Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC HANUMANT PURAM OPP GOVT ITI LAKSAR ROAD KANKHAL HARIDWAR | HARIDWAR | UTTARAKHAND | 247656 | ₹1.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.4 Cr+₹2.6 L (1.99%)Rejected-AOC BIKANER ROAD SURATGARH 335804 | GANGANAGAR | RAJASTHAN | 335804 | ₹1.4 Cr+₹2.6 L (1.99%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.4 Cr+₹7.6 L (5.68%)Rejected-AOC 179 GURU ROAD PATEL NAGAR PATEL NAGAR DEHRADUN UTTARAKHAND 248001 | DEHRADUN | UTTARAKHAND | 248001 | ₹1.4 Cr+₹7.6 L (5.68%) | L3 | Rejected-AOC L3 |
| 4 | L4₹1.5 Cr+₹19.6 L (14.7%)Rejected-AOC CB 180 2ND FLOOR RING ROAD NARAINA VIHAR SOUTH WEST DELHI DELHI 110028 | NEW DELHI | DELHI | 110028 | ₹1.5 Cr+₹19.6 L (14.7%) | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | Kamal Electrical L3 | RICHARDSON ENGINEERS L1 | middha enterprises L2 | bijlee constructions pvt ltd L4 |
|---|---|---|---|---|---|---|---|
| 1.00Annual Running Contract for Operation & Maintenance of Electrical Distribution System and 11 KV Switching Station in PTPS colony/Plant, Panipat. | |||||||
| 1.01 | Charges of Annual Running Contract for Operation & Maintenance of Electrical Distribution System and 11 KV Switching Station in PTPS colony, Panipat as per scope of work of the work order with minimum wages (Per Month). | 24 | Per Month | 5,68,550 ₹1,36,45,200 | 5,38,000 ₹1,29,12,000 Lowest | 5,65,000 ₹1,35,60,000 | 6,05,000 ₹1,45,20,000 |
| 1.02 | Providing end-joints (HT) in the 11KV cables of size 3 core x 185 mm2. | 30 | Nos | 325 ₹9,750 | 50 ₹1,500 Lowest | - | 1,500 ₹45,000 |
| 1.03 | Dismantlement of damaged poles and removal of fitting from the poles | 100 | Nos | 450 ₹45,000 Lowest | 700 ₹70,000 | - | 700 ₹70,000 |
| 1.04 | Erection of 09 Mtr,/11 mtrs PCC Pole | 120 | Nos | 800 ₹96,000 Lowest | 850 ₹1,02,000 | - | 800 ₹96,000 Lowest |
| 1.05 | Providing New stay wire to the poles | 70 | Nos | 345 ₹24,150 Lowest | 350 ₹24,500 | - | 900 ₹63,000 |
| 1.06 | Dismantlement of old conductor of loose spans and sagging ogf new conductors/old conductor of healthly condition . The replacement of defective insulators/D scrap etc if required | 220 | Nos | 460 ₹1,01,200 | 400 ₹88,000 Lowest | - | 600 ₹1,32,000 |
| 1.07 | Painting of street light poles | 300 | Nos | 125 ₹37,500 | 100 ₹30,000 Lowest | - | 400 ₹1,20,000 |
| 1.08 | Providing Straight through LT Joint for joint of LT cable of size 3C/3.5CX185/150mm2 | 30 | Nos | 285 ₹8,550 | 50 ₹1,500 Lowest | - | 1,500 ₹45,000 |
| 1.09 | Shifting of the poles from the site store to the site and damaged poles from site to site store | 100 | Nos | 450 ₹45,000 | 350 ₹35,000 Lowest | - | 400 ₹40,000 |
Tender Value
₹1.3 Cr
EMD Value
₹2.7 L
Closing Date
13 May 2026, 1:00 pmClosed
Virender Singh
CE PTPS Panipat
Annual Running Contract for Operation and Maintenance of Electrical Distribution System and 11 KV Switching Station in PTPS colony/Plant, Panipat.
2026_HBC_518560_1
202635C4B3CD B171 48FC A3F6 F7E57440B805713PGC
Open Tender
Civil Works
Works
730 days
ASSAN KHURD
As per CBD
2 documents required · 2 mandatory
₹1,180
Yes
₹2.7 L
Yes
29 Jun 2026
29 Apr 2026
15 May 2026
29 Apr 2026
13 May 2026
29 Apr 2026
29 Apr 2026 - 6 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Annual Running Contract for Operation & Maintenance of Electrical Distribution System and 11 KV Switching Station in PTPS colony/Plant, Panipat. | |||||
| 1.01 | Charges of Annual Running Contract for Operation & Maintenance of Electrical Distribution System and 11 KV Switching Station in PTPS colony, Panipat as per scope of work of the work order with minimum wages (Per Month). | 24 | Per Month | 1.25 | ₹30 |
| 1.02 | Providing end-joints (HT) in the 11KV cables of size 3 core x 185 mm2. | 30 | Nos | - | - |
| 1.03 | Dismantlement of damaged poles and removal of fitting from the poles | 100 | Nos | 100 | ₹10,000 |
| 1.04 | Erection of 09 Mtr,/11 mtrs PCC Pole | 120 | Nos | 53 | ₹6,360 |
| 1.05 | Providing New stay wire to the poles | 70 | Nos | 10 | ₹700 |
| 1.06 | Dismantlement of old conductor of loose spans and sagging ogf new conductors/old conductor of healthly condition . The replacement of defective insulators/D scrap etc if required | 220 | Nos | - | - |
| 1.07 | Painting of street light poles | 300 | Nos | - | - |
| 1.08 | Providing Straight through LT Joint for joint of LT cable of size 3C/3.5CX185/150mm2 | 30 | Nos | - | - |
| 1.09 | Shifting of the poles from the site store to the site and damaged poles from site to site store | 100 | Nos | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_597449.xls
BOQ • 0.31 MB
Corrigendum11KV.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .