Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.2 L+₹8,743.78 (8.04%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Gst linked Bank account Details not uploaded |
Tender Value
₹1.5 L
EMD Value
₹7,350
Closing Date
7 Sept 2026, 6:55 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
CO of Culvert near House of Zaffar Ahamd Khan and P Wall near Land of Gh Hassan Mir at Lachanpora Khag Budgam
2026_RDPR_323063_2
NIT_62_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
KHAG
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹7,350
2 Nov 2026
2 Sept 2026
7 Sept 2026
2 Sept 2026
7 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Trench excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m 2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 2.47 | Cum | 479.3 | ₹1,183.87 |
| 2 | Providing/Laying Stone soling Nallah/Plum hand packed on level in foundation trenches excluding carriages of Stones. | 5.7 | Cum | 937.4 | ₹5,343.18 |
| 3 | P/L in position cement concrete of M10 Grade including curing but excluding the cost of centering and shuttering. All work upto plinth level (1 Cement :3 F.A.(Natural/M-Sand) :6 C.A. ) with 20mm aggregate | 13.27 | Cum | 5,733.6 | ₹76,084.87 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. | 30.66 | Sqm | 286.35 | ₹8,779.49 |
| 5 | Reinforced cement concrete 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. | 1.76 | Cum | 9,395.7 | ₹16,536.43 |
| 6 | Providin & Assembling Steel reinforcement (HYSD Bars) for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 211 | Kg | 115 | ₹24,265 |
| 7 | carriage of sand for an avg lead of 25 km | 5.97 | Cum | 465.14 | ₹2,776.89 |
| 8 | carriage of stone aggregate for an avg lead of 15 km | 11.94 | Cum | 344.49 | ₹4,113.21 |
| 9 | carriage of soiling upto 10km | 5.7 | Cum | 328.31 | ₹1,871.37 |
| 10 | Add provision for cost of photographs, Citizen Information Board, head load 200 meters and clearance of site & other unforseen items (to be paid as per actual) | 1 | Job | 6,000 | ₹6,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_1086210.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .