| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹7.1 L+₹1,809.15 (0.26%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S A.S. CONSTRUCTION L2 | Sushil Kumar L1 |
|---|---|---|---|---|---|
| 1.00Silt clearance and scraping work on the Kurawali Dy from km 0.000 to km 06.000 (work using Poclain machine) and from km. 10.000 to km. 18.356. | |||||
| 1.01 | Scrapping internal section of existing channel i.e. Bed & Slope with silt upto 5 cm. | 19,872.44 | Sqm | 4.15 ₹82,470.63 | 4.1 ₹81,477 Lowest |
| 1.02 | Silt clearance/trench digging lift up to 1.5m and lead up to 6m ,including cost of driver/assistant driver, POL, maintenance of machine,contractor profit, taxes etc but excluding leveling,dressing & compaction. B) by pocklin/equivalent capacity 60 cum/hour ie. 2280/60(Rs. 2280 per hours) | 12,396 | Cum | 37.8 ₹4,68,568.8 | 37.75 ₹4,67,949 Lowest |
| 1.03 | Silt clearance/trench digging lift up to 1.5m and lead up to 6m ,including cost of driver/assistant driver, POL, maintenance of machine,contractor profit, taxes etc .and also including leveling,dressing & compaction. a) by hydraulic excavator/JCB/equivalent capacity 25cum/hour ie. 1000/25(Rs. 1000per hours) | 3,914.44 | Cum | 39.5 ₹1,54,620.38 | 39.45 ₹1,54,424.66 Lowest |
Tender Value
Refer Docs
EMD Value
₹72,000
Closing Date
5 Oct 2026, 10:00 amClosed
Executive Engineer
Office Executive Engineer Irrigation Division Etah
scraping work on the kurawali dy from km. 0.000 to km. 06.000 ( work using poclain machine) and from km. 10.000 To km. 18.356
2026_UPIDC_1188942_2
02/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
30 days
District mipuri
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹72,000
12 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Silt clearance and scraping work on the Kurawali Dy from km 0.000 to km 06.000 (work using Poclain machine) and from km. 10.000 to km. 18.356. | |||||
| 1.01 | Scrapping internal section of existing channel i.e. Bed & Slope with silt upto 5 cm. | 19,872.44 | Sqm | 1.25 | ₹24,840.55 |
| 1.02 | Silt clearance/trench digging lift up to 1.5m and lead up to 6m ,including cost of driver/assistant driver, POL, maintenance of machine,contractor profit, taxes etc but excluding leveling,dressing & compaction. B) by pocklin/equivalent capacity 60 cum/hour ie. 2280/60(Rs. 2280 per hours) | 12,396 | Cum | 2.25 | ₹27,891 |
| 1.03 | Silt clearance/trench digging lift up to 1.5m and lead up to 6m ,including cost of driver/assistant driver, POL, maintenance of machine,contractor profit, taxes etc .and also including leveling,dressing & compaction. a) by hydraulic excavator/JCB/equivalent capacity 25cum/hour ie. 1000/25(Rs. 1000per hours) | 3,914.44 | Cum | 2.25 | ₹8,807.49 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_2244727.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .