Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.1 LAccepted-AOC UTTAR PRADESH UP | GHAZIABAD | UTTAR PRADESH | 201001 | ₹71.1 L | L1 | Accepted-AOC awarded accepted |
| 2 | L1₹71.1 LAccepted-AOC BHARARI MANDA KHAS MEJA PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | ₹71.1 L | L1 | Accepted-AOC not awarded rejected |
| 3 | L3₹71.1 LSame as L1Rejected-Finance | ₹71.1 LSame as L1 | L3 | Rejected-Finance rejected being highest quatated rate |
Tender Value
₹73.7 L
EMD Value
₹5.7 L
Closing Date
8 Jun 2026, 12:00 pmClosed
SE CIRCLE PWD AYODHYA
OFFICE OF SE CIRCLE PWD AYODHYA
Construction of 3x5.00 m span Box Culvert at Sarain Sikandar link road
2026_CEUFZ_1153163_2
3451/2yataAyo-AmbCircle/2026 Date21-05-2026
Open Tender
Civil Works - Bridges
Fixed-rate
180 days
BARABANKI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
Yes
₹5.7 L
Yes
AYODHYA
10 Jul 2026
25 May 2026
8 Jun 2026
25 May 2026
8 Jun 2026
25 May 2026
1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. | 300 | Cum | 130 | ₹39,000 |
| 2 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification | 45 | Cum | 777 | ₹34,965 |
| 3 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 103 | Cum | 6,679 | ₹6,87,937 |
| 4 | RCC Grade M30 using batching plant transit mixer & Concrete pump | 218 | Cum | 9,066 | ₹19,76,388 |
| 5 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. | 25.6 | MT | 84,479 | ₹21,62,662.4 |
| 6 | Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. | 124.5 | Cum | 6,937 | ₹8,63,656.5 |
| 7 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications | 36 | Cum | 4,085 | ₹1,47,060 |
| 8 | Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. | 158 | cum | 3,289 | ₹5,19,662 |
| 9 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications | 45.6 | RM | 307 | ₹13,999.2 |
| 10 | Providing and Laying of drainage spouts complete as per drawing and technical Clause 2705 of MoRTH Specifications. | 6.75 | RM | 4,239 | ₹28,613.25 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_2160280.xls
BOQ • 0.28 MB
T2.pdf
Tender Documents • 0.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .