Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.7 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹21.4 L+₹71,418.60 (3.45%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹46,000
Closing Date
31 Dec 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE M G C C Div 8 Bulandshahr
EE M G C C Div 8 Bulandshahr
Lot 1 Const. of VRB at Km. 0.945 of Kamalpur Dy.
2025_UPIDC_1101709_1
03/EE/2025-26
Open Tender
Civil Works - Canal
Item Wise
90 days
SAMBHAL
2 documents required · 2 mandatory
₹944
₹46,000
Yes
28 Jan 2026
26 Dec 2025
1 Jan 2026
26 Dec 2025
31 Dec 2025
26 Dec 2025
26 Dec 2025 - 31 Dec 2025
Earth work in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T&P leads and lift etc complete.
Providing and laying of Cement Concrete (M-10 grade) 1:3:6 including cost of all material, labour and T&P etc. complete required for proper complition of work.
Providing and laying of Cement Concrete (M-15 grade) 1:2.4 including cost of all material, labour and T&P etc. complete required for proper complition of work.
Providing and laying first class M-150 brick work in (1:4) cement mortar including cost of all materials, labour, T&P, all lifts and leads etc. complete.
Providing and laying R.C.C. M-20 (1:1.5:3) cement concrete including cost of all material labour and T&P all lift and leads etc. complete
Providing and laying C.C. M-25 (1:1:2) cement concrete including cost of all material labour and T&P all lift and leads etc. complete
Providing and fixing Centering & shuttering including cost of all material labour, T&P, all lifts and leads, etc for proper completion of work for C.C. work.
Providing and fixing Centering & shuttering including cost of all material labour, T&P, all lifts and leads, etc for proper completion of work for R.C.C. work.
Supply and fixing of 20 mm expansion joint in slab between dirt wall and slab including cost all labour, T&P material etc. complete as per direction of Engineer-in-Charge.
Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position, all lifts and leads, all material labour and T&P etc. complete
12.5 mm Thick Plaster in 1:4 Cement mortar including cost of all material labour, T&P, Curing etc. complete for proper completion of work.
Providing and laying local sand below floor including cost of all materials, labour and T&P all lift and leads etc. complete
Providing and painting Bitumin (85/40 grade) in two coats including cost of all material, T&P, heating, labour all lifts and leads etc. complete as per direction of Engineer-in-Charge.
S/L of two coat tar Fell Painting including cost of all material, labour, T&P complete for proper completion of work.
P/F 150 mm dia PVC Pipe in proper position for drainage spout including all material, labour and T&P etc. required for proper completion of work
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.57 MB
TD1.pdf
Tender Documents • 7.47 MB
BOQ_2031156.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .