Loading…
Loading…
Tender Value
₹11.5 L
EMD Value
₹22,900
Closing Date
5 May 2026, 3:30 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TEL WORKS
6 conditions · 4 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Item listed under Schedule Item No. NS-02 and NS-04 should be approved from the Trusted Telecom Portal before the supply of routers and switches as per Railway Board Circular No. 12/2023 vide letter No. 2023/Tele Dev/Trusted Sources dt. 11.10.2023
Ajmer Division- Provision of S&T Associated work in C/W provision of a shunting neck connected with line No. 6 and an engine holding line connected with ART line at RPZ end of UDZ station (Telecom items)"
SNT-AII-04-2026-27
SNT-AII-04-2026-27
Open
Works - General
180 Days
Ajmer, Rajasthan
₹0
₹22,900
5 May 2026
10 Apr 2026
21 Apr 2026
60 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 7,89,252.01 | ||
| — | 50.00 | — | — | ||
| Supply of Medium class GI pipes 100 mm dia(4.5 mm thickness) as per IS 1239 ( Part 1 ) : 2004 with coupling on culverts bridges as per Drg.No.CSTE/NWR/SOR/06 to 12 or at any other locations as decided by Site Engineer. It includes supply of all material required for fixing arrangement. Contractor will also supply flexible/corrugated HDPE pipe at the end of GI pipe to protect the cables from sharp edges and sudden bends. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Supply. | — | — | — | 38,033 | |
| — | 50.00 | — | — | ||
| Fixing of Medium class GI pipes 100 mm dia(4.5 mm thickness) as per IS 1239 ( Part 1 ) : 2004 with coupling on culverts bridges as per Drg.No.CSTE/NWR/SOR/06 to 12 or at any other locations as decided by Site Engineer. It includes installation of all material required for fixing arrangement. Contractor will install flexible/corrugated HDPE pipe at the end of GI pipe along with any masonry work(if required) to protect the cables from sharp edges and sudden bends. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after installation. | — | — | — | 9,508.5 | |
| — | 15.00 | — | — | ||
| Supply of Thermo shrink Universal Jointing kit for Quad Cable (for straight joints) as per RDSO spec IRS/TC-77/2012 revision 3 With latest Amd. Inspection: RDSO Inspection Charges: Borne by Railways Payment Terms: 100% after Supply | — | — | — | 32,230.95 | |
| — | 10.00 | — | — | ||
| Jointing of 4 / 6 quad /Signaling cable with Heat Shrinkable straight through Jointing Kit. All the material required for the work are to be arranged by contractor himself at his own cost except Thermo shrinkable Joint Kit/Rapid Joint kit. After jointing the cable through test such as insulation test, continuity cable losses etc. to be carried out jointly with Railway Engineer. If any defect or any damage is observed during jointing, the contactor has to redo the joint free of cost. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution | — | — | — | 11,574.5 | |
| — | 360.00 | — | — | ||
| Excavation of cable trench as per cable route plan, 1.2 Mtr. deep and of 0.3 Mtr. to 0.6 Mtr. wide at bottom as per RDSO sketch No. SDO/CABLE LAYING/003 or latest alongside the track in normal (all type) soil/strata, conforming to distances as per cable route plan and refilling. This work includes clearing of route from bushes etc, covering of cable laid in trench by loose soil for a layer of 50mm thickness approximately before covering by bricks. The work shall be done as per the extant practice on North Western Railway and instructions of Railway Engineer at site. In case 1.2m depth of trench is not achievable due to site conditions, specific approval of JA grade officer will be required for each site where trench depth of 1.2m is not possible. Without the approval of JA Grade officer, no payment for trenching will be made for trench depth less than 1.2m. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution( Unit is Cubic Meter) | — | — | — | 98,740.8 | |
| — | 2000.00 | — | — | ||
| Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes/ Trunking. This also includes laying of cables in track crossings & road crossings. Item includes provision of labels of coloured plastic adhesive tapes or any other identifiable material on each cable to give the cable number at each Gantry Post/hectometer post.(Cables will be meggered before and after its laying by contractor under supervision of Railway Representative and he will submit the meggering report of each testing). Length of the cable laid includes the length of the cable coiled for termination purposes. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution(unit is RM running meter) | — | — | — | 18,200 | |
| — | 2.00 | — | — | ||
| Supply of basic material to construct unit maintenance free earth as per RDSO Specs. No RDSO/SPN/197/2008 or latest and conforming to RDSO Drg.No.SDO/ RDSO/E&B/001 dtd.19.09.08 . It consist of following: (a) Copper bonded steel electrode of 3.0 m long, 17.2 mm dia with copper bonding thickness of minimum macrons and UL listed and marked = 1 no. (b) Earth enhancement material supplied in sealed bags of minimum 10 kg = 3 nos. © Copper strip of 150x25x6 mm, to terminate earth rod = 1 no. (d) Copper strip of 300x25x6 mm (MEEB) = 1 no. (e) Copper strip of 150x25x6mm (SEEB) = 1 no. (ii) Supply of 35 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting main earth electrode to MEEB in the equipment room in duplicate.(minimum 10 meter) (iii) Supply of 16 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting MEEB to SEEB and SPD to MEEB (minimum 10 meter ) (iv) Supply of 10 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting various equipments to SEEB (v) Supply of copper lug sleeve for 3/16 cable Inspection: RDSO Inspection Charges:Borne by Railways Payment Terms: 100% after Supply. | — | — | — | 35,061.46 | |
| — | 2.00 | — | — | ||
| Installation of Unit Maintenance Free Earth as supplied under item no. 13.3 of Chapter 13 of SOR . It includes ( i ) Digging the earth to the required depth. (ii) Insertion of electrode. (iii) Filling of earth enhancing compound (Approx.30 Kg) (iv) Provision of exothermic weld connections to copper tape of 25 mm x 6 mm x 150 mm to the earth electrodes. All material tools and features required for weld will be arranged by contractor. (v) This also includes CC cover 1.5 ft x 1.5 ft. 1 ft wall thickness 2 inch with cover 3 inch thickness. Cables 35 Sq mm/ 16 Sq mm/10 sq mm for connecting earth to busbar, busbar to busbar and busbars to various equipments. Earth electrode of 17.20 mm dia and 3.00 meter long high tensile low carbon steel circular rods molecularly bonded with copper and outer surface (minimum copper bonding thickness of 250 micrones to made requirement of under writer's laboratories (UL) 467-2007 or latest. Copper strips of 150 mm x 25 mm x 6 mm to be welded with each earth electrode, copper strips of 300 mm x 25 mm x 6 mm for main equip- potential busbar, copper strips of 150 mm x 25 mm x 6 mm sub equip- potential busbar in relay room, power room and panel room. GI strip 25 mm x 2 mm for ring formation of earth pits Earth enhancement material in bags for each Earth Electrode. Inspection chamber of site 300 mm x 300 mm x 300 mm (Inside dimension) of approximate 50 mm thick with pulling hooks to cover the earth pits. Note: The installation of this item shall be carried out by the contractor as per RDSO Specn.No.RDSO/SPN/ 197/2008 or latest and conforming to RDSO Drg.No.S DO/RDSO/E&B/001 or latest. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after execution and testing. | — | — | — | 15,723.36 | |
| — | 5.00 | — | — | ||
| Supply of VF Transformers (2T/3T), 1120/470 Ohms as per RDSO Spec. No. IRS: TC- 76-2000 with Amnd. 1 or latest for emergency joints in 6-Quad Cable. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Supply. | — | — | — | 4,615.65 | |
| — | 5.00 | — | — | ||
| Supply, preparation, splicing and installation of straight joint for 24 fibers along with enclosures with heat shrinkable splice protection sleeve as per TEC Specn.G/OJC-02/01 March- 99 or latest. Splice losses in no case should be more than 0.1 dB. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution | — | — | — | 63,761 | |
| — | 2.00 | — | — | ||
| Supply of Pre-lubricated HDPE duct, 40 mm OD, 33 ID as per RDSO specification No. RDSO/SPN/TC/45/2013 Rev. 2.0 or latest. The item also includes supply of all the accessories of HDPE duct like end caps, collars, bends, couplers etc. Inspection: (i) RDSO/RITES if value of item in work more than 5 lakhs (ii) Consignee subject to procurement from RDSO approved vendors if value of whole item in work less than 5 lakhs as per extant instructions by Railway Board. Inspection Charges: (i)Borne by Railways (ii) None Payment Terms: 100% on Supply | — | — | — | 96,626.52 | |
| — | 2.00 | — | — | ||
| Laying of Pre-lubricated HDPE duct, 40 mm OD, 33 ID as per RDSO specification No. RDSO/SPN/TC/45/2013 Rev. 2.0 or latest. The item also includes installation of all the accessories of HDPE duct like end caps, collars, bends, couplers etc. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution. | — | — | — | 24,156.62 | |
| — | 2.00 | — | — | ||
| Blowing/drawing of OFC cables in the HDPE duct along with all the protective work as per instructions of engineer incharge at site. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution. | — | — | — | 21,609.54 | |
| — | 2.00 | — | — | ||
| Construction of brick chamber of optical fibre cable straight through joint as per Drg. No. CSTE/NWR/ SOR/23. It also includes supply and provision of all the material required for this item like bricks, sand, cement etc. The cement and sand should be in ratio 1:6. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution. | — | — | — | 10,527.74 | |
| — | 50.00 | — | — | ||
| Supply of RCC cable route marker engraved and painted on both side along the route at every 50 meter and route diversion as per Drg. No 4014/00/CC4 or latest/ Stone marker. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Supply | — | — | — | 16,434 | |
| — | 300.00 | — | — | ||
| Supply of 10 pair switchboard indoor copper cable 0.6 dia as per specification IRS:TC:24:91. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Supply. | — | — | — | 14,763 | |
| — | 2.00 | — | — | ||
| Supply, installation and complete wiring of Optical fiber cable termination box for 24 fibers complete with base housing, base mountings with fixing arrangement etc & splicing of fibers with low loss of pigtail cables as per detailed specification mentioned in respective tender documents. Two pairs of fibers shall be derived from either side of OFC cable at every OFC cable hut provided at wayside stations through pigtails with FC/PC connectors and remaining fibers on either side will be made through by splicing. At OFC terminal stations/MW repeater stations, all fibers shall be derived from either side and to be terminated in OFC termination box through pig tails and FC/PC connector. The OFC termination box to be supplied as per TEC No. G/FTB 01-02 March- 99 or latest. Splice losses in no case should be more than 0.1 dB. Necessary 0 dB connectors should be provided by contractor in OFC termination box. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution. | — | — | — | 48,726.36 | |
| — | 10.00 | — | — | ||
| Supply of 20 Pairs Krone type D.P. box as per Tech spec, make Hensel or superior. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Supply. | — | — | — | 19,630.8 | |
| — | 10.00 | — | — | ||
| Fixing and wiring of 20 Pairs Krone type D.P. box as per Tech spec, make Hensel or superior. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after execution. | — | — | — | 4,907.7 | |
| — | 1.00 | — | — | ||
| Supply of 19" covered rack of size 2035 X 600 X 600 mm (Approx) as per Drg.No.CSTE NWR SOR 24. The rake shall be complete with all fittings for housing SDH equipments, PDMUX, DDF, MDF using krone modules and other accessories like cable and connectors, runway ladders, locking arrangement, completely wired and equipped with IPM for all equipped channels. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after supply. | — | — | — | 29,373.13 | |
| — | 1.00 | — | — | ||
| Installation and complete indoor wiring of 19" covered rack of size 2035 X 600 X 600 mm (Approx) as per Drg.No.CSTE NWR SOR 24. The rake shall be complete with all fittings for housing SDH equipments, PDMUX, DDF, MDF using krone modules and other accessories like cable and connectors, runway ladders, locking arrangement, completely wired and equipped with IPM for all equipped channels. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after execution. | — | — | — | 7,343.28 | |
| — | 612.00 | — | — | ||
| Supply of UTP CAT-6 cable in a roll of 305 meter and make Siemen/ Systemax / Panduit/ Tyco/ Krone/ AMP. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Supply. | — | — | — | 11,468.88 | |
| — | 1.00 | — | — | ||
| Shifting and installation of control and other telecom equipments like control phone, magneto phone, auto phone, VHF sets, VF Repeaters etc from old station building to new station building as per instructions of site engineer. All the material required for fixing and installation will be supplied by the contractor. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after execution. | — | — | — | 8,912.22 | |
| — | 100.00 | — | — | ||
| Fixing & wiring (Laying) of DLP trunk 80X50mm with required all changeable internal/external angle, changeable flat angle, flat junction. Clips, joint for cover, end cap etc. make Legrand or superior. Cable will be supplied by Railway and all other fixing material will be supplied by contractor. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after execution. | — | — | — | 16,369 | |
| — | 200.00 | — | — | ||
| Supply of DLP trunk 80X50mm with required all changeable internal/external angle, changeable flat angle, flat junction. Clips, joint for cover, end cap etc. make Legrand or superior. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Supply. | — | — | — | 1,30,954 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tender Document
ATTACHMENT
SNT-AII-04-2026-27AjmerDivision-ProvisionofSTAssociatedworkinCWprovisionofashunting.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .