Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.0 LAdmitted-Finance BARMER | RAJASTHAN | 344001 | L1 | Admitted-Finance | ||
| 2 | L2₹10.3 L+₹30,000 (3.00%)Admitted-Finance 0 AHRAULI MOD PUKHRAYAN PUKHRAYAN AHRAULI MOD KANPUR DEHAT KANPUR DEHAT UTTAR PRADESH 209111 | KANPUR DEHAT | UTTAR PRADESH | 209111 | L2 | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
27 Jun 2026, 1:00 pmClosed
prashasak gram panchayat balera
prashasak gram panchayat balera
khel maidan ki chardiwari nirman karya ra u ma school balera
2026_PRD_569784_1
gp balera/2026-27/52-57 date 20/06/2026
Open Tender
Civil Works
Percentage
balera
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
khel maidan ki chardiwari nirman karya ra u ma sch
₹20,000
Yes
14 Jul 2026
20 Jun 2026
27 Jun 2026
20 Jun 2026
27 Jun 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | ( work) | - | - | - | - |
| - | Digging soil up to 1.5 depths in the foundation, ditch, barn, crushing the bottom, pouring water, grooming the armpits, removing the carved soil, refilling the empty places with soil after filling the foundation and removing the remaining soil for a distance of 50 meters | 101.81 | cum | 178.46 | ₹18,169.01 |
| 3 | Cement concrete foundation or floor 40 mm. The stone of the renowned measure is to be poured into the limestone ballast /brick soil, cement-sand masala in the ratio of 1 cement : 4 sand : 8 ballast and cutting, including lowland. | 20.36 | cum | 3,241 | ₹65,986.76 |
| 4 | In the foundation and chair, they are made of stone in cement-gravel spices, including the edge of the side and the lowlands etc. In CM 1:6. | 84.51 | cum | 3,416.01 | ₹2,88,687.01 |
| 5 | Brick masonary for superstructure. | - | cum | 3,782.75 | - |
| 6 | 12 mm Thick Cement plaster is mixed with cement-gravel in the ratio of 1:6 on the wall and crushing the joints and regularly for 14 days. | - | sqm | 147.18 | - |
| 7 | Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade including all scaffolding Two or more coats on new work including prepartion of base with primer, putty etc complete in all respect. | - | sqm | 72 | - |
| 8 | The function of iron in the grill/gate etc., including cutting, plating and applying flat corneas, t and chainls etc.63 | - | kg | 101.68 | - |
| 9 | contigencu | - | no. | 1,492 | - |
| 10 | phtography and name | - | no | 2,000 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.83 MB
BOQ_1013891.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .