Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.3 CrAccepted-Finance | ₹2.3 Cr | 1 | Accepted-Finance Accept |
| 2 | 2₹2.4 Cr+₹3.7 L (1.60%)Accepted-Finance | ₹2.4 Cr+₹3.7 L (1.60%) | 2 | Accepted-Finance Accept |
| 3 | 3₹2.4 Cr+₹5.0 L (2.13%)Accepted-Finance | ₹2.4 Cr+₹5.0 L (2.13%) | 3 | Accepted-Finance Accept |
Tender Value
₹2.3 Cr
EMD Value
₹4.7 L
Closing Date
26 May 2022, 11:00 amClosed
Deputy Conservator of Forest (HQ), UT, Chandigarh
Forest and Wildlife Department, 2nd Floor, Paryavaran Bhawan, Madhya Marg, Sector 19B, Chandigarh
Plantation, maintenance of plantation, watch and water etc
2022_CHD_65798_1
FOR/2022/543/09.05.2022
Open Tender
Composite Works
Item Rate
365 days
Chandigarh
As per tender document
7 documents required · 7 mandatory
₹0
₹4.7 L
15 Jun 2022
10 May 2022
26 May 2022
10 May 2022
26 May 2022
10 May 2022
10 May 2022 - 26 May 2022
Amount
Item with Detailed Specifications
Plantation of live hedge i.e.Arundo donex rhizomes along the bank of Nathewala main choe in Ambika beats, Nathewala Block, Nepli Range during 2022-23
Plantation of live hedge i.e.Arundo donex rhizomes along the bank of Nathewala main choe in Pipalanwali beats, Nathewala Block, Nepli Range during 2022-23
Plantation of live hedge i.e.Arundo donex rhizomes along the bank of Nathewala main choe in Tootanwali beats, Nathewala Block, Nepli Range during 2022-23
Opening of Nathewala main choe bed at various mandering point to avoid bank cutting in Tootan wali beats, Nathewala Block, Nepli Range during 2022-23
Watering to new plantation in Tootanwali beat, Nathewala Block, Nepli Range, during 2022-23
Watering to last two year old plantation in Tootanwali beat, Nathewala block, Nepli Range 2022-23
Watering to new plantation in Ambika & Piplanwali beat, Nathewala Block, Nepli Range 2022-23
Watering to last two year old plantation in Ambika & Piplanwali beat, Nathewala Block, Nepli Range 2022-23
Plantation and patch sowing work on hill top in Tootanwali beat, Nathewala Block, Nepli Range during 2022-23
Plantation and patch sowing work on hill top in Ambika and Piplanwali beat, Nathewala Block, Nepli Range during 2022-23
Vigilant duty in Ambika Piplanwali and Tootanwali beat ,Nathewala Block, Nepli Range during 2022-23
Maintenance of last two years old plantation on hill top in Ambika and Piplanwali beat ,Nathewala Block, Nepli Range during 2022-23
Maintenance of last two years old plantation on hill top in Tootanwali beat ,Nathewala Block, Nepli Range during 2022-23
Suppressing of lantana in Tootanwali Beat, Nathewala Block, Nepli Range during 2022-23
Vigilant duty during night time in Tootanwali, piplanwali and Ambika beat, Nathewala Block, Nepli Range during 2022-23
5th year maintenance of fruit bearing plants to create babitat for wildlife , piplanwali beat in ,Nathewala block, Nepli Range during 2022-23
Removal of Alluvium of Kheda wala dam no.-1 to retain the water for wildlife in ambika beat, Nathewala Block, Nepli Range, during 2022-23
Opening of Nathewala main choe bed at various mandering point to avoid bank cutting in Ambika and Piplanwali beat, Nathewala block, Nepli Range 2022-23
Clearance and maintenance of approach ways to silt retention dams at various points in Ambika &Piplanwali Beat, Nathewala Block, Nepli Range during 2022-23
Clearance and maintenance of approach ways to silt retention dams at various Points in Tootanwali Beats, Nathewala Block, Nepli Range during 2022-23
Maintenance of Road in Ambika &Piplanwali Beat, Nathewala Block, Nepli Range during 2022-23
Maintenance of Road in Tootanwali Beats, Nathewala Block, Nepli Range during 2022-23
Maintenance of Tracking path in Tootanwali Beats, Nathewala Block, Nepli Range during 2022-23
Clearance and Dressing of fire line in Tootanwali Beats, Nathewala Block, Nepli Range during 2022-23
Clearance and Dressing of fire line in Ambika and Piplanwali Beats, Nathewala Block, Nepli Range during 2022-23
Removal of alluvium of dam no.1 Tarkhanwala choe to retain the water for wildlife in Tootanwala Beats, Nathewala Block, Nepli Range during 2022-23
Construction of Grade stabilizer to control the soil erosion retain the silt and to control the speed of water main choe in Tootanwali beats, Nathewala Block, Nepli Range during 2022-23
Construction of Grade stabilizer to control the soil erosion retain the silt and to control the speed of water main choe in Piplanwali beat, Nathewala Block, Nepli Range 2022-23
Construction of Revetment main choe in Tootanwali beat, Nathewala Block, Nepli Range 2022-23
Construction of Revetment main choe in Ambika beat, Nathewala Block, Nepli Range 2022-23
Removal of harmful weeds i.e. Parthenium , aakash bel etc.in Ambika and Piplanwali beat, Nathewala Block, Nepli Range during 2022-23
Removal of harmful weeds i.e. Parthenium , aakash bel etc .in Tootanwali beat, Nathewala Block, Nepli Range during 2022-23
8th year maintenance of fruit bearing plants to create babitat for wildlife , piplanwali beat in ,Nathewala block, Nepli Range during 2022-23
Removal of Alluvium of dam no.5 bolian wala side choe to retain the water wildlife in Tootanwali beat, Nathewala Block, Nepli Range during 2022-23
Construction of Grade stabilizer to control the soil erosion retain the silt and to control the speed of water main choe in Piplanwali beat, Nathewala Block, Nepli Range 2022-23
SURINDER SINGH AND COMPANY
ABDUL GAFUR AND COMPANY
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .