Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹57,800
Closing Date
4 Jan 2021, 4:00 pmClosed
Executive Engineer PWD
Executive Engineer PWD
Restoration of Damages Caused due toi Laying of OFC by JIO on Allahpir Link road,Dungus to Court Complex and Bus Stand to Qila Market by way of Providing and Laying of WBM Gr-II,WBM Gr-III,50mm thick BM ,25MM OGPC and Other allied Works.
2020_PWDJK_112113_3
e-NIT No. 94/2020-21 dated 19-12-2020
Open Tender
Civil Works
Item Rate
60 days
Poonch
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Yes
Executive Engineer PWD Poonch
₹57,800
Yes
13 Jan 2021
22 Dec 2020
5 Jan 2021
22 Dec 2020
4 Jan 2021
22 Dec 2020
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. ( not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan,including dressing of sides and ramming of bottom lift upto 1.5m,including getting out excavate earth and disposal of surplus excavated earth as dirested: All kinds of soil .
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering . All work up to plinth level with : 1:5:10 ( 1 cement :5 coarse sand :10 graded stone aggregate 40 mm nominal size ).
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering .All work up to plinth level with : 1:3:6 with ( 1 cement : 3 coarse sand :6 graded stone aggregate 20 mm nominal size) using 20% stones.
Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand:4graded stone aggregate 20mm nominal size) and curing complete
Centring and shuttering including strutting propping etc. and removal of form for :-
Foundations,footings, bases of columns etc for mass concrete
Providing and laying WBM-GR- II 150 mm thick with broken Nallah/Crusher stone aggregate of 63 to 45mm size including screening of 13.2 mm size and using good earth as binding material sorting, spreading to template and consolidation with Power Road Roller of 8-10 Tonne capacity including carriages, octroi, sale tax, service tax all lead and lift for complete job.
Providing and laying WBM-GR- III with broken Nallah /Crusher stone aggregate of 53 to 22.4mm size including screening of 11.2 mm size and usingcrusher dust as binding material sorting, spreading to template and consolidation with Power Road Roller of 8-10 Tonne capacity including carriages, octroi, sale tax, service tax all lead and lift for complete job .
Providing and laying bituminous macadam of 50mm average compacted thickness with bitumen of 80/100(VG-10) grade @ 3.5% (percentage by weight of total mix) on prepared surface with specified graded crushed stone aggregates for profile corrective base/binder course including loading of aggregate with F.E loader , hot mixing of stone aggregates in hot mix plant transporting the mixed material by tippers to paver and laying the mixed material with paver finisher fitte with electronic sensing device to the required level and grade and rolling with road rollers as per MORTH specifications and direction of Engineer-in-Charge to achieve the desire density and compaction including the cost of brooming , primer/tack coat , all leads/lifts , carriages , loading & unloading ( Complete job)
Providing,& laying open graded premix carpet of 25 mm average compacted thickness with bitumen of 80/100(VG-10) grade @ 5%(percentage by weight of total mix) on prepared surface with specified graded crushed stone aggregates for wearing course including loading of aggregate with F.E loader and hot mixing of bitumen with filler and stone aggregates in hot mix plant , transporting the mixed material by tippers to paver and laying the mixed material with mechanical paver finisher fitted with electronic sensing device to the required level and grade and rolling with road rollers as per MORTH specifications and direction of Engineer-in-Charge to achieve the desire density and compaction including the cost of brooming , primer/tack coat , all leads/lifts , carriages , loading & unloading ( Complete job)
Arvind kumar
M/S Vinod Kumar Misri
SHAZAD SHABNAM
ZAFFAR AHMED
Asif Iqbal
Ms Abdul Aziz Mir
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .