Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC 20 1 CHANDRA NIVAS APPLEBY ROAD WELLINGTON COONOOR NILGIRIS 643 232 | COONOOR | NILGIRIS | TAMIL NADU | 643232 | ₹1.1 Cr | L1 | Accepted-AOC aoc |
| 2 | L2₹1.1 Cr+₹51,237.19 (0.47%)Rejected-Finance ASHOKA PARK PALLAVA PARK BVT INS VISHWAKARMA INDIAN NAVY OF GE ND VISAKHAPATNAM | ₹1.1 Cr+₹51,237.19 (0.47%) | L2 | Rejected-Finance being L2 |
| 3 | L3₹1.2 Cr+₹14.1 L (13.1%)Rejected-Finance C 101 ADG P CHENNAI | ₹1.2 Cr+₹14.1 L (13.1%) | L3 | Rejected-Finance being L3 |
| 4 | L4₹1.2 Cr+₹14.2 L (13.1%)Rejected-Finance C 234 ADG P CHENNAI | ₹1.2 Cr+₹14.2 L (13.1%) | L4 | Rejected-Finance being L4 |
| 5 | L5₹1.2 Cr+₹15.3 L (14.1%)Rejected-Finance 10 324 17 BALAJI NAGAR ARUVANKADU COONOOR THE NILGIRIS TAMIL NADU 643202 | COONOOR | THE NILGIRIS | TAMIL NADU | 643202 | ₹1.2 Cr+₹15.3 L (14.1%) | L5 | Rejected-Finance being L5 |
| Sl No | Description | Qty | Unit | GMS Builders L4 | M SUNDARARAJAN L5 | K.AYYAPPAN L10 | KSR AND COMPANY L9 | P K ENTERPRISES L1 | Vishnu Infrastructures L6 | sree karthika fabs L8 | lakshmibuilders L7 | SREE CONSTRUCTIONS L2 | ACE PROMOTERS L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M & L for removing existing damaged flooring of any thickness and removing debris outsie MD land and cleaning the surfaces thoroughly to prepare it for further treatment complete all as directed by engg in charge. | 1,250 | Square Metre | 86 ₹1,07,500 | 95 ₹1,18,750 | 89 ₹1,11,250 | 111 ₹1,38,750 | 125 ₹1,56,250 | 140 ₹1,75,000 | 85 ₹1,06,250 | 81 ₹1,01,250 | 80 ₹1,00,000 Lowest | 83 ₹1,03,750 |
| 2.00 | Supply and application of self levelling and smoothing compound for internal sub-floors, used for levelling and smoothing uneven rigid substrates such as concrete and cement/sand screeds prior to the installation of floor, applied at a nominal thickness of 3mm to achive a smooth, level and uniform surface suitable for subsequent floor finishes complete all as specified and directed. (Make: Any make approved by BWF/ITF/FIBA) | 1,250 | Square Metre | 1,175 ₹14,68,750 | 1,175 ₹14,68,750 | 1,235 ₹15,43,750 | 1,199 ₹14,98,750 | 1,000 ₹12,50,000 Lowest | 1,160 ₹14,50,000 | 1,375 ₹17,18,750 | 1,200 ₹15,00,000 | 1,010 ₹12,62,500 | 1,190 ₹14,87,500 |
| 3.00 | Supply and application of PU primer to the prepared surface to ensure proper adhesion betwen the substrate and PU flooring system all as per the manufacturer's instructions complete all as specified and directed. (Make: "Sunflex Neo" of Sunflex Sports Infrastructure Pvt Ltd or equivalent make as approved by BWF/ITF/FIBA) | 1,250 | Square Metre | 1,125 ₹14,06,250 | 1,130 ₹14,12,500 | 1,165 ₹14,56,250 | 1,150 ₹14,37,500 | 1,015 ₹12,68,750 | 1,150 ₹14,37,500 | 1,125 ₹14,06,250 | 1,200 ₹15,00,000 | 900 ₹11,25,000 Lowest | 1,108 ₹13,85,000 |
| 4.00 | Supply and application of PU soft base layer alongwith semi-rigid PU layer to achieve a total thickness of 3-5 mm all as per the manufacturer's instructions complete all as specified and directed. (Make: "Sunflex Neo" of Sunflex Sports Infrastructure Pvt Ltd or equivalent make as approved by BWF/ITF/FIBA) | 1,250 | Square Metre | 3,125 ₹39,06,250 | 3,200 ₹40,00,000 | 3,300 ₹41,25,000 | 3,170 ₹39,62,500 | 3,050 ₹38,12,500 | 3,150 ₹39,37,500 | 3,125 ₹39,06,250 | 3,200 ₹40,00,000 | 2,850 ₹35,62,500 Lowest | 3,250 ₹40,62,500 |
| 5.00 | Supply and application of polyurethane top coat of approved colour in mat finish with thickness of 1.5mm all as per the manufacturer's instructions complete all as specified and directed. (Make: "Sunflex Neo" of Sunflex Sports Infrastructure Pvt Ltd or equivalent make as approved by BWF/ITF/FIBA) | 1,250 | Square Metre | 1,385 ₹17,31,250 | 1,480 ₹18,50,000 | 1,400 ₹17,50,000 | 1,485 ₹18,56,250 | 1,185 ₹14,81,250 | 1,400 ₹17,50,000 | 1,385 ₹17,31,250 | 1,400 ₹17,50,000 | 1,100 ₹13,75,000 Lowest | 1,370 ₹17,12,500 |
| 6.00 | M & L for marking the game line using high quality PU compatible white marking paint complete all as specified and directed. | 300 | Running Metre | 275 ₹82,500 | 275 ₹82,500 | 300 ₹90,000 | 311 ₹93,300 | 200 ₹60,000 Lowest | 250 ₹75,000 | 275 ₹82,500 | 300 ₹90,000 | 200 ₹60,000 Lowest | 280 ₹84,000 |
| 7.00 | Dismantling of wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. (Note: The work shall be carried out upto 15m height and the unit quoted rate shall deemed to be inclusive of this aspect) | 11.15 | Quintal | 552 ₹6,154.8 | 590 ₹6,578.5 | 600 ₹6,690 | 660 ₹7,359 | 500 ₹5,575 Lowest | 700 ₹7,805 | 550 ₹6,132.5 | 600 ₹6,690 | 500 ₹5,575 Lowest | 550 ₹6,132.5 |
| 8.00 | M & L for Mild steel framed work such as grills, gratings, gates etc., with ends of bars shouldered and/or riveted, or forged into spikes, framed guard bar, barred iron doors, ladders, framed balusters, walk ways, railings, framework of water tanks and similar work conforming to Fe-290, Gde E-165 complete all as specified and directed. (Note: The work shall be carried out upto 15m height and the unit quoted rate shall deemed to be inclusive of this aspect) | 850 | Kilogram | 236 ₹2,00,600 | 230 ₹1,95,500 | 220 ₹1,87,000 | 243 ₹2,06,550 | 199 ₹1,69,150 Lowest | 250 ₹2,12,500 | 235 ₹1,99,750 | 200 ₹1,70,000 | 220 ₹1,87,000 | 235 ₹1,99,750 |
| 9.00 | M & L for Welded steel wire fabric, n.exc 4Kg/Sqm supplied and fixed complete to wood or steel members complete all as specified and directed. (Note: The work shall be carried out upto 15m height and the unit quoted rate shall deemed to be inclusive of this aspect) | 380 | Kilogram | 287 ₹1,09,060 | 275 ₹1,04,500 | 260 ₹98,800 | 291 ₹1,10,580 | 250 ₹95,000 Lowest | 270 ₹1,02,600 | 285 ₹1,08,300 | 250 ₹95,000 Lowest | 270 ₹1,02,600 | 280 ₹1,06,400 |
| 10.00 | Taking down cement plaster on brick or stone walls etc including racking out joints, hacking for key, scrubbing down with water complete all as specified and directed. | 20 | Square Metre | 117 ₹2,340 | 140 ₹2,800 | 90 ₹1,800 Lowest | 127 ₹2,540 | 100 ₹2,000 | 150 ₹3,000 | 115 ₹2,300 | 120 ₹2,400 | 110 ₹2,200 | 110 ₹2,200 |
Tender Value
₹1.1 Cr
EMD Value
₹1.9 L
Closing Date
12 Aug 2026, 6:00 pmClosed
CWE WELLINGTON
Headquarters Commander Works Engineers Wellington Barracks Post The Nilgiris PIN 643 231
SPECIAL REPAIRS TO SYNTHETIC FLOORING OF 01 X VOLLEY BALL COURT AND 02 X BADMINTON COURTS AND BIRD PROOFING AND ALLIED WORKS IN EKALAVYA BLDG AT DSSC WELLINGTON UNDER GE DSSC WELLINGTON
2026_MES_778669_1
85043/E8
Open Tender
Civil Works
Item Rate
180 days
WELLINGTON
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
GE DSSC WELLINGTON
₹1.9 L
Yes
18 Sept 2026
15 Jul 2026
14 Aug 2026
15 Jul 2026
12 Aug 2026
5 Aug 2026
16 Jul 2026 - 21 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M & L for existing damaged flooriung of any thick and cleaning the surfaces thoroughly to prepare it for further treatment complete all as directed by the Engr-in-Charge | - | Square Metre | - | - |
| 2 | Supply and application of self levelling and smoothing compound for internal sub-floors, used for levelling and smoothing uneven rigid substrates such as concrete and cement/sand screeds prior to the installation of floor, applied at a nominal thickness of 3mm to achive a smooth, level and uniform surface suitable for subsequent floor finishes complete all as specified and directed. (Make: Any make approved by BWF/ITF/FIBA) | - | Square Metre | - | - |
| 3 | Supply and application of PU primer to the prepared surface to ensure proper adhesion betwen the substrate and PU flooring system all as per the manufacturer's instructions complete all as specified and directed. (Make: "Sunflex Neo" of Sunflex Sports Infrastructure Pvt Ltd or equivalent make as approved by BWF/ITF/FIBA) | - | Square Metre | - | - |
| 4 | Supply and application of PU soft base layer alongwith semi-rigid PU layer to achieve a total thickness of 3-5 mm all as per the manufacturer's instructions complete all as specified and directed. (Make: "Sunflex Neo" of Sunflex Sports Infrastructure Pvt Ltd or equivalent make as approved by BWF/ITF/FIBA) | - | Square Metre | - | - |
| 5 | Supply and application of polyurethane top coat of approved colour in mat finish with thickness of 1.5mm all as per the manufacturer's instructions complete all as specified and directed. (Make: "Sunflex Neo" of Sunflex Sports Infrastructure Pvt Ltd or equivalent make as approved by BWF/ITF/FIBA) | - | Square Metre | - | - |
| 6 | M & L for marking the game line using high quality PU compatible white marking paint complete all as specified and directed. | - | Running Metre | - | - |
| 7 | Dismantling of wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. (Note: The work shall be carried out upto 15m height and the unit quoted rate shall deemed to be inclusive of this aspect) | - | Quintal | - | - |
| 8 | M & L for Mild steel framed work such as grills, gratings, gates etc., with ends of bars shouldered and/or riveted, or forged into spikes, framed guard bar, barred iron doors, ladders, framed balusters, walk ways, railings, framework of water tanks and similar work conforming to Fe-290, Gde E-165 complete all as specified and directed. (Note: The work shall be carried out upto 15m height and the unit quoted rate shall deemed to be inclusive of this aspect) | - | Kilogram | - | - |
| 9 | M & L for Welded steel wire fabric, n.exc 4Kg/Sqm supplied and fixed complete to wood or steel members complete all as specified and directed. (Note: The work shall be carried out upto 15m height and the unit quoted rate shall deemed to be inclusive of this aspect) | - | Kilogram | - | - |
| 10 | Taking down cement plaster on brick or stone walls etc including racking out joints, hacking for key, scrubbing down with water complete all as specified and directed. | - | Square Metre | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
tmrgd_85043.pdf
Tender Documents • 1.40 MB
BOQ_872130.xls
BOQ • 0.26 MB
corr_1.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .