .