| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | LI₹34.8 LAccepted-AOC | LI | Accepted-AOC L1 | |
| 2 | L2₹35.9 LRejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹36.3 L
EMD Value
₹72,500
Closing Date
9 Jan 2019, 5:00 pmClosed
SE ICC MAHOBA
Office of the SE ICC, BAJARIYA MAHOBA
Construction of V.R.B. at km. 20.350 of Kabrai Main Canal(LOT-9)
2019_UPIDC_289784_9
05/SE/2018-19
Open Tender
Civil Works
Item Rate
180 days
MAHOBA
AS PER NIT
2 documents required · 2 mandatory
₹2,354
EE IRRIGATION CONSTRUCTION DIVISION
₹72,500
Yes
21 Oct 2021
3 Jan 2019
15 Jan 2019
3 Jan 2019
9 Jan 2019
3 Jan 2019
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work.
Excavation of foundation in all type of strata excluding hard rock including disposal with all leads, lifts & T&P etc for proper completion of job as per direction of Engineer-in-Charge , including all tax like Income tax, Labour cess etc but excluding G.S.T.
Supplying and laying sand in inverted filter including cost of material, labour and T&P etc with all leads & lifts for proper completion of job, including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying A40 M10 Cement concrete by mechanical mixing and mechanical vibrating. Cement consumption of 4.30 bags per cum including cost of all material, labour and T&P all leads and lifts for proper completion of job as per direction of Engineer-in-charge, including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying A20 M15 Reinforced Cement concrete by mechanical mixing and mechanical vibrating. Cement consumption of 6.10 bags per cum including cost of all material but excluding cost of steel, labour and T&P all leads and lifts for proper completion of job as per direction of Engineer-in-charge, including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying A20 M20 Reinforced Cement concrete by mechanical mixing and mechanical vibrating. Cement consumption of 7.90 bags per cum including cost of all material but excluding cost of steel, labour and T&P all leads and lifts for proper completion of job as per direction of Engineer-in-charge, including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying R.C.C. A-20 M-25 by mechanical mixing and mechanical vibration cement consumption of 7.70 bags per cum including cost ofall material, labour & T&P etc. all lead & lifts complete, including all tax like Income tax, Labour cess etc but excluding G.S.T.
Providing and laying steel for reinforcement including cost of Steel, Cutting, bending, placing in position, binding with G.I. wire, & welding etc. including cost of all material, labour, T&P and all leads and lifts for proper completion of job as per direction of Engineer-in-charge, including all tax like Income tax, Labour cess etc but excluding G.S.T.
Providing and fixing Centering and shuttering for R.C.C. work including cost of all material, labour, T&P and all leads and lifts for proper completion of job as per direction of Engineer-in-charge, including all tax like Income tax, Labour cess etc but excluding G.S.T.
Supplying and fixing joint filter board 20 mm thick including cost of material, labour and T&P etc with all leads & lifts for proper completion of job. As per direction of Engineer-in-charge, including all tax like Income tax, Labour cess etc but excluding G.S.T.
Supply and fixing wheel guard including cost of all material, labour and T&P etc for proper completion of job, including all tax like Income tax, Labour cess etc but excluding G.S.T.
Earth work in filling in making embankment and cutting canal cross section after mechanical compaction including dressing and watering with all leads, lifts and T&P etc for proper completion of job as per direction of Engineer-in-charge, including all tax like Income tax, Labour cess etc but excluding G.S.T.
M/S BHUMI ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .