Loading…
Loading…
Tender Value
₹16.0 L
EMD Value
₹16,100
Closing Date
14 Jul 2026, 6:00 pm7d left
Executive Engineering UPSIC KANPUR
Executive Engineering UPSIC KANPUR
Construction of c.c road From Yogendra rai house to shri muniram house in village palliya mahmudpur,badrwn,Mau
2026_MSME_1167254_1
655/EE4/26-27
Open Tender
Civil Works
120 days
MAU
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Executive Engineering UPSIC KANPUR
₹16,100
7 Jul 2026
7 Jul 2026
15 Jul 2026
7 Jul 2026
14 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (Lime clay or sand ) including Lift upto 1.5m &leed upto 30.00mtr. Including watering and ramming ofexcavated earth in to the trenches or in to the space between the building and the sides of foundation trenches or in to the plinth as dircted by the engineer in charge up to a distance of 30.00mtr. from the foundation trenches as per SI. No.251. | 45.9 | cum | 115 | ₹5,278.5 |
| 2 | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement in proportion of 12:6: 1 in foundation and under floors, including supply of all materials, labour and T &P etc. required for proper completion of the work.as per S1. NO. 273 | 66.09 | cum | 3,250 | ₹2,14,792.5 |
| 3 | First class brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials,labour and t&p etc required for proper completion ofthe work.
as per S1. NO. 305(b) | 64.77 | sqm | 4,980 | ₹3,22,554.6 |
| 4 | 12 mm thick plaster over brick work with cement mortar consisting of one part cement & four parts of fine sand of 1.25 F.M. including supply of all material, labour and T &P etc required for proper completion of the work as per SI NO 584 . | 170 | sqm | 160 | ₹27,200 |
| 5 | Providing and laying 125 micron thin polythene to act as separation layer | 1,041.4 | sqm | 33.4 | ₹34,782.76 |
| 6 | Providing and laying of Cement Concreet in 1:2:4 with C:Cs:and stone grit. As per SI 279(B). | 147.6 | cum | 6,990 | ₹10,31,724 |
| 7 | Making construction / contraction joint with filling bitumin 40%, asbestas 5% and coarse sand including all for proper completion of the work | 369 | Nos. | 37.5 | ₹13,837.5 |
| 8 | Earth filling with carted earth from 1 km. | 193.61 | cum | 176.6 | ₹34,191.53 |
| 9 | P/F of sign board including all complete of work . | 1 | job | 5,000 | ₹5,000 |
| 10 | Deduction of Competitive Efficiency @ 5% | 1 | Less | 84,468.39 | ₹84,468.39 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
TermsandConditionTenderCivilWorks.pdf
Tender Documents • 0.05 MB
BOQ_2189244.xls
BOQ • 0.65 MB
Download all tender documents and submit your bid