| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC VILLAGE NAWADA SAIDPUR JALAL POST BHOOTPURI DISTRICT BIJNOR UTTAR PRADESH | BIJNOR | BIJNOR | UTTAR PRADESH | ₹7.6 L | L1 | Accepted-AOC Lowest I |
| 2 | L2₹7.8 LRejected-Finance | ₹7.8 L | L2 | Rejected-Finance Lowest II |
| 3 | L3₹8.0 LRejected-Finance 1098 BAZAR KHOHAL GORAKHPUR UTTAR PRADESH | ₹8.0 L | L3 | Rejected-Finance Lowest III |
| 4 | Rejected-Technical | - | - | Rejected-Technical Due to incomplete document as per tender condiction |
| Sl No | Description | Qty | Unit | M/S SHAKTI ASSOCIATES L1 | M/S AJAYPAL SINGH CONTRACTOR L2 | RAJENDRA SINGH L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork in foundation in ordinary soil including lift upto 1.50 m and lead upto 30 m i/c back filling, levelling, dressing etc complete rate per cum (By Mechanical Means) | 180 | Cum | 30 ₹5,400 | 65 ₹11,700 | 40 ₹7,200 |
| 2.00 | Supplying and Laying C.C work for 1:3:6 in foundation using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum. | 32 | Cum | 4,200 ₹1.3 L | 4,300 ₹1.4 L | 3,600 ₹1.2 L |
| 3.00 | Supplying and Laying C.C work for 1:2:4 using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum. | 5.1 | Cum | 5,000 ₹25,500 | 5,000 ₹25,500 | 4,700 ₹23,970 |
| 4.00 | Supplying and Placing R.C.C work 1:1.5:3 using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum. | 42 | Cum | 5,200 ₹2.2 L | 4,000 ₹1.7 L | 5,900 ₹2.5 L |
| 5.00 | Supply & Laying of reinforcement in R.C.C including Cutting, Bending, Binding and Placing etc. Including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge. | 1.6 | MT | 56,000 ₹89,600 | 63,125 ₹1.0 L | 63,125 ₹1.0 L |
| 6.00 | Supplying and laying Ordinary Centering & shuttering of Plywood or steel for RCC Work including T&P, Labour etc complete for proper completion of work | 190 | Sqm | 240 ₹45,600 | 650 ₹1.2 L | 340 ₹64,600 |
| 7.00 | Brick work (M-105 and Above) in 1:4 cement & sand mortar including cost of all Material, Labour, T&P etc complete. (Per Cum) | 50 | Cum | 4,600 ₹2.3 L | 4,000 ₹2 L | 4,600 ₹2.3 L |
| 8.00 | Cement Pointing (Struck deep) in 1:2 C:M on brick masonry i/c cost of all material, labour, T&P etc complete (Per SqM) | 90 | Sqm | 70 ₹6,300 | 90 ₹8,100 | 99 ₹8,910 |
Tender Value
₹9.6 L
EMD Value
₹20,000
Closing Date
25 Feb 2026, 12:00 pmClosed
Executive Engineer
EGCCD6 Najibabad
Construction of Drainage Crossing at Km. 1.700 and Km. 3.700 of Bakshanpur Distributary.
2026_UPIDC_1117767_8
07/EE/2025-26
Open Tender
Civil Works - Canal
30 days
Najibabad
Please refer tender documents
2 documents required · 2 mandatory
₹266
₹20,000
17 Mar 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
19 Feb 2026 - 25 Feb 2026
Earthwork in foundation in ordinary soil including lift upto 1.50 m and lead upto 30 m i/c back filling, levelling, dressing etc complete rate per cum (By Mechanical Means)
Supplying and Laying C.C work for 1:3:6 in foundation using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum.
Supplying and Laying C.C work for 1:2:4 using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum.
Supplying and Placing R.C.C work 1:1.5:3 using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum.
Supply & Laying of reinforcement in R.C.C including Cutting, Bending, Binding and Placing etc. Including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge.
Supplying and laying Ordinary Centering & shuttering of Plywood or steel for RCC Work including T&P, Labour etc complete for proper completion of work
Brick work (M-105 and Above) in 1:4 cement & sand mortar including cost of all Material, Labour, T&P etc complete. (Per Cum)
Cement Pointing (Struck deep) in 1:2 C:M on brick masonry i/c cost of all material, labour, T&P etc complete (Per SqM)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.36 MB
tn7lot8.pdf
Tender Documents • 1.40 MB
BOQ_2077257.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid