Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical KANKEBONG BUSTY P O P S LODHAMA LODHAMA DARJEELING 734201 | LODHAMA | DARJEELING | WEST BENGAL | 734201 | Admitted-Fee/PreQual/Technical |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
25 Sept 2026, 5:00 pmClosed
Administrator
Kalimpong Municipality Office Upper Cart Road
Repairing and Restoration of Road Connecting Dahal Gaon (1260 mts) with MASTIC ASPHALT 25mm thick, with, Drain within ward no XVII under Kalimpong Municipality
2026_MAD_5022054_3
3/KM/ Kalimpong Town dt. 02.09.2026
Open Tender
CIVIL WORKS
Percentage
Kalimpong Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹2.4 L
Yes
28 Sept 2026
3 Sept 2026
28 Sept 2026
3 Sept 2026
25 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART A | |||||
| 1.011 | 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources) | 67.5 | Cum | 7,878.5 | ₹5,31,798.75 |
| 1.02 | Centering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of columns, etc. for mass concrete | 540 | Sqm | 392.15 | ₹2,11,761 |
| 1.03 | 20 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) | 900 | Sqm | 471.35 | ₹4,24,215 |
| 1.04 | Neat cement punning. | 900 | sqm | 79.95 | ₹71,955 |
| 1.05 | GST Correction Factor @ 0.973 on Subtotal of Part A | 1 | Each | - | - |
| 1.06 | Add Cost Index @ 37% on Corected Subtotal of Part A | 1 | Each | - | - |
| 2PART B | |||||
| 2.01 | Water Bound Macadam
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density (Reference to MoRT&H's specification 404). GRADING 1 | 241.5 | Cum | 3,251.95 | ₹7,85,345.92 |
| 2.02 | Bituminous Macadam
Providing and laying bituminous macadam with 100-120 TPH hot mix plant using crushed aggregates of specified grading premixed with approved bituminous binder @ 3.3% (min) for Grading -1 and 3.4% (min) for Grading -2 by weight of total mix , transported to site, laid over a previously prepared base with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction (Reference to MORT&H's specification clause 504). or Grading II (19 mm nominal maximum aggregate size) Layer Thickness 50-75mm | 227.25 | cum | 14,348.81 | ₹32,60,767.07 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
BOQ_5101947.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .