Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.9 LAccepted-AOC | 1 | Accepted-AOC Rates Accepted | |
| 2 | 2₹15.3 L+₹4.4 L (40.0%)Rejected-Finance | 2 | Rejected-Finance Quoted amount rejected | |
| 3 | 3₹16.2 L+₹5.3 L (48.1%)Rejected-Finance 63 D SECTOR D D A COLONY KOHEFIZA BHOPAL M P 462001 | BHOPAL | MADHYA PRADESH | 462001 | 3 | Rejected-Finance Quoted amount rejected |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
21 Mar 2022, 4:00 pmClosed
DIRECTORATE SPORTS
T T NAGAR STADIUM BHOPAL
E Tender for Digging of Bore Well Supply and Installation of Submersible Pumps etc. 2022 First Call
2022_DSYW_189849_1
9611A/DSYW/INFRA/2022
Open Tender
Miscellaneous Goods
Item Rate
730 days
BHOPAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
₹80,000
5 Jul 2022
11 Mar 2022
22 Mar 2022
11 Mar 2022
21 Mar 2022
16 Mar 2022
Amount
DIGGING OF BOREWELL
Survey by Hydrological Expert
Borewell Digging and Casing pipe and Joining
Borewell Digging by DTH Machine
Telescopy Bore
Hard stator
MS Casing Pipe Size 6.5"
MS Casing Pipe Size 7"
MS Casing Pipe Size 8"
PVC Casing Pipe Size 5"
PVC Casing Pipe Size 7"
PVC Casing Pipe Size 8"
Joining/ Welding of Pipe to Pipe
Cutting of Filtration Slots
Greval Pack Borewel
Pump sets
5HP Jalpari Motor
2 HP Submersible Pump Single Phase
3 HP Submersible Pump Single Phase
4 HP Submersible Pump Three Phase
5 HP Submersible Pump Three Phase
7.5 HP Submersible Pump Three Phase
10 HP Submersible Pump Three Phase
12.5 HP Submersible Pump Three Phase
15 HP Submersible Pump Three Phase
30 HP Submersible Pump Three Phase
40 HP Submersible Pump Three Phase
Jalpari 2HP
Jalpari 3HP
Jalpari 7.5 HP
Jalpari 10 HP
Electrical Panel
Electrical Cable
HDPE Pipes & Fittings
63 MM X 10 KG
63 MM X 6 KG
50 MM X 10 KG
50 MM X 6 KG
40 MM X 10 KG
40 MM X 6 KG
32 MM X 10 KG
32 MM X 6 KG
1.25” Elbow
1.5” Elbow
2” Elbow
2.5” Elbow
3” Elbow
1.25”Ball Valve
1.5” Ball Valve
2” Ball Valve
2.5” Ball Valve
3” Ball Valve
2”Foot Valve
2.5” Foot Valve
3” Foot Valve
1.25”Union
1.5” Union
2” Union
2.5” Union
3” Union
1.25” End Cap
1.5” End Cap
2” End Cap
2.5” End Cap
3” End Cap
Borewell Acessories
Bore Cap
Pairs of MS Clamps
GI Pipes & Fitting
1.25” Elbow
1.5” Elbow
2” Elbow
2.5” Elbow
3” Elbow
1.25”Ball Valve
1.5” Ball Valve
2” Ball Valve
2.5” Ball Valve
3” Ball Valve
2”Foot Valve
2.5” Foot Valve
3” Foot Valve
1.25”Union
1.5” Union
2” Union
2.5” Union
3” Union
GI Socket 1.25"
GI Socket 1.50"
GI Socket 2"
GI Socket 2.50"
GI Socket 3"
Nipple 4"x1.25"
Nipple 6"x1.25"
Nipple 12"x1.25"
Nipple 4"x1.50"
Nipple 6"x1.50"
Nipple 12"x1.50"
Nipple 4"x2"
Nipple 6"x2"
Nipple 12"x2"
Nipple 12"x2.50"
Nipple 6"x2.50"
Nipple 4"x2.50"
Flanch 2"
Flanch 2.50"
Flanch 3"
CI Valve 1.25"
CI Valve 1.50"
CI Valve 2"
CI Valve 2.50"
CI Valve 3"
C PVC Pipes & Fittings
C PVC Pipe 1.5"
C PVC Pipe 2"
C PVC Bend1.5"
C PVC Bend 2"
C PVC Elbow 1.5"
C PVC Elbow 2"
C PVC Tee 1.5"
C PVC Tee 2"
Installation of Pumpset in Borewell
Installation with GI Pipe
Installation with HDPE pipe
Nylon Rope
Rates for Revolving Impact/ Geared Sprinkler System
Supply of 3" G.I. Pipeline with necessary fitting to carry water from the Main line to the Storage tank, with one valve's
Supply of HDPE storage tank of capacity 10,000 liters
Supply of 7.5 H.P. ISI marked Electric pump set with required suction & delivery fittings, valve and control panel duly complete.
Supply of 90 mm / 4 kg. HDPE Pipes ISI marked with required compression fittings to carry water from pump set to the pipeline grid.
Supply of 110 mm / 4 kg. HDPE Pipes ISI marked with required compression fittings & HDPE fittings to form a complete Pipeline grid
Supply of Self closing Hydrants with required HDPE Base mountings
Supply of Hydrant openers
Supply of Impact Sprinkler-
Supply of 110 mm - 4 kg. HDPE Pipes with portable quick action couplers and required necessary fittings for connection from the Pipe grid
Mechanical Installation of the materials supplied by us
Trench cutting & Backfilling under normal soil conditions (60cm×60 cm)
G.I. Pipe 2"
G.I. Pipe 2.5"
Flat PVC Cable 4 sq & 6 sq.
Rates for Borwell / Sprinkler & Pumpset Repairs
Rewinding of Pump sets
2 HP Submersible Pump Single Phase
3 HP Submersible Pump Single Phase
4 HP Submersible Pump Three Phase
5 HP Submersible Pump Three Phase
7.5 HP Submersible Pump Three Phase
10 HP Submersible Pump Three Phase
12.5 HP Submersible Pump Three Phase
15 HP Submersible Pump Three Phase
2 HP Openwell Submersible Pump Single Phase
3 HP Openwell Submersible Pump Single Phase
4 HP Openwell Submersible Pump Three Phase
5 HP Openwell Submersible Pump Three Phase
6 HP Openwell Submersible Pump Three Phase
7.5 HP Openwell Submersible Pump Three Phase
10 HP Openwell Submersible Pump Three Phase
2 HP Monoblock Pump Three Phase
3 HP Monoblock Pump Three Phase
5 HP Monoblock Pump Three Phase
7.5 HP Monoblock Pump Three Phase
10 HP Monoblock Pump Three Phase
12 HP Monoblock Pump Three Phase
15 HP Monoblock Pump Three Phase
20 HP Monoblock Pump Three Phase
22.5 HP Monoblock Pump Three Phase
25 HP Monoblock Pump Three Phase
30 HP Monoblock Pump Three Phase
40 HP Monoblock Pump Three Phase
Electrical Panel
Flushing
Labour
Installation
Lowering and taking out of pumpset with GI pipe
Lowering and taking out of pumpset with HDPE Pipe
Column Pipe
Socket
Digging and Fitting of GI Pipe line & HDPE Pipe line
MS GULREZ AKREM SIDDIQUI
HAZIQ CONTRACTORS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .