Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical R O CHUCHOT GONGMA | POONCH | JAMMU AND KASHMIR | 185101 | Accepted-Technical Admitted |
| 2 | Accepted-Technical | Accepted-Technical Admitted |
| 3 | Accepted-Technical CHUCHOT | Accepted-Technical Admitted |
| 4 | Accepted-Technical | Accepted-Technical Admitted |
| 5 | Accepted-Technical | Accepted-Technical Admitted |
Tender Value
₹49.6 L
EMD Value
₹99,300
Closing Date
12 Jan 2026, 4:00 pmClosed
Executive Engineer Igoo Phey Division Leh
Executive Engineer Igoo Phey Division Leh
Improvement and Strengthening of Super passage aqueducts trough and fall at various Nallah Crossing by way of Protection works at Upstream of Igo Phey Cannal at various Location D1 D30 of Igo Phey Canal Under CAPEX
2025_PWD_18195_4
E-Tender 23of IPD Leh of 2025-26
Open Tender
Civil Works - Others
45 days
leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Executive Engineer Igoo Phey Division Leh
₹99,300
17 Jan 2026
18 Dec 2025
14 Jan 2026
18 Dec 2025
12 Jan 2026
18 Dec 2025
Earth work in bulk excavation by mechanical means (Hydraulicexcavator )over areas (exceeding30cmindepth,1.5minwidthaswellas10sqmonplan) includin gettingoutanddisposalofexcavatedearthleadupto50mandliftupto1.5m,asdirected by Engineer-in-charge.All kinds of soil
Constructing vertical bunds with sloping faces, by boulder filling (dry, hand packed tightly) including cost of stones but excluding cost of wirecrates
Making knitted wire crates of approved mesh-size; including weaving, binding sides and partitions, and binding top after filling; excluding cost of filling, stones and weaving materials
Dismantling old protection work including cutting of creates and stacking of stones.
Raking out joints in lime or cementmortar and preparing the surface forrepointing or replastering, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge.
Demolishingcementconcretemanually/bymechanicalmeansincludingdisposalof material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:4:8 or richer mix (i/c equivalent design mix)
Dumping stone in horizantal on level including cost of stone
20mm cement plaster of mix(1:4)
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C.work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and Medium Tensile steel bars.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources)
Centering and Shuttering including strutting propping etc and removal of form work. WALL
Providing and fixing of winch box of gate system with all necessary rods handles allied repair works to operate the hydraulic gate at different location complete job including carriage upto sitte work
Carriage of materials from source to site of work. Cement avg. lead 5 km.
Sand avg. lead 15 km.
Steel avg. lead 10 km.
Stone avg. lead 15km
Aggregate avg. lead 15 km.
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_43967.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid