Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance | ₹1.1 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.2 CrAccepted-Finance | ₹1.2 Cr | L2 | Accepted-Finance L2 |
| 3 | L3₹1.3 CrAccepted-Finance 7 145 MALLIKUNDAM PO MECHARI VIA MALLIKUNDAM VIA METTUR TK SALEM DT | ₹1.3 Cr | L3 | Accepted-Finance L3 |
| 4 | L4₹1.3 CrAccepted-Finance 57 KAMARAJ STREET KOLAPPALUR GOBICHETTIPALAYAM ERODE 638 456 | GOBICHETTIPALAYAM | ERODE | TAMIL NADU | 638456 | ₹1.3 Cr | L4 | Accepted-Finance L4 |
| 5 | L5₹1.4 CrAccepted-Finance KULLANDI STREET PALLIPATTI PO METTUR TK SALEM 636458 | SALEM | SALEM | TAMIL NADU | 636458 | ₹1.4 Cr | L5 | Accepted-Finance L5 |
| Sl No | Description | Qty | Unit | M s Kumaresan and co L5 | sai pranesh infrastructures L3 | C.GOVINDAN L4 | H.Venkateswaran L1 | Nagul Power Developers L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Schedule I (Civil and erection works) | 1 | No | 38,46,725 ₹38.5 L | 32,69,720 ₹32.7 L | 39,57,725 ₹39.6 L | 28,80,800 ₹28.8 L | 29,81,904 ₹29.8 L |
| 2.00 | Schedule II (Supply of Materilas) | 1 | No | 88,77,000 ₹88.8 L | 89,85,560 ₹89.9 L | 85,52,290 ₹85.5 L | 82,99,000 ₹83.0 L | 84,40,540 ₹84.4 L |
| 3.00 | Applicable GST Amount (Total GST Amount @18%) | 1 | No | 22,90,270.5 ₹22.9 L | 22,05,950.4 ₹22.1 L | 22,51,802.7 ₹22.5 L | 20,12,364 ₹20.1 L | 20,56,039.92 ₹20.6 L |
| 4.00 | Schedule III (Cost towards Retrieved materials) | 1 | No | -21,48,375 -₹21,48,375 | -11,80,334.25 -₹11,80,334.25 | -11,81,921.25 -₹11,81,921.25 | -22,15,231.25 -₹22,15,231.25 | -15,95,325.75 -₹15,95,325.75 |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
29 Dec 2025, 2:00 pmClosed
CE/TP-II/Trichy
The Chief Engineer, Transmission Projects II, Periyamilaguparai, Near Collectorate, Trichy - 1.
Strengthening of existing 230kV O.K.Mandapam - Myvadi feeder SC line on DC tower(loc 29-Udumalpet SS)Reach19.
2025_EB_631717_1
CE/TP-II/TRY/C-102/25-26
Open Tender
Civil Works
180 days
Myvadi
As per Tender Specification
4 documents required · 4 mandatory
₹0
₹1.5 L
Yes
14 May 2026
12 Dec 2025
30 Dec 2025
12 Dec 2025
29 Dec 2025
15 Dec 2025
Schedule I (Civil and erection works)
Schedule II (Supply of Materilas)
Applicable GST Amount (Total GST Amount @18%)
Schedule III (Cost towards Retrieved materials)
BoQ_Ver3.0
Specification No: CE/TP-II/TRY/C-102/2025-26
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE ( I ) - (Civil and Erection works) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Conducting check survey, fixing of Location and pit marking of tower as per approved profile including all materials labour, cost of survey equipment T & Ps Lead,lift& including cutting,of small trees wherever necessary as directed by engineer.
Earth work excavation depositing on bank with initial lead of 10 m and lift of 2 m in Hard shift clay shift black cotton soil, hard red earth,shales ,murram, gravel, stoney,earth and earth mixed with small size boulders etc., Complete
Earth work excavating and depositing on Bank with initial lead of 10m and initial lift of 2m in medium rock and dense medium rock not requiring blasting
Earth work excavating and depositing on Bank with initial lead of 10m and initial lift of 2m in medium rock and dense medium rock requiring blasting
Earth work Excavation in Hard rock by Chiseling and stacking and trimming to Proper Shape Were blasting is prohibited etc., complete.
P.C.C.1:3:6, using 20 mm HB metal for tower foundation concrete with out form work including cost of all materials, shuttering labour, curing , lead, lift, etc., complete.
Transporting & Setting of Stub and Cleats including Templates with correct level and required alignment including transporting of Stub,cleats and templates to site assembling, dismantling the templates, transport form Location to Location and re-assembling the same including cost of all materials, labour, lead, lift etc., complete.
GR Tower
KSR Tower
LSR Tower
P.C.C. 1:2 :4 using 20 mm HB metal for tower foudation (frustum) concrete including cost of cement and all materials, labour, curring , lead, lift, Vibration, with formwork charges etc., complete.
Providing Steel Reinforcement MS/RTS rods for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, labour charges for cutting, straightening bending as per type design drawing, placing aligning and typing properly with all leads and lift as per standard specification, etc., complete.
Refilling with excavated earth other than sand (6") layers well consolidation watering etc. as per specification and making plat form around tower legs including all labour, lead, lift, etc. complete.
Plastering with CM 1:3, 12mm thick including cost of shutering charges all materials lead lift etc complete.
Transporting of excess earth excavated and disposing them with in a lorry lead of 1 KM including lead, lift labour etc complete.
Transporting erection of Tower including sorting of tower parts at site, erection of Tower and tightening for final checking including all lead lift labour etc., complete including charges for rectification of tower parts if any including T & Ps all labour lead ,lift etc., complete.UNDER LC
Tack welding of bolts and nuts in the newly erected towers up to bottom cross arm level including of three Nos of tack weld for each bolts& nuts including hire charges of welding mechine,cost for welding rods,transporting charges, painting with cold galvanizing and tightening of bolts wherever necessary including all cost of materials,labour, lead,lift.,transporting hire charges etc complete.
Paying out rough sagging tensioning of 3 Nos ACSR zebra conductor for clipping providing trussels at required intervels for paving out the conductor, providing vibration dampers at tension location giving jumber connection including major, minor Tools and plants, all labour lead, lift etc., as per standard specification complete.UNDER LC
Erection of OPGW cable (48 fibre) with all accessories including testing and commissioning charges etc. complete.UNDER LC
BoQ_Ver3.0
Specification No: CE/TP-II/TRY/C-103/2025-26
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (II ) - (Supply of Materials) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Supply of GI tower/extension parts/DP structures/ X arm including stub & cleat in accordance with boards design as per approved drawing and BOM as detailed in this specification including cost of all materials ,labour, transport,lead, lift etc complete ..
a) Mild steel
Supplying of hot dip Galvanising & bolt & nuts,stepbolt with various sizes of required length,Spring Washers as per relevant latest IS Specification including cost of Transport charges and all lead,lift,etc, complete as as per approved drawing and BOM as detailed in this specification
Supply of Zeebra Conductor as per IS specifications and standards
Supply of OPGW cable (48 fibre) with accessories including all materials and all labour charges etc. complete.
Supply of Disc insulatores conforming to latest issue of IS specifications
a) 90 KN Insulator Ordinary
b) 120 KN Insulator
Supply of hardwares as conforming to latest issue of IS specifications suitable for Zeebra conductor
a) Single tension fittings
b) Single suspension fittings
c) Double Tension fittings
Supply of hardwares & Conductor accessores as conforming to latest issue of IS specifications suitable for Zeebra conductor
a) SB Dambers
b) Aluminium Earthbond
c) Preformed armour rod
d) Midspan joint
e) Repair sleeve
f) "Eye " Bolt
g) D' shackle
Supply of Indicators as conforming to latest issue of IS specifications
a) Phase plate
b) Number Plate
c) Danger Board
BoQ_Ver3.0
Specification No: CE/TP-II/TRY/C-102/2025-26
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (III ) - (Cost towards Retrieved materials) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Dismantling the existing Kundah conductor as is where is condition including Labour,lead,lift etc., complete
Dismantling of OPGW cable (24 fibre) with accessories as is where is condition including Labour,lead,lift etc., complete.
Dismantling the existing tower as is where is codition including labour,lead,lift, etc., complete.
Dismantling of Single Tension 14 units insulator wih fittings as is where is condition including labour,lead,lift etc., complete
Dismantling of Single Suspension 13 units insulator wih fittings as is where is condition including labour,lead,lift etc., complete
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
Tendernotice_2.pdf
PDF • 0.74 MB
BOQ_755565.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid