Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.9 LAccepted-Finance 2 222 B 10 PONMAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹4.9 L | 1 | Accepted-Finance Satisfied |
| 2 | 2₹5.1 LAccepted-Finance 3 140 H 1 PERIYAR STREET AMMAN NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹5.1 L | 2 | Accepted-Finance Satisfied |
| Sl No | Description | Qty | Unit | SS ENGINEERING CONTRACTOR L2 | PREETHI ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for loading and unloading of 300 NB M.S ERW pipe of size 6/12 meters length required for replacement of corroded/ eroded blow down pipe in the existing Hot water basin header on the eastern side of cooling tower-I from Ash handling pump house to Cooling tower-I and devolution of the removed corroded/ eroded pipe to central stores.(For loading & Unloading Crane will be supplied by TNPGCL at free of cost). | 48 | Mtrs | 500 ₹24,000 | 490 ₹23,520 |
| 2.00 | Hire charges for heavy machineries (Poclain vehicle) for cleaning the bushes, excavation of PCC concrete, soil to remove the 350NB pipe corroded/eroded pipe laid underground and after laying new pipe line the excavated soil, PCC concrete are to be leveled using the heavy machineries as like the area before excavation. | 5 | hours | 2,800 ₹14,000 | 2,600 ₹13,000 |
| 3.00 | Charges for providing & dismantling of Scaffolding & Platform arrangements required for dismantling of corroded/eroded 350 NB M.S ERW pipe and laying the pipe of size 300NB pipe in the eastern side in the existing hot water header pipe at 11 m height in Cooling Tower-I by using steel pipes.(Required scaffolding materials and its transportation to work spot from outside MTPS-I are under contractor scope). | 1 | No | 11,000 ₹11,000 | 10,000 ₹10,000 |
| 4.00 | Charges for dismantling of 350 NB worn-out MS ERW pipe from the existing pipe line by marking & cutting etc., | 48 | Mtrs | 475 ₹22,800 | 467 ₹22,416 |
| 5.00 | Charges for cutting, grinding, edge preparation, erection, laying, positioning and welding of 300NB MS ERW pipe line at 11 mtr height parallel to cooling tower wall & underground area along with supports which includes fabrication of supports using available MS angle.(300 NB MS ERW pipe will be supplied by TNPGCL). | 48 | Mtrs | 4,700 ₹2,25,600 | 4,600 ₹2,20,800 |
| 6.00 | Charges for Fabrication of required size of bend as per site condition using 300 NB MS ERW pipe by marking, cutting, edge preparation and welding, erection and welding with newly laid 300NB ERW pipe. | 6 | Nos | 13,700 ₹82,200 | 13,500 ₹81,000 |
| 7.00 | Charges for Fabrication of 350NB to 300NB reducer in the existing hot water blow down line at cooling tower-I, erection and welding with newly laid 300NB ERW pipe. | 1 | No | 5,500 ₹5,500 | 4,500 ₹4,500 |
| 8.00 | Charges for dismantling of corroded/eroded 80/100 NB dia MS pipe in RC pipe line & air release pipe line of cooling water pump stage-I | 15 | Mtrs | 400 ₹6,000 | 300 ₹4,500 |
| 9.00 | Charges for marking, cutting, grinding, edge preparation, erection & welding of 80/100 NB dia MS pipe in RC pipe line & air release pipe line of cooling water pump stage-I with necessary supports using MS angle. | 15 | Mtrs | 800 ₹12,000 | 700 ₹10,500 |
| 10.00 | Charges for Overhauling of 300 mm size 150 / 300 Class Gate valve in hot water blow down line in the eastern side of cooling tower-I by complete dismantling the valve, Lapping the valve disc & seat area renewal of spares , Gland Packing and rubber gasket and assembling.(Required Neoprene Rubber gasket is under contractor scope) | 1 | No | 11,000 ₹11,000 | 10,000 ₹10,000 |
Tender Value
Refer Docs
EMD Value
₹4,800
Closing Date
2 Feb 2026, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I M I CA CWS I Replacement of corroded and eroded blow down pipe line in cooling tower I and a portion of recirculation water pipe line in Cooling water pumps of stage I
2026_EB_644707_1
CE / MTPS-I / SE / M-I / CA /OT. 452 / 2025 - 26
Open Tender
Power/Energy Projects/Products
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹4,800
Yes
13 Feb 2026
19 Jan 2026
3 Feb 2026
19 Jan 2026
2 Feb 2026
19 Jan 2026
Charges for loading and unloading of 300 NB M.S ERW pipe of size 6/12 meters length required for replacement of corroded/ eroded blow down pipe in the existing Hot water basin header on the eastern side of cooling tower-I from Ash handling pump house to Cooling tower-I and devolution of the removed corroded/ eroded pipe to central stores.(For loading & Unloading Crane will be supplied by TNPGCL at free of cost).
Hire charges for heavy machineries (Poclain vehicle) for cleaning the bushes, excavation of PCC concrete, soil to remove the 350NB pipe corroded/eroded pipe laid underground and after laying new pipe line the excavated soil, PCC concrete are to be leveled using the heavy machineries as like the area before excavation.
Charges for providing & dismantling of Scaffolding & Platform arrangements required for dismantling of corroded/eroded 350 NB M.S ERW pipe and laying the pipe of size 300NB pipe in the eastern side in the existing hot water header pipe at 11 m height in Cooling Tower-I by using steel pipes.(Required scaffolding materials and its transportation to work spot from outside MTPS-I are under contractor scope).
Charges for dismantling of 350 NB worn-out MS ERW pipe from the existing pipe line by marking & cutting etc.,
Charges for cutting, grinding, edge preparation, erection, laying, positioning and welding of 300NB MS ERW pipe line at 11 mtr height parallel to cooling tower wall & underground area along with supports which includes fabrication of supports using available MS angle.(300 NB MS ERW pipe will be supplied by TNPGCL).
Charges for Fabrication of required size of bend as per site condition using 300 NB MS ERW pipe by marking, cutting, edge preparation and welding, erection and welding with newly laid 300NB ERW pipe.
Charges for Fabrication of 350NB to 300NB reducer in the existing hot water blow down line at cooling tower-I, erection and welding with newly laid 300NB ERW pipe.
Charges for dismantling of corroded/eroded 80/100 NB dia MS pipe in RC pipe line & air release pipe line of cooling water pump stage-I
Charges for marking, cutting, grinding, edge preparation, erection & welding of 80/100 NB dia MS pipe in RC pipe line & air release pipe line of cooling water pump stage-I with necessary supports using MS angle.
Charges for Overhauling of 300 mm size 150 / 300 Class Gate valve in hot water blow down line in the eastern side of cooling tower-I by complete dismantling the valve, Lapping the valve disc & seat area renewal of spares , Gland Packing and rubber gasket and assembling.(Required Neoprene Rubber gasket is under contractor scope)
Charges for cleaning, painting with one coat of rust convertor, one coat of epoxy red oxide primer and Two coats of epoxy sea green one over the other with proper intervals in the outer surface of the newly laid MS ERW pipe & RC line of cooling water pump stage-I.
Charges for wrapping, heating of tar sheet on the newly laid MS ERW pipe underground after cleaning the outer surface area of the pipe.
Cost of Rust Convertor for SL.No.11.
Cost of Epoxy Thinner for SL.No.11.
Cost of Epoxy red oxide primer for SL.No.11.
Cost of Epoxy Sea Green paint for SL.No.11.
Cost of bitumen tar sheet, Pypkote tape of 2mm thickness, 1m width as per IS10221 for Sl.No.12.
Cost of Welding electrode for Sl.No.5,6,7 & 9
Cost of cutting Gas for Sl.No.1,4 to 9
Cost of Consumable and T&P for Sl.No.1 to 12
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_772579.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid