Tender Value
₹10.4 Cr
EMD Value
₹6.7 L
Closing Date
10 Mar 2026, 3:00 pmClosed
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
WORKS
14 conditions · 3 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less, where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-I, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Technical Eligibility Criteria: (a)The tenderer must have successfully completed or substantially completed any of the following (by any Government organizations) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Note for Technical Eligibility Criteria: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turn over of Rs.500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered atleast 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit alongwith work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate. Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender.
Similar Nature of work : Any Civil Engineering work involving 'Earthwork' or 'Blanketing' or 'Subgrade' in 'Railway Embankment or 'Highway Construction' or 'Runway/Taxiway system of Airport' or in Dam or in Canal and CC/RCC work in any structure
50 conditions · 3 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The original Bank Guarantee for Bid Security should be delivered in person to the Deputy Chief Engineer/Construction/V/LKO, O/o CPM-C, Northern Railway, Lucknow before closing date of submission of bids (i.e. excluding the last date of submission of bids).
Tenderers are compulsorily required to upload Certificate as per Annexure M (A), as the case may be, as stipulated in Clause 2.2.6 of Special Tender Conditions and instruction to tenderers without which the offer will be considered incomplete and will be rejected summarily.
The tenderers must necessarily upload/submit the legal documents, pertaining to the constitution of their Concern as applicable, along with the tender, as enumerate in clause 2.4 of spl tender condition and instruction to tenderers of tender document.
Tenderer shall certify that they are not black listed or debarred by Railways or any other Ministry/ Department/PSU (Public Sector undertaking) of the Govt. of India/State Govt. from participation in tenders/contract on the date of opening of bids either in their individual capacity or as a member of the JV firm in which they were/are members.
Tender must upload ANNEXURE-Q regarding Employment/Partnership etc. of Retired Railway Employees as the case may be, as stipulated in Clause 2.2.12 of Special Tender Conditions and instruction to tenderers
Submit your bank details i.e. Name of the Bank along with Bank Branch Code, Account Number, IFSC Code as per Annexure-J (Real Time Gross Saving (RTGS)/National Electronic Fund Transfer (NEFT) (Model Mandate Form)) of tender document
The tenders confirms the option of taking payment through LC arrangement. The tenderer affirms having read over and agreed to the terms and conditions of the LC option.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderer may please note that offers received without requisite/mandatory documents as mentioned above, will be considered as invalid tender and for which contractor shall have no claim on Railway.
The tenderer shall visit the site of work and acquaint himself/themselves with the conditions of work viz. approach roads and accessibility, nature of soil/rock, availability of materials, electric power, water for work and drinking purposes, site for labour camps, stores, godowns, extent of lead/lift in work, availability of skilled and unskilled labour etc. that may be encountered in the course of execution of work. In short, he/they should familiarize himself/themselves fully with the conditions obtaining at site and FURNISH A CERTIFICATE TO THIS EFFECT, in the Proforma appended as Annexure-C of Tender Document.
Tenderers are compulsorily required to fill up/submit requisite details in prescribed Performa of Annexure C to G,I,J and Annexure-L as per tender document without which the offer may be considered as incomplete and be liable to be rejected.
The tenderer's may note that the Railway reserves its right to either accept or reject any Bid/s without assigning any reasons whatsoever and tenderer s shall have no claim s on this account.
The time, date and venue of opening of Financial Bids shall be notified to the successful tenderer s after evaluation of Technical cum Commercial Bids. The same shall be opened on due date in the presence of tenderers / their representatives as may wish to attend the same
The tenderers shall quote the rates of one single % age "Above/Below/At par" on the total amount comprising basic value of entire Schedule of Chapters of USSOR-2021 plus escalation (Schedule "A"), one single % age "Above / Below / At par" over entire schedule of DSR-2021 items (Schedule B), one single % age "Above / Below / At par" over entire schedule of DSR-2020 (Horticulture items) (Schedule C) and one single % age "Above / Below / At par" over entire schedule of Non schedule Items (Schedule "D") in the attached Schedule of Items, Rates and Quantities (Packet-II, Financial Bid). Every possible fluctuation, in the rate of labour, material and general commodities, and other possibilities of each and every kind which may affect the rates, should be considered and kept in view before quoting the rates and no claim on this account shall be entertained by the Railway under any circumstances except the price escalation payable as per price variation clause, if any, provided separately in the tender documents.
As per Income Tax Act, Tax will be deducted for sums paid for carrying out the work under this contract. In case of supply contract for ballast, deduction of 2% (Two percent) Income tax will be made for the sums paid for labour portion only (i.e., loading, unloading, stacking, measurement and laying etc.). 1% labour cess shall be deducted from each RA bill to be deposited with concerned labour Commissioner/State Govt.
TAXES
The contractor shall be governed by the Taxes applicable at the place of actual execution of work as per clause 23.0 of Special Tender Conditions and instruction to tenderers
Only Technical cum Commercial bid will be opened first. Thereafter all Technical cum Commercial offers will be evaluated for eligibility on the basis of the documents submitted by the tenderers regarding constitution of firm, technical and financial eligibility. The shortlisted firms will thereafter be informed of the date, time and venue of the opening of their Financial bids. Financial bids of these shortlisted tenderers will be opened as scheduled and evaluated accordingly.
If on verification of credentials, at the evaluation stage, it is found that the tenderer has submitted forged/fake documents in support of his offer, his Bid Security shall be forfeited besides banning of business for a period of upto two year.
IF THE TENDERER S DELIBERATELY GIVES WRONG INFORMATION/ CREDENTIALS/DOCUMENTS IN HIS/THEIR TENDERS AND THEREBY CREATE S CIRCUMSTANCES FOR ACCEPTANCE OF HIS/THEIR TENDER, RAILWAY RESERVES THE RIGHT TO TERMINATE THE CONTRACT AT ANY STAGE, BESIDES, BANNING OF BUSINESS FOR A PERIOD OF UPTO TWO YEAR.
The contractors operations and proceedings in connection with the works shall at all times be conducted during the continuance of contract in accordance with the laws, ordinance, rules and regulations for the time being in force and t h e contractor s h a ll further observe a n d comply with t h e bye-laws and regulations of the Govt. of India, State Govt. and of Municipal other authorities having jurisdiction in connection with the works or site over operations such as these are carried out by the contractor/s and shall give all notice required by such bye-laws and regulations. The Hospital and medical regulations in force for the time being shall also be complied with by the contractor/s and his workmen.
The contractor shall be responsible for the observance of the rules and regulations under the mines act and mineral rules and Indian Metallurgical rules and regulations of State/Central Govt. concerned as amended from time to time.
Contractor shall at all times keep the railway administration indemnified against all penalties that may be imposed by the Govt. of India or State Govt. for infringements or any of the clauses of the mines act and rules made there under in respect of quarries from which the ballast for these works is procured.
Care for submission of offer
Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual inspection of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the rates he enters in the tender forms are adequate and all inclusive to accord with the provisions in Clause-37 of the Standard General Conditions of Contract for the completion of works to the entire satisfaction of the Engineer.
Tenderers will examine the various provisions of The Central Goods and Services Tax Act, 2017(CGST)/Integrated Goods and Services Tax Act, 2017(IGST)/Union Territory Goods and Services Tax Act, 2017(UTGST)/ respective state's State Goods and Services Tax Act (SGST) also, as notified by Central/State Govt & as amended from time to time and applicable taxes before bidding. Tenderer's will ensure that full benefit of Input Tax Credit (ITC) likely to be availed by them is duly considered while quoting rates.
The successful tenderer who is liable to be registered under CGST/IGST/UTGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/UTGST/SGST Act to railway immediately after the award of contract, without which no payment shall be released to the contractor. The contractor shall be responsible for deposition of applicable GST to the concerned authority.
In case the successful tenderer is not liable to be registered under CGST/IGST/UTGST/SGST Act, the railway shall deduct the applicable GST from his/their bills under reverse charge mechanism (RCM) and deposit the same to the concerned authority.
Earth work, Blanketing in formation, Extension of Minor bridge, Construction of Station Building and Platforms alongwith other associated ancillary works in connection with work of ''Conversion of Barsethi Halt Station in to Crossing Station between Mariauh-Janghai section." of Lucknow Division on Northern Railway under Dy CE-C-V-LKO.
16-Tender-Dy-CE-C-V-LKO
16-Tender-Dy-CE-C-V-LKO
Open
Works - General
12 Months
Lucknow, Uttar Pradesh
₹0
₹6.7 L
10 Mar 2026
17 Feb 2026
24 Feb 2026
261 items across 25 schedules · ₹10,71,46,200.66 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, platforms with contractor's own earth conforming Soil Quality Class SQ1/SQ2/SQ3, after preparation of foundations as applicable, benching in existing banks wherever required, spreading in layers with motor grader, bringing the moisture content OMC, mechanical compaction to specified density and dressing of bank to final profile as per RDSO Specifications: RDSO/2020/GE: IRS-0004 with latest correction slips. Note: Foundation preparation, Benching including additional earthwork on account of this, wherever required, shall be paid extra under relevant schedule item for benching. Payment for Earthwork under this item shall b e made based on the cross section measurements calculated (i) with original ground profile of existing bank based initial ground levels before doing benching and (ii) final profile of the bank worked with final levels as per prevailing guidelines. | etc. to to 1) 2) on out | — | — | — | |
| 1 | Using Soil Class SQ1 | cum | 18000.00 | 319.97 | 57,59,460 |
| Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge the cutting(s) including all lifts, ascent, descent, loading, unloading, bailing pumping out water, if required, clearance site and all other works incidental thereto completing the work as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest updated correction slips and the satisfaction of the Engineer-in-Charge. Note: (i) All usable earth arising from spoils shall be led into bank formation Unusable spoils shall be dumped / stacked away from toe of embankment. (ii) All hard rock /and boulders not fit for filling will stacked by the contractor and will property of the Railways. (iii)Cut trees shall be property of Railways and to be deposited in the railway godown unless specified otherwise in the Conditions of Contract. | of of & of for to cut and be be | — | — | — | |
| 2 | In all conditions and classifications of except rock | soil cum | 1700.00 | 107.35 | 1,82,495 |
| 3 | Mechanical manufacturing of blanketing material by using only hard and durable stone crushed in mechanical crusher different gradations, wet mixing of the same in designed proportion in Pug mill or wet plant to have uniform gradation including incidental transportation, laying over finished formation in uniform layer(s) with motor grader, compaction with suitable vibratory roller to specified density finishing to correct profile, complete as RDSO Specification No. RDSO/2020/GE: 0004 with latest correction slips. Note: This item shall be used only when entire constituent of blanketing material mechanically manufactured by crushing hard and durable stone into desired gradation of designed proportion. | cum to mix all and per IRS- is of | 3315.00 | 2,706.13 | 89,70,820.95 |
| Supplying, laying Non-woven Needle Punched and Mechanically or Thermally bonded type Geotextile for use Separator/Filtration for Railway formation per RDSO Specification RDSO/2018/GE:IRS-0004 - Part I made Polypropylene / Polyethylene / Polyamide combination there of having apparent opening size of less than or equal to microns and elongation at failure more than 50% in both directions including transportation labour, lead & lift complete directed by Engineer in-charge. | as as No. of or 85 as | — | — | — | |
| 4 | On top of subgrade or prepared subgrade before laying blanketing layer with minimum strengths in Grab test, Trapezoidal Tear test and Puncture test of 700N, 250 N and 1800 N respectively. | Sqm | 6290.00 | 248.62 | 15,63,819.8 |
| Schedule total | ₹1,64,76,595.75 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tenderdoc.pdf
ATTACHMENT
WEBNOTICE.pdf
ATTACHMENT
BSYESP_1.pdf
ATTACHMENT
BSYStationBuilding_1.pdf
ATTACHMENT
BSYPassengerAmenities_1.pdf bsy passenger amenities
ATTACHMENT
BSYPassengerAmenities_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .