Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.3 L
EMD Value
₹6,465
Closing Date
22 Oct 2026, 6:55 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER REW BUDGAM
rdd complex budgam
Construction of lane and protection bund near land of sikandar hussain and manzoor ahmad at Kalbal construction Lane with tiles near house ofMohd Yasin Joo others at Ichgam B alongwith renovation of Lane near house ofAbid Hussain at Ichgam B
2026_RDPR_327630_6
NIT_91_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
BUDGAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
EXECUTIVE ENGINEER REW BUDGAM
₹6,465
Yes
10 Oct 2026
10 Oct 2026
23 Oct 2026
10 Oct 2026
22 Oct 2026
10 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soil, with disposal lead upto 1 m from cutting edge | 8.28 | Cum | 479.3 | ₹3,968.6 |
| 2 | Providing/Laying Stone soling Nallah/Plum hand packed on level in foundation trenches including carriages of Stones | 5.38 | Cum | 1,105.35 | ₹5,946.78 |
| 3 | Centring and shuttering including removal of form work | 16.15 | Sqm | 286.35 | ₹4,624.55 |
| 4 | P/L in position cement concrete of 1:2:4 Nominal mix including curing but excluding the cost of centering and shuttering. All work upto plinth level (1 Cement :2 F.A.(Natural/M-Sand) :4 C.A. ) with 20mm aggregate | 5.29 | Cum | 6,591.25 | ₹34,867.71 |
| 5 | P/L in position cement concrete of 1:4:8 Nominal mix including curing but excluding the cost of centering and shuttering. All work upto plinth level (1 Cement :4 F.A.(Natural/M-Sand) :8 C.A. ) with 20mm aggregate | 4.46 | Cum | 5,202.9 | ₹23,204.93 |
| 6 | Providing and laying 50mm thick factory made cement concrete colour Interlocking paver block tiles of M-30 grade made by block making Machine with strong vibratory compaction of approved size, design and shape, laid in required colour and pattern over and including 40mm thick compacted bed of coarse stone dust, filling the joints with fine stone dust etc, all complete as per directions of Engineer in charge (in carriage of all materials) | 50.19 | Sqm | 795 | ₹39,901.05 |
| 7 | P/L cement concrete flooring (1:2:4) mix finished with a floating coat of neat cement slurry but excluding the cost of nosing of steps etc complete 50 mm thick with 20mm nominal size stone aggregate | 16.74 | Sqm | 562 | ₹9,407.88 |
| 8 | Carriage of Stone aggregate for 20 km | 9.56 | Cum | 409.94 | ₹3,919.03 |
| 9 | Carriage of Sand for 10 km | 4.78 | Cum | 409.94 | ₹1,959.51 |
| 10 | Add provisions for signboard, Photographes ,carriage of cement,tilesand other unforseen items. | 1 | No | 1,492.96 | ₹1,492.96 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_1108451.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .