Tender Value
₹38.7 L
EMD Value
₹77,500
Closing Date
22 Jun 2026, 6:00 pm
CWE Patiala
HQ COMMANDER WORKS ENGINEER BLDG No 26 NEW LALBAGH PATIALA 147001 Contact - 01712200082
PROVN OF ROAD WIDENING FROM AIRAWAT COACHING ACADEMY (ACA) TO VAIDYA ENCLAVE GATE UNDER GE (N) PATIALA
2026_MES_768807_1
CWE/PAT/T-15/2026-27
Open Tender
Civil Works
120 days
GE (N) Patiala
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
₹77,500
30 May 2026
30 May 2026
24 Jun 2026
30 May 2026
22 Jun 2026
15 Jun 2026
30 May 2026 - 10 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Dismantling of Bricks (laid flat or on edge) or brick tiles in floors, channels, kerbs, aprons etc laid dry or laid dry and pointed complete all as specified and directed by Engineer-in-charge. | 65 | X Sqm | 1.25 | ₹81.25 | itemH1Code1 |
| 2 | Material and labour for excavating over areas , in soft loose soil n exc 1.5 m deep and getting out outside of MD land including any royalty and removing the same from any distance to work site and filling the soil on both side of road berms including watering rolling and consolidating complete all as specified and as directed by Engineer-in-charge. | 390 | Cum | 1 | ₹390 | itemH1Code2 |
| 3 | Material and labour for providing,laying and compacting 150 mm thick (compacted thickness) Granular Sub Base Course (GSB) grading as per Grade I as specified Table 400-1 of MaRTH specifications for Road and Bridge works, 2013, in a single layer over compacted subgrade with natural sand, crushed gravel, crushed stone, crushed slag or combination thereof as per the grading required The materials are mechanically mixed, spread and leveling on the subgrade manually, and rolling with vibratory roller of capacity 80-100 KN static weight for achieving required compaction density of atleast 98% of the Maximum Dry Density. Consolidating to required gradient and camber complete all as specified and directed with finished surface tolerances as per Table 900-1 of MaRTH specifications for Road and Bridge works 2013 complete all as specified and as directed by Engineer-in-charge. Note:- In case of width of road widening is lesser, contractor has to arrange roller of lesser width for compaction. | 128 | X Sqm | 100 | ₹12,800 | itemH1Code3 |
| 4 | Material and labour for providing, laying and compacting 150 mm thick (compacted thickness ) WMM laid in two layers of 75 mm each thick (compacted thickness) Wet Mix Macadam (WMM) grading as per table 400-13 of MaRTH specifications for Road and Bridge works 2013 manufactured in WMM plant material comprising of clean, crushed, graded aggregate and granular material premixed with water to a dense mass, spreading manually and rolling with vibratory roller of capacity 80-1OOKN static weight and consolidating to required gradient and camber complete all as specified and directed by Engineer-in-charge Notes:-(i) The finished surface tolerances shall be as per Table 900-1 of MaRTH specifications for Road and Bridge works 2013. (II) In case of width of road widening is lesser, contractor has to arrange roller of lesser width for compaction. | 128 | X Sqm | 53 | ₹6,784 | itemH1Code4 |
| 5 | Material and labour for preparing of unsurfaced wet mix macadam by brushing with wire brushed for removing caked mud etc sweeping with brooms and finally fanning to cleaned surface with gunny bags to remove all loose dirt etc from surface and applying evenly a premix /tack coat with bituminous primer (using paving bitumen VG-10) @10.00 Kg per ten Sqm complete all as specified and as directed by Engineer-in-charge. | 128 | X Sqm | 10 | ₹1,280 | itemH1Code5 |
| 6 | Material and labour for providing and laying Premix Bituminous macadam of (consolidated thickness 75 mm or less) using paving bitumen binder of grade VG-30 and binder content 4% by weight of total mix, Mixing of aggregates and VG-30 bitumen in electronic operated 100-120 TPH batch type hot mix plant, transporting the hot mix from HMP to work site by tippers and laying with hydrostatic paver finisher (Paver shall not be compulsory in case of patch work using B.M.) and as per approved mix, rolled & compacted to required camber and gradient with 8 to 12 tonne smooth wheeled, vibratory and tandem roller, complete all as per Clause 504 MoRTH (5th Rev) specification complete all as specified and as directed by Engr-in-Charge. Notes :
1.The contractor shall quote the rate against Item considering 4% VG-30 bitumen content. Job Mix Formula as per CI. No. 505.3.3 of MORTH (5th Rev) for BM shall be worked out from Thapar Insti. of Engg & Tech Patiala/ PEC Chandigarh/ Command Test Lab / Maharaja Ranjit Singh Tech University Bathinda for obtaining optimum binder content (OBC) by the Contractor without any financial effect to the Dept and same be submitted to Garrison Engineer for approval. Any variation in binder content on minus side shall be adjusted @ Rs 50/kg of binder and no adjustment shall be made on plus side.
2. The BM shall be covered with top layer/wearing course within in a maximum of 48 hours. If ther is to be any delay, by the contractor the course shall be covered by seal coat to the requirement of Clause 512 of MORTH (5th Rev) before opening to the traffic. The seal coat in such cases shall be considered incidental to the work and shall not be paid for separately. | 63 | Cum | 10 | ₹630 | itemH1Code6 |
| 7 | M&L for preparing of black top surface by brushing with wire brushed for removing caked mud etc sweeping with brooms and finally fanning to cleaned surface with gunny bags to remove all loose dirt etc from surface, Applying evenly a premix /tack coat with bituminous primer (using paving bitumen VG-10 )@ 5.0 Kg per ten Sqm complete all as specified and as directed by Engineer-in-charge. | 405 | X Sqm | 22 | ₹8,910 | itemH1Code7 |
| 8 | Material and labour for providing and laying Premix Bituminous semi dense asphaltic concrete 30mm consolidated thickness with 5.5% binder (paving bitumen of grade VG-30) content by weight of total mix and mixing the crushed aggregates of grading 2 with VG-30 bitumen in electronic operated 100-120 TPH batch type hot mix plant, transporting the hot mix from HMP to work site by tippers and laying with hyrdostatic paver finisher and as per approved mix and rolled & compacted to required camber and gradient with 8 to 12 tonne smooth wheeled, vibratory and tandem roller, complete all as per Clause 507 MORTH (5th Rev) specification and as specified and as directed by Engineer-in-Charge. | 405 | X Sqm | 10 | ₹4,050 | itemH1Code8 |
| 8.02 | (iv) The vintage of the T&P (Hot mix plant/road roller i.e. vibratory roller, static roller, hydraulic roller/paver) should not be more than 10 years except the tippers and shall be approved by GE before date of commencement of the work.
(v) The certificate wrt the capacity of the hot mix plant (HMP) shall be 100-120 TPH and the plant shall be electronic operated, batch type and location be intimated and the same shall be approved by GE before date of commencement of the work.
(vi) The distance of the HMP shall not be more than 100 KM from the Mil Stn Patiala, Detail of plant to be submitted to GE for approval before date of commencement of the work.
(vii) The calibration certificate for HMP shall be submitted by the contractor for approval of GE before date of commencement of the work which should not be more than 6 months old.
(viii) The minimum 2 Road roller each (vibrating and static road roller) are required at site before commencement of the work on the ground and the same shall be approved by GE before date of commencement of the work.
(ix) Aggregates retrieved from dismantling of existing pavement shall not be used in top carpetting layer. | - | - | - | - | itemH1Code10 |
| 9 | Supply and fixing Road cat eyes of size 100mm x 100mm x 20 mm meeting with ASTM and MORTH STANDARD WITH YELLOW reflectors, yellow body colour and two saides lens all as specified and directed. The stud shall be fixed to the road surface using adhesive and zinc plated nails conforming to IS as per manufacturer recommendations and as approved by GE complete all as specified and as directed by Engineer-in-charge. | 150 | Each | 22 | ₹3,300 | itemH1Code11 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
Tender152627.pdf
Tender Documents • 0.69 MB
BOQ_860955.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid