Tender Value
₹3.0 L
EMD Value
₹3,800
Closing Date
6 Sept 2024, 6:00 pmClosed
General Manager
Office of The General Manager Bankola Area, PIN-713363
Lifting of burnt Tran-switch Unit from 20L 9ED Substation at RVII A seam to surface and transportation of repaired Tran switch Unit from Surface Workshop to 20L 9ED Substation at RVII A seam at Shyamsundarpur Colliery.
2024_ECL_315736_1
ECL/GM/BA/E TENDER/24-25/EnM/150 Dt 23.08.2024
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Shyamsundarpur Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹3,800
9 Oct 2024
23 Aug 2024
7 Sept 2024
23 Aug 2024
6 Sept 2024
23 Aug 2024
23 Aug 2024 - 27 Aug 2024
Amount
Item Description/ Heading
Collection of Trolleys and dismantling breaker and TSU and then loading both of them on trolleys
Transporting the TSUI and its breaker from 201/9ED to 18L/9ED by manully pulling over floor (approx, distance 70 meter) after crossing 191. Belt at 9ED by dismantling belt and again fitting it.
Loading the TSU and its breaker over trackline and then transporting them to Pit
Bottom of Pit No.-3 over trackline with haulage Lifting of TSU and its breaker from Pit Bottom to Surface by dismantling of cageand again fitting of cage after lifting.
Collection of Trolleys and loading of TSU and its breaker on trolleys and then lifting it to Pit Top.
Lowering of TSU and its breaker from Pit Top to Pit Bottom by dismantling of cage and again fitting of cage after lowering.
Transporting the TSU and its breaker from Pit Bottom to 18L/9ED over trackline with haulage
Transporting the TSU and its breaker from 181/9ED to 201/9ED by manully pulling over floor (approx. distance 70 meter) after crossing 19L Belt at 9ED by dismantling belt and again fitting it.
Unloading of TSU and its breaker at 201/9ED Substation and then assembling the TSU and its Breaker.
Total impact of GST for the purpose of CTC
PRASHANTA KABIRAJ
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .