Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹2.3 L
EMD Value
₹4,620
Closing Date
5 Nov 2026, 11:00 am
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer Left River Works Division
Executive Engineer Left River Works Division
Construction of lane from the house of Abdul Aziz Dar to the house of Mohammad Tahir at dar mohalla old barzulla.
2026_HAUDD_328139_7
NIET 45 e-tendering /2025-26 LRWD
Open Tender
Civil Works
Percentage
60 days
Srinagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Yes
FA/CAO Municipal Account 0216010200000007
₹4,620
Yes
14 Oct 2026
14 Oct 2026
6 Nov 2026
15 Oct 2026
5 Nov 2026
15 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of labourers for clearance of site etc. | 2 | NO | 553 | ₹1,106 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: (1 meter from cutting edge ) All kinds of soil | 9.4 | CUM | 479.3 | ₹4,505.42 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 4.43 | CUM | 5,202.9 | ₹23,048.85 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 6.4 | CUM | 5,733.6 | ₹36,695.04 |
| 5 | P/F of PVC pipe/fittings line heavy duty (Prince made). (Grade-B) with fittings complete job.
A) 100 mm dia | 16.4 | RM | 365 | ₹5,986 |
| 6 | B) 250 mm dia | 31.4 | RM | 1,199 | ₹37,648.6 |
| 7 | Lifting / disposal of excavated/ dismantelled unserviceable material from site of work to dumping site by mechinical transport including loading,unloading beyond municipal limits. as per direction of Engineer-in-charge: | 9.43 | CUM | 350 | ₹3,300.5 |
| 8 | Providing and laying stone soling/ hand packed (above 75 mm) including all sorts of carriages by all means of transport upto site of work complete job . | 7.48 | CUM | 900 | ₹6,732 |
| 9 | Form work centering / shuttering including Strutting, Propping etc and removal of form work for:
(a) Foudation, footings, basis, coloums etc | 9.48 | SQM | 286.35 | ₹2,714.6 |
| 10 | 12mm thick cement plaster 1:4 mix (1 Cement :4 sand ) | 6.69 | SQM | 283.8 | ₹1,898.62 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_1110807.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .