Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹43.8 L+₹3.4 L (8.36%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | OLPANDCO L2 | Sri Shanmuga Enterprises L1 |
|---|---|---|---|---|---|
| 1.00Upgradation of the road from Neruppur Ramagondahalli BT road to Kanikkadu Four road 0/0 - 1/050 H/O Ramagondahalli | |||||
| 2.00 | Clearing the scrub jungles including the cutting the scrubs and removing away from site etc complete | 1,638 | Sqm | 6 ₹9,828 | 5 ₹8,190 Lowest |
| 3.00Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10m initial lift of 2m in Hard gravel soil including cost and conveyance of all and labour charges etc., complete as per SS 20A | |||||
| 4.00 | Km 0/0-1/050 | 531 | Cum | 145 ₹76,995 | 130 ₹69,030 Lowest |
| 5.00Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, SHOULDERS | |||||
| 6.00 | Km 0/0-1/0 | 135 | Cum | 950 ₹1,28,250 | 795 ₹1,07,325 Lowest |
| 7.00 | Km 1/0-1/050 | 6.75 | Cum | 950 ₹6,412.5 | 805 ₹5,433.75 Lowest |
| 8.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 9.00 | Km 0/0-1/0 | 571.69 | Cum | 2,500 ₹14,29,225 | 2,246 ₹12,84,015.74 Lowest |
| 10.00 | Km 1/0-1/050 | 28.13 | Cum | 2,500 ₹70,325 | 2,246 ₹63,179.98 Lowest |
Tender Value
₹41.1 L
EMD Value
₹42,000
Closing Date
16 May 2025, 3:00 pmClosed
The Addl. Collector (Dev) / Project Director, DRDA
DRDA, Dharmapuri
Upgradation of the road from Neruppur Ramagondahalli BT road to Kanikkadu Four road 0/0 - 1/050 H/O Ramagondahalli
2025_RDTN_553241_1
Roc.No.736/2025/R2 MGSMT P13
Open Tender
Civil Works - Roads
Item Rate
120 days
DRDA
Can be seen in the tender documents
2 documents required · 2 mandatory
₹0
₹42,000
DRDA, Dharmapuri
2 Sept 2025
1 May 2025
16 May 2025
1 May 2025
16 May 2025
7 May 2025
7 May 2025
Amount
Upgradation of the road from Neruppur Ramagondahalli BT road to Kanikkadu Four road 0/0 - 1/050 H/O Ramagondahalli
Clearing the scrub jungles including the cutting the scrubs and removing away from site etc complete
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10m initial lift of 2m in Hard gravel soil including cost and conveyance of all and labour charges etc., complete as per SS 20A
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, SHOULDERS
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg of Bituminous Emulsion SS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and lyaing TACK COAT ove the WMM surface (treated with primer) using 2.50 KG of Bituminous Emulsion RS1 for 10 sqm. including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Road marking with hot applied thermoplastic compound with Reflectorising glass beads on bituminous surface etc.,
Providing Wearing Coat
Constrution of un-reinforced, dowel jointed at expansion and constrction joint only, plain cement concrete pavement thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade)
Provision for Bitumen Pad
Provision for Sign Board
Provision for Kilometer Stone
Provision for Hectometer Stone
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
OLPANDCO (BID ID -1340704)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .